San Lorenzo: Government

Municipality in Guimaras, Western Visayas, Visayas · 12 barangays

National projects

Built by DPWH in San Lorenzo since 2016.

135projects
₱2.27Bin all
8ongoing
0slow
  • Roads and bridges ₱1.83B
  • Flood control ₱232.1M
  • Schools ₱117.0M
  • Buildings ₱81.2M
  • Water ₱9.7M
₱9.6MOn-Going · 100%
Concreting of sitio badyang i to sitio badyang ii, Brgy. igcawayan fmr, Brgy. igcawayan Roads and bridges · 2024 · S.T. SALCEDO CONSTRUCTION CORP.
₱14.7MOn-Going · 87%
Rehabilitation/major repair of bridge-mantasic br. (b00004gr) along guimaras circumferential rd Roads and bridges · 2023 · SKAB DRAGON CONSTRUCTION SERVICES CO.
₱7.8MOn-Going · 96%
₱8.5MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in San Lorenzo since 2016.

1
S.T. SALCEDO CONSTRUCTION CORP.36 projects · ₱537.9M
2
J.E. TICO CONSTRUCTION CO., INC.31 projects · ₱885.1M
3
KIRSKAT VENTURE13 projects · ₱159.8M
4
ALJ CONSTRUCTION AND SUPPLY9 projects · ₱19.5M
5
A MAQUILING CONSTRUCTION AND SUPPLY8 projects · ₱35.1M