Mabinay: Government

Municipality in Negros Oriental, Negros Island, Visayas · 32 barangays

National projects

Built by DPWH in Mabinay since 2016.

263projects
₱4.61Bin all
22ongoing
3slow
  • Roads and bridges ₱2.91B
  • Flood control ₱980.7M
  • Schools ₱418.9M
  • Buildings ₱266.6M
  • Other ₱17.0M
  • Water ₱14.3M

Showing 1 to 30 of 263

Construction of box culvert bridge, Barangay hagtu Flood control · 2026 · PHILSOUTH BUILDERS INC
₱9.8MOn-Going · 0%
Construction of road, Sta. 0+000 -sta. 0+390, Barangay inapoy Roads and bridges · 2026 · ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.
₱7.4MOn-Going · 0%
Preventive maintenance - primary roads - bais - kabankalan rd - k0064+209 - k0065+430 Roads and bridges · 2026 · HOMEWORLD CONSTRUCTION CORP.
₱29.4MOn-Going · 98%
₱34.5MOn-Going · 72%
₱4.9MOn-Going · 74%
Construction of multi-purpose building (sports complex) Buildings · 2025 · PHILSOUTH BUILDERS INC
₱48.5MOn-Going · 60%
Concreting of sitio proper to sitio camadmad fmr, Brgy. old namangka Roads and bridges · 2025 · VESA ENGINEERING AND CONSTRUCTION
₱14.2MOn-Going · 100%
Preventive maintenance-primary roads along bais-kabankalan road-k0078+403-k0078+873 Roads and bridges · 2025 · HOMEWORLD CONSTRUCTION CORP.
₱11.0MCompleted · 100%
₱15.0MOn-Going · 100%
Construction/maintenance of flood mitigation structures and drainage systems - construction of flood control structure, Batang river, Barangay lumbang Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING / S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱141.2MOn-Going · 49%
Construction/maintenance of flood mitigation structures and drainage systems - construction of flood control structure, Di-ay river, Negros o Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING / S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱141.0MOn-Going · 50%
Construction/maintenance of flood mitigation structures and drainage systems - construction of flood control structure (downstream), Barangay luyang Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING / S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱141.1MOn-Going · 47%
Widening - primary roads - bais - kabankalan rd - k0094+000 - k0095+000 Roads and bridges · 2025 · HOMEWORLD CONSTRUCTION CORP.
₱63.9MCompleted · 100%
₱68.8MOn-Going · 40%
Construction of road, Barangay inapoy Roads and bridges · 2025 · SUPREME MEGA STRUCTURE BUILDERS, INC.
₱9.7MOn-Going · 100%
Construction of multi-purpose building(sports complex) Buildings · 2024 · R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC.
₱29.7MOn-Going · 100%
Construction of farm-to-mill road, Sitio polog, Samac to sitio polog, Samac Roads and bridges · 2024 · R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC.
₱16.7MCompleted · 100%
Construction of farm-to-mill road, Brgy. tara, Negros oriental - brgy. pantao Roads and bridges · 2024 · R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC.
₱16.7MCompleted · 100%
Construction of bulod river control(upstream), Negros o Flood control · 2024 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱96.5MOn-Going · 59%Slow
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of namangyan river control, Bagtic Flood control · 2024 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱96.5MOn-Going · 94%
Construction of riverbank protection structure along ilog river Flood control · 2024 · UY CONDEV CORPORATION
₱99.0MCompleted · 100%
₱17.1MCompleted · 100%
Concreting of brgy. cansal-ing fmr, Brgy. cansal-ing Roads and bridges · 2024 · RICHFIELD BUILDERS, INC.
₱19.9MCompleted · 100%
Concreting of sitio tumpalak to sitio matotob, Brgy. dahile fmr, Brgy. dahile Roads and bridges · 2024 · MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP.
₱14.9MCompleted · 100%
Construction of 2 units 2-storey 6-classroom school building in mabinay central school, Barangay poblacion, Municipality of mabinay Schools · 2024 · PER CONSTRUCTION AND SUPPLY / VVER CONSTRUCTION DEVELOPMENT CORPORATION
₱39.8MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Mabinay since 2016.

1
SUPREME MEGA STRUCTURE BUILDERS, INC.40 projects · ₱119.1M
2
VESA ENGINEERING AND CONSTRUCTION17 projects · ₱259.3M
3
ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.17 projects · ₱63.5M
4
PHILSOUTH BUILDERS INC16 projects · ₱674.6M
5
R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC.16 projects · ₱287.3M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →