National projects
140projects
₱1.45Bin all
9ongoing
1slow
- Flood control ₱446.5M
- Buildings ₱445.3M
- Roads and bridges ₱298.0M
- Schools ₱263.8M
Iloilo circumferential road 2, Iloilo- sta. 2+942- sta. 3+576; sta. 5+103.00- sta. 5+632.00; sta. 2+363- sta. 2+563
Roads and bridges · 2026 · PATRILA BUILDERS, INC.
₱59.1MNot Yet Started · 0%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.