CA
Casiguran: Government
Municipality in Sorsogon, Bicol, Luzon · 25 barangays
National projects
76projects
₱3.87Bin all
12ongoing
1slow
- Roads and bridges ₱1.66B
- Flood control ₱1.17B
- Buildings ₱789.2M
- Schools ₱204.3M
- Water ₱38.0M
Showing 31 to 60 of 76
Improvement of public buildings and construction of evacuation centers/quarantine facilities-region v, Barangay rizal
Buildings · 2021 · NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION
₱33.0MOn-Going · 0%Slow
Bridge-refrofitting/strenthening of permanent bridges-mauhang bridge (b04697lz) along daan maharlika (lz) casiguran sorsogon
Roads and bridges · 2020 · EC STRUCTURAL COMPOSITES, INC.
₱8.9MCompleted · 100%
Construction of sport facilities at casiguran central school and const. of sports facilities at casiguran technical vocational school casiguran sorsogon
Schools · 2020 · MUNTOPAR BUILDERS CORP.
₱48.5MCompleted · 100%
Construction/repair/rehabilitation/improvement of various infrastructure including local projects-construction of ariman-sitio namuat, Brgy. gogon
Roads and bridges · 2020 · AREMAR CONSTRUCTION CORPORATION
₱46.7MCompleted · 100%
Construction/maintenance of flood mitigation structures drainage systems-construction of flood mitigation structures along mauhang river sta. cruz
Flood control · 2020 · STEVEN CONSTRUCTION & SUPPLY
₱37.4MCompleted · 100%
Asphalting at poblacion casiguran
Roads and bridges · 2019 · C.T. LEONCIO CONSTRUCTION & TRADING / RMH CONSTRUCTION & SUPPLY
₱85.9MCompleted · 100%
Construction/rehabilitation of somal-ot seawall and embankment phase iii, Sorsogon 1st legislative district
Flood control · 2019 · TR CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Preventive maintenance-tertiary roads ariman-casiguran road, Ko613+326-ko615+000, Ko617+000-ko619+000 ariman
Roads and bridges · 2019 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱75.3MCompleted · 100%
Construction/maintenance of flood mitigation structure and drainage systems/construction/rehabilitatoin of cagpagol river control
Flood control · 2019 · NFH CONSTRUCTION & SUPPLY
₱42.8MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of poblacion drainage system
Flood control · 2019 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.
₱56.0MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage system/construction/rehabilitation of suji river control casiguran, Sorogon
Flood control · 2019 · RMH CONSTRUCTION & SUPPLY
₱23.3MCompleted · 100%
Construction of by-pass and diversion roads, Barcelona-casiguran diversion road
Roads and bridges · 2019 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱56.3MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Const./rehab. of himaoyon flood control upstream & downstream
Flood control · 2019 · RODA CONSTRUCTION & GENERAL SUPPLY
₱68.9MCompleted · 100%
Construction/repair rehabilitation improvement of various infrastructure including local projects
Buildings · 2019 · STEVEN CONSTRUCTION & SUPPLY
₱40.5MCompleted · 100%
Construction of casiguran community hospital building (phase iii)
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱16.9MCompleted · 100%
Construction of cy-2018 basic educational facilities fund (beff) batch i
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱91.5MCompleted · 100%
Construction of cy-2018 basic educational facilities fund (beff) batch i, Casiguran & castilla
Buildings · 2018 · TR CONSTRUCTION CORPORATION
₱95.5MCompleted · 100%
Preventive maintenance-primary roads-daang maharlika(lz), Section c:k0585+431-k0588+170.00 (w/ equations);section d: section d:k0588+370.00-k0590+181.00(w/ equations); section e
Roads and bridges · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱289.5MCompleted · 100%
Construction of core shelter
Buildings · 2018 · PRECIOUS CONSTRUCTION
₱85.5MCompleted · 100%
Construction of casiguran hospital phase ii
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱5.8MCompleted · 100%
Concreting of rizal-burgos road (phase 3) completion
Roads and bridges · 2017 · C.T. LEONCIO CONSTRUCTION & TRADING
₱15.1MCompleted · 100%
Construction of multi purpose building/convered court in brgy. boton, Trece martirez, San juan, San antonio
Buildings · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱23.1MCompleted · 100%
Repair/rehab./impv't. of various infrastructure including local projects-local roads and bridges-lcoal roads-conc./impv't. of rizal-burgos road, Casiguran sorsogon and conc./impvt'. of escuala-inlagadian road
Roads and bridges · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱51.7MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage system-const. of flood control/drainage system along main roads of the poblacion area
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱58.3MCompleted · 100%
Construction of by-pass and diversion roads, Barcelona-casiguran diversion road (casiguran section)
Roads and bridges · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱93.0MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-construction/rehab. of tulay cawit seawall and embankment
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱37.8MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-construction/rehab. of somal-ot seawall and embankment
Flood control · 2018 · AREMAR CONSTRUCTION CORPORATION / C.T. LEONCIO CONSTRUCTION & TRADING
₱72.5MCompleted · 100%
Retrofitting/strengthening of permanent bridges, First district of sorsogon
Roads and bridges · 2018 · CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU
₱20.9MCompleted · 100%
Preventive maintenance-tertiary roads-ariman-casiguran road-ko612+(-328)-ko613+326
Roads and bridges · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱30.8MCompleted · 100%
Const./maintenance of flood mitigation structures and drainage systems-const/rehab. of lungib seawall
Flood control · 2018 · C.T. LEONCIO CONSTRUCTION & TRADING
₱65.1MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
C.T. LEONCIO CONSTRUCTION & TRADING14 projects · ₱583.1M
2
AREMAR CONSTRUCTION CORPORATION13 projects · ₱900.3M
3
B. VICENCIO BUILDERS (BVB), INC.6 projects · ₱286.8M
4
MUNTOPAR BUILDERS CORP.5 projects · ₱151.5M
5
M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR4 projects · ₱278.0M