National projects
68projects
₱2.43Bin all
23ongoing
3slow
- Roads and bridges ₱2.03B
- Flood control ₱261.7M
- Buildings ₱68.1M
- Schools ₱35.7M
- Other ₱19.6M
- Water ₱9.8M
Repair of permanent bridges- bical br. (b00411sm) along san juanico-basey-sohoton rd. (s00129sm), Brgy. san pedro
Roads and bridges · 2026 · BCG DESIGN AND CONSTRUCTION
₱14.4MNot Yet Started · 0%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
FRD CONSTRUCTION7 projects · ₱168.0M
2
CDU CONSTRUCTION6 projects · ₱266.9M
3
JFR CONSTRUCTION INC.6 projects · ₱104.3M
4
PYUKEI CONSTRUCTION INC.6 projects · ₱74.6M
5
ETAN CONSTRUCTION5 projects · ₱95.2M