National projects
5356projects
₱91.36Bin all
428ongoing
32slow
- Roads and bridges ₱51.14B
- Flood control ₱22.24B
- Buildings ₱11.74B
- Schools ₱5.37B
- Other ₱463.8M
- Water ₱391.0M
Showing 241 to 270 of 428
Construction (completion) of multi-purpose building, Phase iii, Barangay poblacion
Buildings · Anilao · 2025 · PANAY EAST COAST CONSTRUCTION & SUPPLY
₱24.7MOn-Going · 0%
Access road from the national road, Brgy. san antonio-brgy. sto. angel, San miguel - brgy. baguingin-lanot, Alimodian leading to goducate
Roads and bridges · San Miguel · 2025 · CABILAUAN CONSTRUCTION AND SUPPLY
₱19.5MOn-Going · 100%
Construction of river control structure along tigum river in maasin, Iloilo (package 6)
Flood control · Maasin · 2025 · IBC INTERNATIONAL BUILDERS CORPORATION
₱145.0MOn-Going · 0%
Construction of sibalom river flood control structure
Flood control · Tigbauan · 2025 · ASIA STRUCTURAL DEVELOPER CORPORATION
₱17.6MOn-Going · 100%
Rehabilitation / major repair of bridge - aganan br. 4 (b00046pn) along iloilo-capiz rd (pavia diversion)
Roads and bridges · Pavia · 2025 · 1 BEATUS BUILDERS CORP.
₱14.7MOn-Going · 1%
Construction of multi - purpose building, Phase ii
Buildings · Anilao · 2025 · PANAY EAST COAST CONSTRUCTION & SUPPLY
₱19.9MOn-Going · 1%
Replacement of permanent weak bridges- oyungan br. (b00135pn) along iloilo- antique rd
Roads and bridges · Miagao · 2025 · MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
₱96.4MOn-Going · 56%
Construction of seawall/ storm surge, Coastal road
Flood control · Dumangas · 2025 · TIB TIMCO INFRA BUILDERS
₱19.5MOn-Going · 88%
Construction (completion) of multi - purpose building, Phase i
Buildings · San Enrique · 2025 · RESTIA BUILDERS CORPORATION
₱14.8MOn-Going · 88%
Rehabilitation/major repair of permanent bridges- imelda marcos br. (b00176pn) along mandurriao- sn miguel- alimodian- maasin- cabatuan rd
Roads and bridges · Maasin · 2025 · SILVERRIA CONSTRUCTION AND CONSTRUCTION SUPPLY COMPANY, OPC
₱31.7MOn-Going · 79%
Rehabilitation/major repair of permanent bridges - jaro br. 2 (b00556pn) along president corazon c. aquino ave.
Roads and bridges · Pavia · 2025 · JMPTECH CONSTRUCTION & SUPPLY
₱4.8MOn-Going · 100%
Construction of flood control/ slope protection along jalaur river
Flood control · Dumangas · 2025 · WOODLAND CONSTRUCTION & SUPPLY, INC.
₱38.8MOn-Going · 96%
Widening of permanent bridges- jalaur bridge (b00194pn) along iloilo- capiz (new route)
Roads and bridges · Passi City · 2025 · ALLENCON DEVELOPMENT CORPORATION
₱122.0MOn-Going · 26%
Construction of multi - purpose building, Phase 1
Buildings · Anilao · 2025 · PANAY EAST COAST CONSTRUCTION & SUPPLY
₱12.8MOn-Going · 0%
Preventive maintenance of road: asphalt overlay - pototan - tina - lambunao rd - k0034 + 401 - k00307 + 000
Roads and bridges · Pototan · 2025 · J.E. TICO CONSTRUCTION CO., INC.
