National projects
374projects
₱13.40Bin all
43ongoing
7slow
- Roads and bridges ₱6.19B
- Flood control ₱4.66B
- Buildings ₱1.50B
- Schools ₱976.1M
- Water ₱80.7M
Showing 91 to 120 of 374
Construction/maintenance of flood mitigation structures and drainage systems, Construction of dumacaa river flood control (package 1), Quezon
Flood control · 2024 · I.A . BOSQUE CONSTRUCTION CORPORATION
₱79.1MCompleted · 100%
Construction of new bridgeslopez viaduct along daang maharlika (lz), Package a
Roads and bridges · 2024 · M.G. LUALHATI CONSTRUCTION CORP.
₱66.7MOn-Going · 82%
Installation of road roller barriers- quezon eco-tourism rd- k0163+528-k0163+805, K0165+380-k0165+488, Brgy salinas to ibabang talim, Lucena ci
Roads and bridges · 2023 · MG SAMIDAN CONSTRUCTION
₱96.5MCompleted · 100%
Installation of road roller barriers- quezon eco-tourism rd- k0163+143-k0163+528, Brgy salinas, Quezon
Roads and bridges · 2023 · MG SAMIDAN CONSTRUCTION
₱96.5MCompleted · 100%
Installation of road roller barriers- quezon eco-tourism rd-k0160+667-k0160+704, K0160+770-k0160+973, K0162+150-k0162+295, Brgy castañas to tal
Roads and bridges · 2023 · MG SAMIDAN CONSTRUCTION
₱96.5MCompleted · 100%
Construction/improvement of access roads leading to seaports (kalsada tungo sa paliparan, Riles at daungan program-katuparan), Quezon-eco-tourism-cotta-dalahican-talao-talao-mayao road, Quezon
Roads and bridges · 2024 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱19.6MCompleted · 100%
Preventive maintenance- secondary roads, Msr old route-k0129+062-k0129+363
Roads and bridges · 2024 · GROUNDED ERL BUILDERS INCORPORATED
₱25.0MCompleted · 100%
Construction of flood control (riprap), Kmnai, Barangay kanlurang mayao, Quezon
Flood control · 2024 · JAICA CONST. CORP
₱5.0MCompleted · 100%
Construction of multi-purpose building (covered court), Lucena west i elementary school, Barangay ilayang iyam, Luce
Schools · 2024 · I.A . BOSQUE CONSTRUCTION CORPORATION
₱9.9MCompleted · 100%
Construction of road, Immaculada concepcion, Barangay isabang
Roads and bridges · 2024 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱5.0MCompleted · 100%
Construction of road, Brgy. bocohan
Roads and bridges · 2023 · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱9.7MCompleted · 100%
Construction of multi-purpose building (covered court) at lucena east vii elementary school
Schools · 2023 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱4.8MCompleted · 100%
Construction of two (2) storey four (4) classroom school building at hermana fausta elementary school, Quezon
Schools · 2023 · JAICA CONST. CORP
₱11.4MCompleted · 100%
Construction of three (3) storey six (6) classroom school building at lucena city national high school-mayao crossing extension, Quezon
Schools · 2023 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱18.3MOn-Going · 98%
Construction of four (4) storey twelve (12) classroom school building at lucena south ii elementary school, Quezon
Schools · 2023 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱33.4MCompleted · 100%
Rehabilitation of multi-purpose building (regional trial court building), Barangay 10, Quezon
Buildings · 2023 · JAICA CONST. CORP
₱5.0MCompleted · 100%
Concreting of brgy. ilayang dupay fmr, Brgy. ilayang dupay
Roads and bridges · 2023 · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱9.9MCompleted · 100%
Construction/rehabilitation of water supply/septage and sewerage/rainwater collector system-rainwater collector system
Water · 2023 · M.G. VILLAMIN CONSTRUCTION
₱2.3MCompleted · 100%
Construction of public water supply system (level ii), Sitio kurba, Barangay ibabang iyam, Quezon
Water · 2023 · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱5.0MCompleted · 100%
Construction of dumacaa river flood control (package 10), Quezon
Flood control · 2023 · GROUNDED ERL BUILDERS INCORPORATED / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱96.5MCompleted · 100%
Construction of dumacaa river flood control (package 9), Quezon
Flood control · 2023 · RAPID FOREMOST CONST. CO.
₱96.5MCompleted · 100%
Construction of dumacaa river flood control (package 8), Quezon
Flood control · 2023 · JELCON-CONSTRUCTION AND TRADING CORPORATION / RAPID FOREMOST CONST. CO.
₱96.5MCompleted · 100%
Construction/ rehabilitation of flood mitigation facilities within major river basins and principal rivers, Construction of iyam river flood control (package 12), Lucena cit
Flood control · 2023 · WYDERWAYS BUILDERS AND SUPPLIES
₱77.2MCompleted · 100%
Construction of dumacaa river flood control (package 11), Quezon
Flood control · 2023 · I.A . BOSQUE CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of quezon industrial highway (
Roads and bridges · 2023 · GROUNDED ERL BUILDERS INCORPORATED / ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.
₱96.5MCompleted · 100%
Construction of quezon industrial highway (
Roads and bridges · 2023 · I.A . BOSQUE CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of quezon industrial highway (package 6)
Roads and bridges · 2023 · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱96.5MCompleted · 100%
Construction of seawall, Barangay barra, Quezon
Flood control · 2023 · ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. / WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱96.5MCompleted · 100%
Construction of multipurpose building, Brgy. mayao castillo
Buildings · 2023 · JAICA CONST. CORP
₱5.0MCompleted · 100%
Construction of public water supply system (level ii), Barangay cotta, Quezon
Water · 2023 · WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.
₱5.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP.61 projects · ₱2.44B
2
ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED.35 projects · ₱654.6M
3
I.A . BOSQUE CONSTRUCTION CORPORATION33 projects · ₱1.08B
4
JAICA CONST. CORP30 projects · ₱430.5M
5
RAPID FOREMOST CONST. CO.26 projects · ₱1.39B