Malibcong: Government
Municipality in Abra, Cordillera, Luzon · 12 barangays
National projects
82projects
₱4.27Bin all
14ongoing
2slow
- Roads and bridges ₱3.63B
- Flood control ₱541.9M
- Water ₱56.7M
- Buildings ₱24.7M
- Schools ₱19.6M
Showing 1 to 30 of 82
Construction/upgrading/rehabilitation of drainage along national roads - secondary roads kalinga-abra rd - k0516+690-k0516+693
Flood control · 2026 · BHM CONSTRUCTION
₱5.0MOn-Going · 32%
Rehabilitation / reconstruction of roads with slips, Slope collapse and landslide: secondary roads - kalinga-abra road - k0515+488-k0515-508, K0515+869-k
Roads and bridges · 2026 · BHM CONSTRUCTION
₱42.4MOn-Going · 31%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga rd-k0480+214-k0480+232, K0480+354-k0480+399, K0481+892-k0481+920, K0483+010-k0483+050, K0487+285-k0487+345, K0488+084-k0488+099
Roads and bridges · 2025 · MG SAMIDAN CONSTRUCTION
₱6.1MOn-Going · 85%
Construction of missing links / new roads: abra-kalinga-apayao road along aciga (pinukpuk)-tawang-buaya-mabaca (balbalan section, Kalinga) kalinga.
Roads and bridges · 2025 · BHM CONSTRUCTION
₱120.5MOn-Going · 99%
Construction of malibcong flood control structure along abra river basin
Flood control · 2024 · MG SAMIDAN CONSTRUCTION
₱138.8MOn-Going · 90%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide - secondary roads, Kalinga - abra road, K0526+000 to k0526+085
Roads and bridges · 2024 · ROAD EDGE TRADING & DEVELOPMENT SERVICES
₱96.5MOn-Going · 98%
Construction / rehabilitation of water suppy / septage and sewerage / rain water collectors - water supply system construction of water supply systems - construction of water supply system (level iii), Balbal
Water · 2024 · AQUATERRA KONSTRUKT INC.
₱34.3MCompleted · 100%
Construction/ maintenance of flood mitigation structures and drainage systems - construction (completion) of tapao flood control (callangan -ducligan), Sta.166+200 - sta. 166+641 (r/s), Sta. 166+694 - sta. 166+878 (r/s), Sta. 166+374 - sta. 166+926(l/s)
Flood control · 2024 · BHM CONSTRUCTION
₱96.5MOn-Going · 39%Slow
Rehabilitation of water supply / septage and sewerage / rain water collector systems - construction / rehabilitation of water supply / septage and sewerage / rainwater collector system
Water · 2024 · MPD3 CONSTRUCTION
₱2.9MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0480+459-k0480+574
Roads and bridges · 2024 · 739 BUILDERS
₱8.2MOn-Going · 94%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0462+500-k0462+508, K0464+238-k0464+2
Roads and bridges · 2024 · 739 BUILDERS
₱9.3MOn-Going · 100%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers: construction of oling river flood control str
Flood control · 2024 · BHM CONSTRUCTION
₱29.0MCompleted · 100%
Construction / rehabilitation of water supply / septage and sewerage / rain water collector / water supply system - construction of solar water supply project, Municipality balbalan, Province of kalinga
Water · 2023 · AQUATERRA KONSTRUKT INC.
₱19.6MCompleted · 100%
Rehabilitation of binasaran-manapnap road
Roads and bridges · 2023 · MG SAMIDAN CONSTRUCTION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-tertiary roads, Abra-cervantes road, K0435+250-k0435+280
Roads and bridges · 2023 · 739 BUILDERS
₱2.8MOn-Going · 94%
Construction of road, Abra-kalinga road, K0485+000-k0488+000
Roads and bridges · 2023 · MG SAMIDAN CONSTRUCTION / TWINFORMERS CONSTRUCTION SERVICES
₱144.7MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-tertiary roads, Abra-cervantes road, K0445+650-k0445+665, K0448+300-k0448+
Roads and bridges · 2023 · 739 BUILDERS
₱21.9MOn-Going · 97%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0474+000-k0474+100
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0473+300-k0473+400
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0474+600-k0474+700
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0472+967-k0473+090
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0473+120-k0473+250
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0474+720-k0474+850
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0474+900-k0475+090
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0482+650-k0482+750
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0484+340-k0484+440
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay duldulao
Buildings · 2023 · 739 BUILDERS
₱5.0MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0475+200-k0475+700
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱77.2MCompleted · 100%
Rehabilitation/ reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Abra-kalinga road-k0473+450-k0473+600
Roads and bridges · 2023 · SILVERWOLVES CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay mataragan
Buildings · 2023 · 739 BUILDERS
₱5.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
SILVERWOLVES CONSTRUCTION CORPORATION17 projects · ₱1.60B
2
739 BUILDERS16 projects · ₱490.8M
3
BHM CONSTRUCTION12 projects · ₱531.5M
4
R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC.9 projects · ₱134.5M
5
PHESCO, INCORPORATED5 projects · ₱388.5M