LA
Lagonoy: Government
Municipality in Camarines Sur, Bicol, Luzon · 38 barangays
National projects
143projects
₱4.89Bin all
16ongoing
1slow
- Roads and bridges ₱2.87B
- Flood control ₱1.73B
- Buildings ₱175.4M
- Schools ₱72.4M
- Water ₱41.4M
Showing 91 to 120 of 120
Upgrading of dam'd pave nat'l rd including drainage based on pavement mangt. system/ (hdm-4) along lagonoy-presentacion road, Baliwag-sta. maria section, Lagonoy & presentacion
Roads and bridges · 2018 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱65.7MCompleted · 100%
Upgrading to paved rd standards (hdm-4) along tigaon-gao-san jose-lagonoy-guijalo via san vicente rd, (managnag section) lagonoy, Cam. sur
Roads and bridges · 2018 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱80.6MCompleted · 100%
Construction/maintenance of flood mitigation structure construction / improvement of flood control structure, Along caguiscan river, Loho
Flood control · 2018 · 128 DRAGON CONSTRUCTION AND SUPPLIES / NFH CONSTRUCTION & SUPPLY
₱36.4MCompleted · 100%
Upgrading of damaged paved national rd, Including drainage based on pavement management system/highway development and management-4 (hdm-4), Goa and lagonoy
Roads and bridges · 2018 · PARTIDO CONSTRUCTION & SUPPLY
₱17.1MCompleted · 100%
Preventive maintenance (asphalt overlay 50mm) along tigaon-goa-san jose-lagonoy-guijalo via san vicente road (barangay camagong-sta. maria section), San jose and lagonoy
Roads and bridges · 2018 · NFH CONSTRUCTION & SUPPLY
₱39.0MCompleted · 100%
Construction of one (1) unit senior high school regular workshop building, Dahat national vocational high school
Schools · 2017 · HRB CONSTRUCTION
₱3.2MCompleted · 100%
Construction of one (1) unit senior high school regular workshop building, San ramon pilot national high school
Schools · 2017 · HRB CONSTRUCTION
₱3.4MCompleted · 100%
Construction of one (1) unit senior high school unique workshop building, San ramon pilot national high school
Schools · 2017 · HRB CONSTRUCTION
₱3.8MCompleted · 100%
Construction of one (1) unit senior high school unique workshop building, Dahat national vocational high school
Schools · 2017 · BRIX CONSTRUCTION AND SUPPLY
₱3.6MCompleted · 100%
Construction of one (1) unit senior high school unique workshop building, Balaton national high school
Schools · 2017 · S & RV CONSTRUCTION & SUPPLY
₱3.9MCompleted · 100%
Construction of one (1) unit senior high school unique workshop building, Himanag national high school
Schools · 2017 · IA FERRER CONSTRUCTION & SUPPLY
₱3.8MCompleted · 100%
Construction of one (1) storey two (2) classroom with toilet attached school building, Burabod elementary school
Schools · 2017 · DONLEE CONSTRUCTION AND SUPPLY
₱2.8MCompleted · 100%
Construction of one (1) storey two (2) classroom with toilet attached school building kinahulogan elem. school
Schools · 2017 · GOLDEN CONSTRUCTION AND SUPPLY
₱2.9MCompleted · 100%
Construction of missing gaps connecting national roads, Including right of way along lalud-garchitorena road, Pinamihagan, Camarines sur sta. 0+000+ sta. 2+889.80
Roads and bridges · 2017 · PARTIDO CONSTRUCTION & SUPPLY
₱79.7MCompleted · 100%
Construction and maintenance of bridge along national roads rehabilitation/major repair of permanent bridge (b00482lz) along goa-san jose-lagonoy-guijalo via san vicente road
Roads and bridges · 2017 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱32.2MCompleted · 100%
Construction of local road, Barangay himanag
Roads and bridges · 2017 · BRIX CONSTRUCTION AND SUPPLY
₱945KCompleted · 100%
Construction of flood control structures, Barangay balaton
Flood control · 2017 · HRB CONSTRUCTION
₱942KCompleted · 100%
Upgrading of damage paved nat'l rd including drainge based on pavement mng't systm/ (hdm-4) (conc. reconst w/ 280mm slab w/ drainage including rd. safety features) along lagonoy-presentacion, Panicuan-sta. maria section, Lagonoy&presntcion c.s.
Roads and bridges · 2017 · PARTIDO CONSTRUCTION & SUPPLY
₱45.6MCompleted · 100%
Improvement including drainage along lagonoy-presentacion road (paving of shoulder with drainage improvement and road safety features) binanuahan-baliwag section, Camarines sur k0498+(-817)-k0498+870;k0499+360-k0501+532
Flood control · 2017 · HGG BUILDERS & SUPPLY
₱46.4MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies traffic benchmark for upgrading to paved standards (hdm-4 project analysis) along tigaon-goa-san jose-lagonoy-guijalo via san vicente road k0503+560-k054+360
Roads and bridges · 2017 · PRECIOUS CONSTRUCTION
₱45.6MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies traffic benchmark for upgrading to paved standards (hdm-4 project analysis) along lagonoy-presentacion road, Loho, Cmarines sur
Roads and bridges · 2017 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱36.7MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads (improvement/construction of drainage including safety features) along lagonoy-presentacion road k0508+686-k0510+750, Cabotonan-buenavista section lagonoy-presentacion
Roads and bridges · 2017 · BICOL GOLDROCK CONSTRUCTION CORPORATION
₱32.9MCompleted · 100%
Construction of 1-unit 2-storey 6-classroom with comfort room and 1-unit 2-storey 4-classroom with comfort room school building, San ramon pilot national high school
Schools · 2016 · PARTIDO CONSTRUCTION & SUPPLY
₱14.6MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay pinamihagan
Buildings · 2017 · HRB CONSTRUCTION
₱2.3MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse and landslide, Lagonoy-presentacion road, K0505+018 to k0520+640 with exceptions
Roads and bridges · 2016 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱93.8MCompleted · 100%
Construction of genorangan - agosais farm to market road (fmr) barangay genorangan
Roads and bridges · 2016 · 2 BROTHERS CONSTRUCTION ENTERPRISES
₱2.8MCompleted · 100%
Construction and maintenance of bridges along national roads (replacement of permanent weak bridge) panicuan bridge (b00489lz), Along lagonoy-presentacion road, Panicuan
Roads and bridges · 2016 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱45.8MCompleted · 100%
Construction and maintenance of bridges along national roads (replacement of permanent weak bridge) caguiscan bridge (b00488lz) along lagonoy-presentacion road, Loho
Roads and bridges · 2016 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱45.9MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies benchmark for upgrading to paved road standards (hdm-4 project analysis) along lagonoy-presentacion road (panagan-omalo section) k0505+847-k0508+000 with exceptions lagonoy
Roads and bridges · 2016 · BICOL GOLDROCK CONSTRUCTION CORPORATION
₱6.8MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies, Traffic benchmark for upgrading to paved road standards (hdm-4 project analysis) jct. balaynan-tabgon-lamon-pinamihagan road
Roads and bridges · 2016 · PARTIDO CONSTRUCTION & SUPPLY
₱89.2MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
HRB CONSTRUCTION24 projects · ₱74.7M
2
E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)21 projects · ₱1.05B
3
PARTIDO CONSTRUCTION & SUPPLY13 projects · ₱692.6M
4
S & RV CONSTRUCTION & SUPPLY11 projects · ₱71.3M
5
G.C.I. CONSTRUCTION AND DEV'T. CORP.8 projects · ₱581.8M