GU
Guinobatan: Government
Municipality in Albay, Bicol, Luzon · 44 barangays
National projects
223projects
₱8.35Bin all
89ongoing
13slow
- Flood control ₱4.31B
- Roads and bridges ₱2.87B
- Buildings ₱669.0M
- Schools ₱402.3M
- Water ₱95.4M
Showing 31 to 60 of 223
Rehabilitation/major repair of permanent bridges-guinobatan br. (b00292lz) along daang maharlika (lz), Albay (3rd legislative district)
Roads and bridges · 2024 · RC125 CONSTRUCTION
₱7.3MOn-Going · 0%Slow
Completion/equipping of super health centers - guinobatan super health center, Oriental mindoro
Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱5.8MOn-Going · 41%Slow
Construction of classrooms - construction of 2-storey 8-classroom school building in mauraro high school, Barangay mauraro
Schools · 2024 · WCS CONSTRUCTION, INC.
₱35.7MOn-Going · 85%
Construction/maintenance of flood mitigation structures and drainage systems-construction of nasisi river flood mitigation structure, Brgy. basag, Ligao c
Flood control · 2024 · WCS CONSTRUCTION, INC.
₱187.6MOn-Going · 89%
Cluster 11 - convergence and special support program - sustainable infrastructure projects allevating gaps (sipag) - sipag - access roads and/or bridges from the national road/s leading to major/ strategic public buildings/ facilities
Roads and bridges · 2024 · NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION
₱39.2MOn-Going · 3%Slow
Widening-primary roads-vi-i: daang maharlika (lz)-k0513+870-k0513+966, K0514+000-k0514+440, K0518+706-k0519+000; vi-ii: daang maharlika (lz
Roads and bridges · 2024 · GLOBALCRETE BUILDERS INC.
₱120.7MOn-Going · 26%Slow
Construction of multi-purpose building, Barangay palanas
Buildings · 2024 · AVIC CONSTRUCTION AND SUPPLY(FOR. AVIC CONST.)
₱4.8MOn-Going · 87%
Construction of multi-purpose building, Barangay morera
Buildings · 2024 · AVIC CONSTRUCTION AND SUPPLY(FOR. AVIC CONST.)
₱4.8MOn-Going · 50%Slow
Construction/maintenance of flood mitigation structures and drainage systems-construction of san rafael river control, San rafael, Gu
Flood control · 2024 · 3DIAMONDS CONSTRUCTION CORPORATION
₱72.4MCompleted · 100%
Rehabilitation of sinungtan-palanas road
Roads and bridges · 2024 · TRIPARTITE ENGINEERING AND CONSTRUCTION
₱9.1MOn-Going · 53%Slow
Concreting of brgy. gumian-batbat fmr, Brgy. gumian-batbat
Roads and bridges · 2024 · TRIPARTITE ENGINEERING AND CONSTRUCTION
₱14.2MOn-Going · 91%
Concreting of maninila - tandarora - san francisco fmr
Roads and bridges · 2024 · DN'D CONSTRUCTION AND DEVELOPMENT
₱19.9MCompleted · 100%
Concreting of sitio mawaswas, Batbat to ongo fmr
Roads and bridges · 2024 · TRIPARTITE ENGINEERING AND CONSTRUCTION
₱14.9MOn-Going · 0%Slow
Construction of san francisco river flood mitigation structures, Brgy. maguiron and brgy. m
Flood control · 2024 · 3DIAMONDS CONSTRUCTION CORPORATION
₱99.0MOn-Going · 89%
Construction of by-pass and diversion roads - camalig bypass road
Roads and bridges · 2024 · BIEN RAICE CONSTRUCTION AND SUPPLY CORPORATION
₱19.6MCompleted · 100%
Construction / maintenance of flood mitigation structures and drainage systems - construction of flood mitigation structures in minto, Alba
Flood control · 2024 · 3DIAMONDS CONSTRUCTION CORPORATION
₱48.2MOn-Going · 97%
Construction of multi-purpose building (covered court), Barangay san jose
Buildings · 2024 · TRIPARTITE ENGINEERING AND CONSTRUCTION
₱5.0MCompleted · 100%
Construction/ maintenance of flood mitigation structures and drainage systems - construction of ugsong river flood control structure (left and right
Flood control · 2024 · SISBRO CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Installation of road safety devices and facilities along guinobatan poblacion rd (s03721lz) - k0511 + (-622) - k0511 + 378, Al
Roads and bridges · 2024 · REO BUILDERS
₱3.4MOn-Going · 31%Slow
Construction of multi-purpose building (covered court), Barangay bubulusan
Buildings · 2024 · AVIC CONSTRUCTION AND SUPPLY(FOR. AVIC CONST.)
₱5.0MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems - construction of maninila river (brgy.maninila - brgy. masarawag) flood
Flood control · 2024 · WCS CONSTRUCTION, INC.
₱102.3MCompleted · 100%
Construction/ maintenance of flood mitigation structures and drainage systems - construction of flood mitigation structure along basag river (upstrea
Flood control · 2024 · JACKNEL CONSTRUCTION / SISBRO CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Widening -tertiary roads, Guinobatan poblacion rd, K0511+041 - k0511+150
Roads and bridges · 2024 · AJ422 CONSTRUCTION
₱4.8MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems - construction of basag river control structure, Upstream of spillway, Ba
Flood control · 2024 · SISBRO CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of multi-purpose building (covered court), Kenny village, Mauraro
Buildings · 2024 · AVIC CONSTRUCTION AND SUPPLY(FOR. AVIC CONST.)
₱5.0MCompleted · 100%
Construction / upgrading / rehabilitation of drainage along national roads - tertiary roads - comun-inarado-peñafrancia rd - k0518+538 - k0519+000
Roads and bridges · 2024 · DMMP XCVII CONSTRUCTION
₱16.1MCompleted · 100%
Construction of multi-purpose training and instructional facility/meetings incentives confer
Buildings · 2023 · NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱144.7MOn-Going · 20%Slow
Construction/rehabilitation of water supply/septage and sewerage/rain water collectors - construction of solar water system guinobatan phase i
Water · 2023 · NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION
₱9.5MOn-Going · 74%
Construction/rehabilitation of water supply/septage and sewerage/rain water collectors - construction of solar water system guinobatan phase ii
Water · 2023 · TANGENT CONSTRUCTION
₱9.6MOn-Going · 79%
Construction/rehabilitation of water supply/septage and sewerage/rain water collectors - construction of solar water system, Barangay doña mercedes
Water · 2023 · NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION
₱9.5MOn-Going · 89%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
3DIAMONDS CONSTRUCTION CORPORATION19 projects · ₱992.6M
2
AVIC CONSTRUCTION AND SUPPLY(FOR. AVIC CONST.)19 projects · ₱95.8M
3
RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST.16 projects · ₱944.1M
4
WEARR ENTERPRISES & DEVELOPMENT CORP.12 projects · ₱621.2M
5
WCS CONSTRUCTION, INC.9 projects · ₱678.5M