CA
Casiguran: Government
Municipality in Sorsogon, Bicol, Luzon · 25 barangays
National projects
76projects
₱3.87Bin all
12ongoing
1slow
- Roads and bridges ₱1.66B
- Flood control ₱1.17B
- Buildings ₱789.2M
- Schools ₱204.3M
- Water ₱38.0M
Showing 1 to 30 of 57
Construction/ maintenance of flood mitigation structures and drainage systems 1.) construction of flood protection/control structure at burgos cis
Flood control · 2025 · KYLA CONSTRUCTION SUPPLY
₱21.9MCompleted · 100%
Const. of 2-storey school building, 12-classroom (casiguran central school)
Schools · 2024 · FULLEROS BOTOX BUILDERS AND DESIGN / MUNTOPAR BUILDERS CORP.
₱63.3MCompleted · 100%
Construction/improvement of access roads leading to declared tourism destinations-(tourism road infrastructure program-trip) - inlagadian road leading to nagsipit falls and cross of worship
Roads and bridges · 2024 · AREMAR CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of multi-purpose building (core shelter), Barangay tulay
Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
Construction of multi-purpose building(balay na dako), Sorsogon (phase ii)
Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
Construction of multi-purpose building, Barangay tulay
Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
Construction (completion) of multi-purpose facilities (sports facilities), Brgy. inlagadian
Buildings · 2023 · AREMAR CONSTRUCTION CORPORATION
₱77.6MCompleted · 100%
Const./rehab. of water supply/septage and sewerage/rain water collectors-water supply system- 1.) const. of rainwater collector system, Sorsogon 2.) const. of water supply system
Water · 2023 · C.T. LEONCIO CONSTRUCTION & TRADING
₱38.0MCompleted · 100%
Const. of poblacion road network, Magallane
Roads and bridges · 2023 · ALNINO CONSTRUCTION & SUPPLY CORPORATION
₱77.0MCompleted · 100%
Network devt. prog. - off-carriageway imprvt. - primary roads - daang maharlika (lz)-ko638+784-ko640
Roads and bridges · 2023 · KM88 CONSTRUCTION INC
₱9.8MCompleted · 100%
Convergence and special support program (cssp)-construction_improvement of access roads leading to declared tourism destinations (tourism road infrastructure program-trip) inlagadian road leading to nagsipit falls and cross of worship
Roads and bridges · 2023 · AREMAR CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Preventive maintenace-primary roads-daang maharlika (lz) 1.) ko549+000-ko549+275 2.) ko559+200-ko559+480 3.) ko598+597-ko598+874
Roads and bridges · 2023 · RMH CONSTRUCTION & SUPPLY
₱58.8MCompleted · 100%
Construction of casiguran coastal road
Flood control · 2022 · C.T. LEONCIO CONSTRUCTION & TRADING
₱48.0MCompleted · 100%
Const. of multi-purpose building (balay na daku), Brgy. somalot, Casiguran 2.) const. of mu
Buildings · 2022 · R.K.X. ODIAMAR CONSTRUCTION
₱99.0MCompleted · 100%
Construction of rizal-tiris-gogon-escuala road
Roads and bridges · 2022 · KM88 CONSTRUCTION INC
₱74.2MCompleted · 100%
Improvement of timbayog-san isidro road leadin
Roads and bridges · 2022 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱69.3MCompleted · 100%
Construction of multi-purpose bldg., Brgy. casay, 2.) construction of multi-purpose
Buildings · 2022 · RMH CONSTRUCTION & SUPPLY
₱36.7MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of suji river control phase ii
Flood control · 2022 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱77.2MCompleted · 100%
Construction of flood mitigation structure and embankment of lungib seawall
Flood control · 2022 · AREMAR CONSTRUCTION CORPORATION
₱38.0MCompleted · 100%
Bridge-refrofitting/strenthening of permanent bridges-mauhang bridge (b04697lz) along daan maharlika (lz) casiguran sorsogon
Roads and bridges · 2020 · EC STRUCTURAL COMPOSITES, INC.
₱8.9MCompleted · 100%
Construction of sport facilities at casiguran central school and const. of sports facilities at casiguran technical vocational school casiguran sorsogon
Schools · 2020 · MUNTOPAR BUILDERS CORP.
₱48.5MCompleted · 100%
Construction/repair/rehabilitation/improvement of various infrastructure including local projects-construction of ariman-sitio namuat, Brgy. gogon
Roads and bridges · 2020 · AREMAR CONSTRUCTION CORPORATION
₱46.7MCompleted · 100%
Construction/maintenance of flood mitigation structures drainage systems-construction of flood mitigation structures along mauhang river sta. cruz
Flood control · 2020 · STEVEN CONSTRUCTION & SUPPLY
₱37.4MCompleted · 100%
Asphalting at poblacion casiguran
Roads and bridges · 2019 · C.T. LEONCIO CONSTRUCTION & TRADING / RMH CONSTRUCTION & SUPPLY
₱85.9MCompleted · 100%
Construction/rehabilitation of somal-ot seawall and embankment phase iii, Sorsogon 1st legislative district
Flood control · 2019 · TR CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Preventive maintenance-tertiary roads ariman-casiguran road, Ko613+326-ko615+000, Ko617+000-ko619+000 ariman
Roads and bridges · 2019 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱75.3MCompleted · 100%
Construction/maintenance of flood mitigation structure and drainage systems/construction/rehabilitatoin of cagpagol river control
Flood control · 2019 · NFH CONSTRUCTION & SUPPLY
₱42.8MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of poblacion drainage system
Flood control · 2019 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.
₱56.0MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage system/construction/rehabilitation of suji river control casiguran, Sorogon
Flood control · 2019 · RMH CONSTRUCTION & SUPPLY
₱23.3MCompleted · 100%
Construction of by-pass and diversion roads, Barcelona-casiguran diversion road
Roads and bridges · 2019 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱56.3MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
C.T. LEONCIO CONSTRUCTION & TRADING14 projects · ₱583.1M
2
AREMAR CONSTRUCTION CORPORATION13 projects · ₱900.3M
3
B. VICENCIO BUILDERS (BVB), INC.6 projects · ₱286.8M
4
MUNTOPAR BUILDERS CORP.5 projects · ₱151.5M
5
M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR4 projects · ₱278.0M