₱91.2MOn-Going · 97%
Construction of river control structure along tigum river in cabatuan, Iloilo (package 5)
Flood control · Maasin · 2025 · ALLENCON DEVELOPMENT CORPORATION
₱93.6MOn-Going · 78%
Construction of river control/ with impounding structure along ulian river in lambunao, Iloilo (package 5)
Flood control · Calinog · 2025 · MJ BARCELONA CONSTRUCTION AND SUPPLY / STEVEN CONSTRUCTION & SUPPLY
₱96.0MOn-Going · 90%
Rehabilitation/improvement of building 1 (industrial technology building), Miagao campus- iloilo science and technology university
Buildings · Miagao · 2024 · J.E. TICO CONSTRUCTION CO., INC.
₱6.9MOn-Going · 0%
Construction of river control/with impounding structure along suage river in janiuay, Iloilo (package 5)
Flood control · Janiuay · 2025 · ALLENCON DEVELOPMENT CORPORATION
₱96.0MOn-Going · 80%
Installation/application of road safety facilities (roadway lighting) along iloilo - antique rd - k0003 + (-924) - k0008 + 214 and mandurriao - sn miguel rd - k0006 + 096 - k0009 + 483
Roads and bridges · Oton · 2025 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱39.1MOn-Going · 51%
Construction of drainage structure along road - president corazon c. aquino ave. - (s00512pn) chainage 061 - chainage 201, Chainage 217 - chainage 384, (s00513pn) chainage 000 - chainage 163, Chainage 177 - chainage 325
Flood control · Pavia · 2025 · NOE'S BUILDERS
₱48.0MOn-Going · 51%
Preventive maintenance of road: asphalt overlay - iloilo - capiz (new route) - k0042 + 325 - k0043 + 745, K0044 + 501 - k0046 + 213
Roads and bridges · Dueñas · 2025 · IBC INTERNATIONAL BUILDERS CORPORATION
₱124.8MOn-Going · 100%
Construction of flood control structure along ulian river, Section 8
Flood control · Dueñas · 2025 · IBC INTERNATIONAL BUILDERS CORPORATION
₱147.4MOn-Going · 44%
Rehabilitation/ major repair of bridge - pani-an br. (b00220pn) along iloilo east coast-estancia wharf rd
Roads and bridges · Balasan · 2025 · A.D. PENDON CONSTRUCTION & SUPPLY, INC.
₱9.0MOn-Going · 47%
Construction of concrete bridge- barotac viejo bypass road
Roads and bridges · Barotac Viejo · 2025 · F. GURREA CONSTRUCTION, INCORPORATED
₱130.1MOn-Going · 10%
Construction of road slope protection structure- iloilo east coast- capiz rd- k0241+400- k0241+460
Roads and bridges · Barotac Viejo · 2025 · A.D. PENDON CONSTRUCTION & SUPPLY, INC.
₱76.5MOn-Going · 94%
Preventive maintenance of road: asphalt overlay- passi- san rafael- lemery- sara rd- k0081+430- k0082+580
Roads and bridges · Ajuy · 2025 · F. GURREA CONSTRUCTION, INCORPORATED
₱48.2MOn-Going · 100%
Rehabilitation/ major repair of bridge - gerongan br. (b00225pn) along passi-sn rafael-lemery-sara rd
Roads and bridges · Ajuy · 2025 · A.D. PENDON CONSTRUCTION & SUPPLY, INC.
₱25.6MOn-Going · 25%
Rehabilitation/major repair of bridge- fuente bunglas br. (b00223pn) along ajuy- jamul- awon- concepcion rd
Roads and bridges · Ajuy · 2025 · A.D. PENDON CONSTRUCTION & SUPPLY, INC.
₱26.4MOn-Going · 76%
Construction (completion) of multi-purpose building, Barangay botongon
Buildings · Estancia · 2025 · VIRGIN BUILDERS CONSTRUCTION
₱2.0MOn-Going · 81%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
A.D. PENDON CONSTRUCTION & SUPPLY, INC.203 projects · ₱8.28B
2
IBC INTERNATIONAL BUILDERS CORPORATION196 projects · ₱15.71B
3
JHALL MARKETING & SERVICES180 projects · ₱743.9M
4
VIRGIN BUILDERS CONSTRUCTION162 projects · ₱1.08B
5
1 BEATUS BUILDERS CORP.158 projects · ₱1.18B