National projects
342projects
₱9.47Bin all
40ongoing
1slow
- Flood control ₱4.39B
- Roads and bridges ₱3.54B
- Buildings ₱821.9M
- Schools ₱706.1M
- Water ₱9.8M
Showing 271 to 300 of 342
Slope protection along sta. maria river, Bagbaguin
Flood control · 2017 · L.R. TIQUI BUILDERS, INC.
₱48.2MCompleted · 100%
Construction of flood control structures along sta. maria river (phase 1)
Flood control · 2017 · PERSAN CONSTRUCTION, INC.
₱46.3MCompleted · 100%
Construction of flood control structures along sta. maria river (phase 2)
Flood control · 2017 · EL-JAKE BUILDERS / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.
₱46.3MCompleted · 100%
Construction of slope protection/drainage, Sitio ibayo, Pulong buhangin
Flood control · 2017 · EARTHWORK BUILDERS, INC.
₱1.9MCompleted · 100%
Improvement/repair/rehabilitation of existing multi-purpose building, Tabing bakod
Buildings · 2017 · M.S. RAMOS CONSTRUCTION INC.
₱2.8MCompleted · 100%
Construction of multi-purpose building
Buildings · 2017 · AZUL BUILDERS
₱1.9MCompleted · 100%
Construction / improvement of barangay road with canal silangan road, Silangan, Bulacan 4th ld
Roads and bridges · 2017 · WBX CONSTRUCTION, INC
₱1.9MCompleted · 100%
Improvement/rehabilitation of cityland, Pulong buhangin
Roads and bridges · 2017 · M.S. RAMOS CONSTRUCTION INC.
₱9.4MCompleted · 100%
Construction / improvement of barangay road pulong buhangin silangan road, Bulacan 4th ld
Roads and bridges · 2017 · WBX CONSTRUCTION, INC
₱1.9MCompleted · 100%
Construction/completion of multi-purpose building barangay bulac
Buildings · 2017 · AZUL BUILDERS
₱1.4MCompleted · 100%
Improvement/rehabilitation of sta. clara - sta. cruz - manggahan road
Roads and bridges · 2017 · 729 CONSTRUCTION, INC.
₱9.4MCompleted · 100%
Improvement/rehabilitation of san jose patag - catmon - bulac road
Roads and bridges · 2017 · C & F CONSTRUCTION & DEVELOPMENT CORPORATION
₱9.4MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along bocaue - san jose road k0035+800 - k0036+324
Roads and bridges · 2017 · TM ABAD CONSTRUCTION CORP.
₱9.3MCompleted · 100%
Construction/improvement of slope protection with drainage canal (marian subdivision)
Flood control · 2017 · S.A. PLEYTO CONSTRUCTION CORPORATION
₱1.9MCompleted · 100%
Improvement/rehabilitation of brgy. caysio road
Roads and bridges · 2017 · S.A. PLEYTO CONSTRUCTION CORPORATION
₱4.7MCompleted · 100%
Construction of multi-purpose building, Brgy. san gabriel
Buildings · 2017 · PJL BUILDERS
₱2.8MCompleted · 100%
Construction of flood control structure along sta. maria river (phase i - right side)
Flood control · 2017 · HEXAMINDZ CORPORATION
₱42.3MCompleted · 100%
Construction of flood control structure along sta. maria river (phase ii - right side)
Flood control · 2017 · HALREY CONSTRUCTION INC.
₱42.3MCompleted · 100%
Construction of flood control structure along sta. maria river (phase ii - left side)
Flood control · 2017 · L.R. TIQUI BUILDERS, INC.
₱48.5MCompleted · 100%
Construction of flood control structure along sta. maria river (phase iii - left side)
Flood control · 2017 · J.D. LEGASPI CONSTRUCTION / S.A. PLEYTO CONSTRUCTION CORPORATION
₱38.0MCompleted · 100%
Repair/rehabilitation along sta. maria river (lalakhan section)
Flood control · 2016 · TRIPLE 8 CONSTRUCTION & SUPPLY, INC.
₱14.3MCompleted · 100%
Construction/repair/rehabilitation/improvement of various infrastructure including local projects, Local bridges, Construction of san gabriel-bypass bridge, Province of bulacan
Roads and bridges · 2016 · WING AN CONSTRUCTION AND DEVELOPMENT CORPORATION
₱122.8MCompleted · 100%
Construction of 3 storey - 9 classroom san vicente (hulo) es
Schools · 2016 · M.S. RAMOS CONSTRUCTION INC.
₱16.1MCompleted · 100%
Construction of 3-storey - 6 classroom guyong es
Schools · 2016 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱10.5MCompleted · 100%
Construction of 3 storey - 15 classroom balasing elementary school
Schools · 2016 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱23.1MCompleted · 100%
Construction of 2 units- 4 storey - 24 classroom parada nhs
Schools · 2016 · EARTHWORK BUILDERS, INC. / PERSAN CONSTRUCTION, INC.
₱73.6MCompleted · 100%
Construction of 4-storey 20 classroom pulong buhangin nhs
Schools · 2016 · PERSAN CONSTRUCTION, INC.
₱30.4MCompleted · 100%
Preventive maintenance based on pavement management system/highway development & management-4 (hdm-4), Tertiary roads, Bocaue-san jose del monte lone district, Prov. of bulacan
Roads and bridges · 2016 · L.R. TIQUI BUILDERS, INC.
₱47.2MCompleted · 100%
Construction of 3-storey - 6-classroom catmon es
Schools · 2016 · B. BERNARDO CONST., INC.
₱10.7MCompleted · 100%
Construction of 4-storey - 24 classroom caypombo es
Schools · 2016 · HEXAMINDZ CORPORATION
₱35.9MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
M.S. RAMOS CONSTRUCTION INC.23 projects · ₱457.1M
2
1199S CONSTRUCTION22 projects · ₱196.9M
3
L.R. TIQUI BUILDERS, INC.19 projects · ₱1.37B
4
FORTUNE RDC ENTERPRISES19 projects · ₱157.9M
5
729 CONSTRUCTION, INC.16 projects · ₱742.2M