San Jose Del Monte City: Government

City in Bulacan, Central Luzon, Luzon · 62 barangays

Town hall contracts

Construction contracts the town hall of San Jose Del Monte City awarded and posted on PhilGEPS.

58projects
₱94.0Min all
  • Flood control ₱31.8M
  • Buildings ₱21.3M
  • Other ₱19.1M
  • Roads and bridges ₱17.7M
  • Schools ₱4.0M

The last construction award San Jose Del Monte City posted on PhilGEPS is from February 2016. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 31 to 58 of 58

Asphalt patching/overlay, Brgy. poblacion - sapang palay proper Other · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱998K
Construction of covered court, Brgy. gumaoc citrus, Csjdm Buildings · 2012 · JEMN BUILDERS
₱3.0M
Construction of covered court, Brgy. gumaoc central, Csjdm Buildings · 2012 · EM PAULE CONSTRUCTION & TRADING
₱2.0M
Rehablitation of drainage system (pipe culvert) with pavement brgy. sta. cruz iv Flood control · 2012 · JEMN BUILDERS
₱563K
Rehabilitation of footbridge at teacher’s village, Brgy. san rafael i Flood control · 2012 · JEMN BUILDERS
₱1.1M
Construction of billboard (gulod-bulak boundary), Brgy. dulong bayan, City of sjdm Other · 2012 · EM PAULE CONSTRUCTION & TRADING
₱150K
Improvement of drainage system sampol market, Infront of victory mall, Brgy. bagong buhay i Flood control · 2012 · EM PAULE CONSTRUCTION & TRADING
₱998K
Rehablitation of rip-rap at creekbank brgy. san rafael ii Flood control · 2012 · E.S. HERNANDEZ CONSTRUCTION
₱1.0M
Improvement of drainage system sampol market, Infront of jollibee, Brgy. bagong buhay i Flood control · 2012 · EM PAULE CONSTRUCTION & TRADING
₱1.2M
Riprapping of creekbank w/bottom slab lower 8, Brgy. bagong buhay i Flood control · 2012 · JEMN BUILDERS
₱1.2M
Riprapping of creekbank between nayong lourdes i & ii, Brgy. maharlika, Csjdm Flood control · 2012 · JEMN BUILDERS
₱523K
Construction of slope protection at phase ii, Brgy. francisco homes narra, Csjdm Flood control · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱599K
Riprapping of creekbank at brgy. sta. cruz v, Csjdm Flood control · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱599K
Riprapping of slope protection at sitio bakood, Brgy. sto. cristo, City of sjdm Flood control · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱600K
Riprapping of slope protection at sitio bakood, Brgy. sto. cristo, City of sjdm Flood control · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱600K
Riprapping of creekbank at brgy. minuyan ii, Csjdm Flood control · 2012 · JEMN BUILDERS
₱636K
Riprapping of creekbank at brgy. francisco homes yakal Flood control · 2012 · MANUEL A. DELA TORRE JR. BUILDERS
₱690K
Riprapping of creekbank at carissa 4a, Brgy. kaypian, City of sjdm Flood control · 2012 · JEMN BUILDERS
₱740K
Riprapping of riverbank at bgy. dulong bayan, Csjdm Flood control · 2012 · JEMN BUILDERS
₱800K
Riprapping of riverbank at phase 1a, Brgy. san manuel, City of sjdm Flood control · 2012 · JEMN BUILDERS
₱1,000K
Riprapping of riverbank at sulukan, Brgy. sapang palay proper Flood control · 2012 · A.G. HERRERA CONSTRUCTION CORPORATION
₱1.1M
Construction of box culvert (10m) Flood control · 2010 · E.S. HERNANDEZ CONSTRUCTION
₱697K
Rehabilitation of drainage (100lm) Flood control · 2010 · A.G. HERRERA CONSTRUCTION CORPORATION
₱907K
Construction of riprap at creekbank between brgy. san pedro, Citrus and bagong buhay i Flood control · 2010 · A.G. HERRERA CONSTRUCTION CORPORATION
₱920K
Riprapping of creekbank Flood control · 2010 · A.G. HERRERA CONSTRUCTION CORPORATION
₱1.3M
Riprapping of creekbank Flood control · 2010 · A.G. HERRERA CONSTRUCTION CORPORATION
₱1.4M
Construction of drainage with concrete canal with cover Flood control · 2010 · E.S. HERNANDEZ CONSTRUCTION
₱613K
Installation of guardrails and slope protection Flood control · 2010 · E.S. HERNANDEZ CONSTRUCTION
₱2.1M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →