LA
Lagonoy: Government
Municipality in Camarines Sur, Bicol, Luzon · 38 barangays
National projects
143projects
₱4.89Bin all
16ongoing
1slow
- Roads and bridges ₱2.87B
- Flood control ₱1.73B
- Buildings ₱175.4M
- Schools ₱72.4M
- Water ₱41.4M
Showing 121 to 143 of 143
Construction and maintenance of bridge along national roads rehabilitation/major repair of permanent bridge (b00482lz) along goa-san jose-lagonoy-guijalo via san vicente road
Roads and bridges · 2017 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱32.2MCompleted · 100%
Construction of local road, Barangay himanag
Roads and bridges · 2017 · BRIX CONSTRUCTION AND SUPPLY
₱945KCompleted · 100%
Construction of flood control structures, Barangay balaton
Flood control · 2017 · HRB CONSTRUCTION
₱942KCompleted · 100%
Upgrading of damage paved nat'l rd including drainge based on pavement mng't systm/ (hdm-4) (conc. reconst w/ 280mm slab w/ drainage including rd. safety features) along lagonoy-presentacion, Panicuan-sta. maria section, Lagonoy&presntcion c.s.
Roads and bridges · 2017 · PARTIDO CONSTRUCTION & SUPPLY
₱45.6MCompleted · 100%
Improvement including drainage along lagonoy-presentacion road (paving of shoulder with drainage improvement and road safety features) binanuahan-baliwag section, Camarines sur k0498+(-817)-k0498+870;k0499+360-k0501+532
Flood control · 2017 · HGG BUILDERS & SUPPLY
₱46.4MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies traffic benchmark for upgrading to paved standards (hdm-4 project analysis) along tigaon-goa-san jose-lagonoy-guijalo via san vicente road k0503+560-k054+360
Roads and bridges · 2017 · PRECIOUS CONSTRUCTION
₱45.6MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies traffic benchmark for upgrading to paved standards (hdm-4 project analysis) along lagonoy-presentacion road, Loho, Cmarines sur
Roads and bridges · 2017 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱36.7MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads (improvement/construction of drainage including safety features) along lagonoy-presentacion road k0508+686-k0510+750, Cabotonan-buenavista section lagonoy-presentacion
Roads and bridges · 2017 · BICOL GOLDROCK CONSTRUCTION CORPORATION
₱32.9MCompleted · 100%
Construction of 1-unit 2-storey 6-classroom with comfort room and 1-unit 2-storey 4-classroom with comfort room school building, San ramon pilot national high school
Schools · 2016 · PARTIDO CONSTRUCTION & SUPPLY
₱14.6MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay pinamihagan
Buildings · 2017 · HRB CONSTRUCTION
₱2.3MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse and landslide, Lagonoy-presentacion road, K0505+018 to k0520+640 with exceptions
Roads and bridges · 2016 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱93.8MCompleted · 100%
Construction of genorangan - agosais farm to market road (fmr) barangay genorangan
Roads and bridges · 2016 · 2 BROTHERS CONSTRUCTION ENTERPRISES
₱2.8MCompleted · 100%
Construction and maintenance of bridges along national roads (replacement of permanent weak bridge) panicuan bridge (b00489lz), Along lagonoy-presentacion road, Panicuan
Roads and bridges · 2016 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱45.8MCompleted · 100%
Construction and maintenance of bridges along national roads (replacement of permanent weak bridge) caguiscan bridge (b00488lz) along lagonoy-presentacion road, Loho
Roads and bridges · 2016 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱45.9MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies benchmark for upgrading to paved road standards (hdm-4 project analysis) along lagonoy-presentacion road (panagan-omalo section) k0505+847-k0508+000 with exceptions lagonoy
Roads and bridges · 2016 · BICOL GOLDROCK CONSTRUCTION CORPORATION
₱6.8MCompleted · 100%
Upgrading (unpaved to paved) based on gravel road strategies, Traffic benchmark for upgrading to paved road standards (hdm-4 project analysis) jct. balaynan-tabgon-lamon-pinamihagan road
Roads and bridges · 2016 · PARTIDO CONSTRUCTION & SUPPLY
₱89.2MCompleted · 100%
Construction of missing links/new roads, Lalud - garchitorena road (sipaco bridge) sta.34+340 - sta.34+420
Roads and bridges · 2026 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱135.0MNot Yet Started · 0%
Construction of missing links/new roads, Lalud - garchitorena road (bocogan section) sta.17+086 - sta.18+445 barangay bocogan
Roads and bridges · 2026 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱60.6MNot Yet Started · 0%
Construction of multi-purpose building
Buildings · 2025 · S & RV CONSTRUCTION & SUPPLY
₱10.4MNot Yet Started · 0%
Construction of reinforced concrete box culvert (rcbc) along barangay genorangan - barangay agosais road, Camarines sur sta. 1+032.5 - sta. 1+065.8
Roads and bridges · 2026
₱0For Procurement · 0%
Construction of multi-purpose building (covered court), Barangay olas, Lot no. 9877
Buildings · 2026
₱0For Procurement · 0%
₱0For Procurement · 0%
Repair/rehabilitation of classrooms, San rafael-agpo es
Schools · 2025 · J.C NIETO CONSTRUCTION
₱7.9MNot Yet Started · 0%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
HRB CONSTRUCTION24 projects · ₱74.7M
2
E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)21 projects · ₱1.05B
3
PARTIDO CONSTRUCTION & SUPPLY13 projects · ₱692.6M
4
S & RV CONSTRUCTION & SUPPLY11 projects · ₱71.3M
5
G.C.I. CONSTRUCTION AND DEV'T. CORP.8 projects · ₱581.8M