National projects
322projects
₱8.04Bin all
48ongoing
6slow
- Flood control ₱4.42B
- Buildings ₱1.53B
- Roads and bridges ₱1.30B
- Schools ₱650.9M
- Other ₱141.1M
- Water ₱8.7M
Showing 31 to 60 of 322
Construction of river protection structure near ibaba
Flood control · 2025 · LQG TRADING AND CONSTRUCTION
₱28.6MOn-Going · 54%
Construction of flood control structure along sta. rosa river (near calax bridge), Sto. domingo side
Flood control · 2024 · MAR-VEL CONSTRUCTION & SUPPLY
₱96.5MCompleted · 100%
Construction of containment area at cabuyao river
Flood control · 2024 · SUNWEST, INC.
₱141.1MOn-Going · 0%
Construction of containment area at sinalhan waterways
Other · 2024 · SUNWEST, INC.
₱141.1MOn-Going · 0%
Construction of containment area at sta. rosa river
Flood control · 2024 · SUNWEST, INC.
₱94.1MOn-Going · 0%
Construction of flood control structure along sta. rosa river (near truss bridge), Sto. domingo side
Flood control · 2024 · MEGA M BUILDERS CORPORATION
₱93.9MOn-Going · 91%
Construction of multi-purpose building (research laboratory building), City colleges, Barangay tagapo
Buildings · 2024 · HARVEE ENTERPRISES / NARVAJA CONSTRUCTION
₱67.6MOn-Going · 28%Slow
Construction of river protection structure along malitlit waterways (near riverbend homes), Laguna (phase 1)
Flood control · 2024 · J. SIMEON CONSTRUCTION / NOVA VENTUS CONSTRUCTION INC.
₱99.0MCompleted · 100%
Construction of river protection structure near south luzon expressway (slex) malitlit bridge, Laguna (phase 1)
Flood control · 2024 · J. SIMEON CONSTRUCTION / NOVA VENTUS CONSTRUCTION INC.
₱99.0MOn-Going · 52%Slow
Construction of river protection structure near south luzon expressway (slex) malitlit bridge, Laguna (phase ii)
Flood control · 2024 · J. SIMEON CONSTRUCTION / MIGHTY CONSTRUCTION & DEVELOPMENT INC.
₱96.3MOn-Going · 66%
Construction of multi-purpose facility, Terry town subdivision, Barangay market area
Buildings · 2024 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱19.3MCompleted · 100%
Construction of multi-purpose facility, Celina homes 3, Barangay pooc/labas santa rosa city
Buildings · 2024 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱29.0MCompleted · 100%
Construction of multi-purpose building, Barangay dita
Buildings · 2023 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱6.8MCompleted · 100%
Rehabilitation of multi-purpose building, Ambrosia subd., Brgy. ibaba
Buildings · 2024 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MCompleted · 100%
Construction of multi-purpose building, Lakeville 2 subdivision, Barangay sinalhan
Buildings · 2024 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱19.3MOn-Going · 90%
Construction of multi-purpose building, Brgy. malusak
Buildings · 2023 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱29.3MCompleted · 100%
Construction of multi-purpose building of barangay dita
Buildings · 2023 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱19.4MCompleted · 100%
Construction of multi-purpose building, Marco polo subd., Brgy. tagapo
Buildings · 2024 · LE BRON CONSTRUCTION
₱9.7MCompleted · 100%
Construction of multi-purpose building, Fort sto. domingo
Buildings · 2023 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱33.8MOn-Going · 2%Slow
Rehabilitation of multi-purpose facility, Barangay pooc
Buildings · 2024 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱9.7MCompleted · 100%
Construction of multi-purpose building, Barangay ibaba
Buildings · 2023 · 11 DIAMOND EAGLE CONSTRUCTION CORPORATION
₱6.9MCompleted · 100%
Preventive maintenance - primary roads manila south rd - k0036 + 150 - k0036 + 789, K0036 + 845 - k0037 + 623, K0037 + 634 - k0037 + 739, K0038 + 000 - k0038 + 437, K0038 + 735 - k0040 + 962, K0040 + 968 - k0041 + 516
Roads and bridges · 2024 · R.R. ENCABO CONSTRUCTORS INCORPORATED
₱148.3MOn-Going · 99%
Construction of barangay sapang - barangay malakaban interconnecting road binangonan, Rizal (first district)
Roads and bridges · 2024 · PERSAN CONSTRUCTION, INC.
₱38.4MOn-Going · 78%
Improvement of road, Purok 1-6, Brgy. sinaihan
Roads and bridges · 2024 · ROBIG BUILDERS AND DEVELOPMENT CORP.
₱14.4MOn-Going · 0%Slow
Asphalt overlay at olympia subd (from puremart to bridge going to garden villas) barangay labas, Brgy. labas
Roads and bridges · 2024 · EURO CONSTRUCTION AND SUPPLY ( FORMERLY: EURO CONSTRUCTION AND TRADING)
₱11.5MOn-Going · 98%
Construction of riverwall, Purok 4, Barangay sinalhan
Flood control · 2024 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱19.3MOn-Going · 81%
Rehabilitation of multi-purpose facility, Tiongco subd., Brgy. tagapo
Buildings · 2024 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱4.8MCompleted · 100%
Rehabilitation of jp rizal road along brgy. dita
Roads and bridges · 2024 · ROBIG BUILDERS AND DEVELOPMENT CORP.
₱34.6MCompleted · 100%
Rehabilitation of river protection structure along sitio iraq, Purok 5, Macabling
Flood control · 2024 · M.T. MALIUANAG CONSTRUCTION SERVICES
₱75.2MOn-Going · 100%
Rehabilitation of multi-purpose building (covered court), Barangay balibago
Buildings · 2023 · K CONSTRUCTION & DEVELOPERS CORPORATION
₱4.8MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
DATZLAV CONSTRUCTION25 projects · ₱185.5M
2
ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)23 projects · ₱291.9M
3
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)22 projects · ₱611.4M
4
HARVEE ENTERPRISES19 projects · ₱183.5M
5
11 DIAMOND EAGLE CONSTRUCTION CORPORATION17 projects · ₱224.3M