Iba: Government

Municipality in Zambales, Central Luzon, Luzon · 14 barangays

National projects

Built by DPWH in Iba since 2016.

177projects
₱5.98Bin all
47ongoing
2slow
  • Flood control ₱3.55B
  • Roads and bridges ₱1.36B
  • Buildings ₱844.0M
  • Schools ₱214.0M
  • Water ₱13.4M

Showing 1 to 30 of 177

Construction of multi-purpose building, President ramon magsaysay state university (prmsu) campus, Zone 6 Buildings · 2025 · DGNRGE CONSTRUCTION CORPORATION / KAEE CONSTRUCTION SERVICES
₱97.6MOn-Going · 61%
Construction of dike (levees) of marangla river Flood control · 2025 · E.R. DELA CRUZ CONSTRUCTION & SUPPLY
₱96.5MOn-Going · 100%
Construction of multi-purpose bldg., Brgy. amungan Buildings · 2025 · THREE KCS BUILDERS AND SUPPLY
₱17.6MOn-Going · 0%
Construction of multi-purpose bldg., Libaba Buildings · 2025 · GASAT BUILDERS AND SUPPLIES INC.
₱15.6MOn-Going · 14%
Completion of multi-purpose buildings Buildings · 2025 · AKPSN BUILDERS AND SUPPLY
₱9.3MOn-Going · 0%
Repair / improvement of bulwagan ng katarungan, Balili, Barangay palanginan Buildings · 2025 · GASAT BUILDERS AND SUPPLIES INC.
₱29.3MOn-Going · 62%
₱95.1MOn-Going · 0%
Construction of multi-purpose building, Zone 5 Buildings · 2025 · GASAT BUILDERS AND SUPPLIES INC.
₱7.8MOn-Going · 0%
Construction of municipal gym, Barangay dirita Buildings · 2025 · E.R. DELA CRUZ CONSTRUCTION & SUPPLY
₱19.6MOn-Going · 0%
Concreting of sitio olpoy fmr, Brgy. amungan Roads and bridges · 2025 · GASAT BUILDERS AND SUPPLIES INC.
₱29.8MOn-Going · 0%
Concreting of sta. rita fmr, Brgy. bangantalinga Roads and bridges · 2025 · RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION
₱19.9MOn-Going · 0%
₱48.9MOn-Going · 97%
Concreting of frenza-gayater fmr, Brgy. sta. barbara Roads and bridges · 2025 · GASAT BUILDERS AND SUPPLIES INC.
₱19.9MOn-Going · 74%
₱9.8MOn-Going · 100%
₱97.5MOn-Going · 100%
Construction of riverbank protection structure along takar river phase 7 Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING
₱99.0MOn-Going · 94%
Construction of riverbank protection structure along takar river phase 4 Flood control · 2025 · NEWINGTON BUILDERS, INC.
₱97.5MOn-Going · 47%
Construction of riverbank protection structure along takar river phase 5 Flood control · 2025 · NEWINGTON BUILDERS, INC.
₱99.0MOn-Going · 35%
Construction of riverbank protection structure along takar river phase 3 Flood control · 2025 · NEWINGTON BUILDERS, INC.
₱98.9MOn-Going · 65%
Construction of riverbank protection structure along takar river phase 6 Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING
₱99.0MOn-Going · 81%
Construction of riverbank protection structure along takar river, Phase 2 Flood control · 2025 · S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱95.1MOn-Going · 61%
Construction of riverbank protection structure along takar river, Phase 1 Flood control · 2025 · S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱95.1MOn-Going · 64%
Construction of riverbank protection structure along takar river phase 10 Flood control · 2025 · S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱98.9MOn-Going · 50%
Construction of riverbank protection structure along takar river phase 9 Flood control · 2025 · S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱98.9MOn-Going · 69%
Construction of riverbank protection structure along takar river phase 8 Flood control · 2025 · S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱97.5MOn-Going · 95%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Iba since 2016.

1
R.A. PAHATI CONST. & SUPPLY, INC.11 projects · ₱802.5M
2
STO. CRISTO CONSTRUCTION & TRADING INC.10 projects · ₱362.6M
3
CDC CONSTRUCTION & SUPPLIES10 projects · ₱280.5M
4
GASAT BUILDERS AND SUPPLIES INC.10 projects · ₱180.0M
5
E.R. DELA CRUZ CONSTRUCTION & SUPPLY9 projects · ₱273.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →