CA
Casiguran: Government
Municipality in Sorsogon, Bicol, Luzon · 25 barangays
National projects
76projects
₱3.87Bin all
12ongoing
1slow
- Roads and bridges ₱1.66B
- Flood control ₱1.17B
- Buildings ₱789.2M
- Schools ₱204.3M
- Water ₱38.0M
Showing 31 to 57 of 57
Construction/maintenance of flood mitigation structures and drainage systems, Const./rehab. of himaoyon flood control upstream & downstream
Flood control · 2019 · RODA CONSTRUCTION & GENERAL SUPPLY
₱68.9MCompleted · 100%
Construction/repair rehabilitation improvement of various infrastructure including local projects
Buildings · 2019 · STEVEN CONSTRUCTION & SUPPLY
₱40.5MCompleted · 100%
Construction of casiguran community hospital building (phase iii)
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱16.9MCompleted · 100%
Construction of cy-2018 basic educational facilities fund (beff) batch i
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱91.5MCompleted · 100%
Construction of cy-2018 basic educational facilities fund (beff) batch i, Casiguran & castilla
Buildings · 2018 · TR CONSTRUCTION CORPORATION
₱95.5MCompleted · 100%
Preventive maintenance-primary roads-daang maharlika(lz), Section c:k0585+431-k0588+170.00 (w/ equations);section d: section d:k0588+370.00-k0590+181.00(w/ equations); section e
Roads and bridges · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱289.5MCompleted · 100%
Construction of core shelter
Buildings · 2018 · PRECIOUS CONSTRUCTION
₱85.5MCompleted · 100%
Construction of casiguran hospital phase ii
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱5.8MCompleted · 100%
Concreting of rizal-burgos road (phase 3) completion
Roads and bridges · 2017 · C.T. LEONCIO CONSTRUCTION & TRADING
₱15.1MCompleted · 100%
Construction of multi purpose building/convered court in brgy. boton, Trece martirez, San juan, San antonio
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱23.1MCompleted · 100%
Repair/rehab./impv't. of various infrastructure including local projects-local roads and bridges-lcoal roads-conc./impv't. of rizal-burgos road, Casiguran sorsogon and conc./impvt'. of escuala-inlagadian road
Roads and bridges · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱51.7MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage system-const. of flood control/drainage system along main roads of the poblacion area
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱58.3MCompleted · 100%
Construction of by-pass and diversion roads, Barcelona-casiguran diversion road (casiguran section)
Roads and bridges · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱93.0MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-construction/rehab. of tulay cawit seawall and embankment
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱37.8MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-construction/rehab. of somal-ot seawall and embankment
Flood control · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱72.5MCompleted · 100%
Retrofitting/strengthening of permanent bridges, First district of sorsogon
Roads and bridges · 2018 · CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU
₱20.9MCompleted · 100%
Preventive maintenance-tertiary roads-ariman-casiguran road-ko612+(-328)-ko613+326
Roads and bridges · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱30.8MCompleted · 100%
Const./maintenance of flood mitigation structures and drainage systems-const/rehab. of lungib seawall
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱65.1MCompleted · 100%
Const./maintenance of flood mitigation structures and dranage systems-construction of river control and embankment at brgy. central
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱62.3MCompleted · 100%
Construction/repair/rehabilitation/improvement of various infrastructure including local projects const./imprv't. of reompeolas road
Flood control · 2017 · LIENEL BUILDERS AND SUPPLY
₱6.6MCompleted · 100%
Construction of multi-purpose bldg. evacuation center, Escuala, Casiguran and construction of multi-purpose bldg. (educational and livelihood center), Inlagadian
Buildings · 2017 · B. VICENCIO BUILDERS (BVB), INC.
₱19.2MCompleted · 100%
Const./maintenance of flood mitigation structures and drainage systems-const./rehab. of central river control and const. of cawit river control
Flood control · 2017 · B. VICENCIO BUILDERS (BVB), INC.
₱47.1MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-const. f san pascual river control, Casiguran; const. of somal-ot protection wall and const. of central protection wall
Flood control · 2017 · C.T. LEONCIO CONSTRUCTION & TRADING
₱38.7MCompleted · 100%
Const. of various school bldg., Projects under fy-2016 basic educational facilities fund (beff) batch 13
Schools · 2016 · B. VICENCIO BUILDERS (BVB), INC.
₱56.0MCompleted · 100%
Const../maint. of flood mitigation structures and drainage systems-const./rehab. of tulay protection wall
Flood control · 2017 · B. VICENCIO BUILDERS (BVB), INC.
₱28.3MCompleted · 100%
Improvement/widening of national roads along n1/daang maharlika(lz)/asian highway 26, K0593+922 to k0598+748 with exceptions, Sorsogon 1st ld
Flood control · 2016 · B. VICENCIO BUILDERS (BVB), INC.
₱104.7MCompleted · 100%
Preventive maintenance based on pavement management system/highway dev't. and management (gdm-4) for intermittent sections, First district of sorsogon
Roads and bridges · 2016 · B. VICENCIO BUILDERS (BVB), INC.
₱31.6MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
C.T. LEONCIO CONSTRUCTION & TRADING14 projects · ₱583.1M
2
AREMAR CONSTRUCTION CORPORATION13 projects · ₱900.3M
3
B. VICENCIO BUILDERS (BVB), INC.6 projects · ₱286.8M
4
MUNTOPAR BUILDERS CORP.5 projects · ₱151.5M
5
M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR4 projects · ₱278.0M