Valderrama: Government

Municipality in Antique, Western Visayas, Visayas · 22 barangays

National projects

Built by DPWH in Valderrama since 2016.

71projects
₱2.50Bin all
21ongoing
4slow
  • Roads and bridges ₱1.92B
  • Flood control ₱326.9M
  • Buildings ₱115.7M
  • Schools ₱62.5M
  • Water ₱41.0M
  • Other ₱34.7M

No project matches these filters.

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Valderrama since 2016.

1
IBC INTERNATIONAL BUILDERS CORPORATION13 projects · ₱1.32B
2
SETTLERS BUILDER4 projects · ₱56.9M
3
SUNWEST, INC.3 projects · ₱85.0M
4
ONE PIECE BUILDERS3 projects · ₱58.9M
5
KYRO BUILDERS, INC.3 projects · ₱31.4M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →