Tuguegarao City: Government

City in Cagayan, Cagayan Valley, Luzon · 49 barangays

National projects

Built by DPWH in Tuguegarao City since 2016.

309projects
₱9.12Bin all
68ongoing
3slow
  • Roads and bridges ₱3.94B
  • Flood control ₱3.61B
  • Buildings ₱1.09B
  • Schools ₱475.3M
  • Water ₱3.2M

Showing 181 to 210 of 309

Concreting at barangay gosi norte Roads and bridges · 2019 · PACIFIC STAR ERECTORS
₱1.6MCompleted · 100%
Concreting of road atsan gabriel Roads and bridges · 2019 · PRIME MASTER CONST. AND DEV'T. CORP.
₱1.0MCompleted · 100%
Concreting of local at brgy. annafunan east Roads and bridges · 2019 · MIG AGGREGATES AND CONCRETE PRODUCTS
₱1.6MCompleted · 100%
Concreting of local roads, Cauilan st., Brgy. caggay Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱790KCompleted · 100%
Concreting at barangay gosi sur Roads and bridges · 2019 · PACIFIC STAR ERECTORS
₱1.6MCompleted · 100%
Concreting of local roads brgy. atulayan norte Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱1.6MCompleted · 100%
Improvement of multi--purpose building (gymnasium), Barangay cataggaman nuevo, Cag. Buildings · 2019 · MIG AGGREGATES AND CONCRETE PRODUCTS
₱797KCompleted · 100%
₱23.8MCompleted · 100%
₱2.0MCompleted · 100%
Concreting of road, Cuntapay street, Arellano extension, Ugac sur Roads and bridges · 2019 · E. GUADIZ CONSTRUCTION
₱1.7MCompleted · 100%
₱1.8MCompleted · 100%
Concreting of local roads, Brgy. carig norte Roads and bridges · 2019 · E. GUADIZ CONSTRUCTION
₱875KCompleted · 100%
Concreting of local road, Tindal st. brgy. san gabriel Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱1.6MCompleted · 100%
Concreting of local roads, Cruz village, Brgy. caggay Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱792KCompleted · 100%
₱1.3MCompleted · 100%
₱2.6MCompleted · 100%
Construction of drainage system at barangay dadda Flood control · 2019 · TS CONSTRUCTION
₱1.4MCompleted · 100%
Concreting at barangay alibago-magalalag, Enr Roads and bridges · 2019 · MIG AGGREGATES AND CONCRETE PRODUCTS
₱1.6MCompleted · 100%
₱873KCompleted · 100%
₱884KCompleted · 100%
₱48.2MCompleted · 100%
Concreting of local roads, Brgy. leonarda Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱1.6MCompleted · 100%
Construction of drainage system along brgy. larion bajo Roads and bridges · 2019 · JDL5 CONSTRUCTION CORPORATION
₱1.7MCompleted · 100%
Concreting oflocal roads, Brgy.ugac sur Roads and bridges · 2019 · JOHN 6:51 BUILDERS
₱1.6MCompleted · 100%
Construction of drainage system along along brgy. caritan centro Roads and bridges · 2019 · JDL5 CONSTRUCTION CORPORATION
₱1.7MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Tuguegarao City since 2016.

1
DOUBLE J1908 CONSTRUCTION25 projects · ₱1.07B
2
MEGAY CONSTRUCTION INC.16 projects · ₱571.1M
3
OML CONSTRUCTION16 projects · ₱53.9M
4
EGB CONSTRUCTION CORPORATION15 projects · ₱926.8M
5
4MD JSL CONSTRUCTION INC. INNOVATIVE CREATION CORPORATION)15 projects · ₱117.4M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →