Vintar: Government

Municipality in Ilocos Norte, Ilocos, Luzon · 33 barangays

National projects

Built by DPWH in Vintar since 2016.

504projects
₱10.21Bin all
185ongoing
20slow
  • Flood control ₱6.59B
  • Roads and bridges ₱3.06B
  • Buildings ₱283.7M
  • Schools ₱249.0M
  • Water ₱20.0M

Showing 61 to 90 of 299

Construction of road, Barangay canaam, Ilocos norte (phase ii) Roads and bridges · 2022 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY / JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱49.0MCompleted · 100%
Construction of flood mitigation structure along vintar river (bislak river), Brgy. alsem, Sitio di tulang Flood control · 2022 · EGB CONSTRUCTION CORPORATION / JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱95.0MCompleted · 100%
Construction of road, Barangay alsem Roads and bridges · 2022 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱77.2MCompleted · 100%
₱43.6MCompleted · 100%
₱48.2MCompleted · 100%
₱85.9MCompleted · 100%
₱85.9MCompleted · 100%
Construction (completion) of multi purpose building, Barangay esperanza Buildings · 2022 · DOUBLE M CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Construction of flood mitigation structure along bacarra-vintar river (bislak river), Brgy. dipilat Flood control · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱19.3MCompleted · 100%
Construction (completion) of multi purpose building, Barangay lubnac Buildings · 2022 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱1.9MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay salsalamagui Buildings · 2022 · DOUBLE M CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Construction of flood mitigation structure along vintar-bacarra river (bislak river), Brgy. visaya Flood control · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱9.8MCompleted · 100%
Construction (completion) of multi-purpose builing, Barangay cabangaran Buildings · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱2.0MCompleted · 100%
Construction of road, Barangay canaan Roads and bridges · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱19.4MCompleted · 100%
Construction of flood mitigation structure along vintar river (bislak river), Brgy. canaam Flood control · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱19.6MCompleted · 100%
Construction of water system, Barangay tamdagan Water · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱1.9MCompleted · 100%
Construction of road at brgy. isic-isic Roads and bridges · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱9.8MCompleted · 100%
Construction of road along dagupan - canaam road, Brgy. canaam Roads and bridges · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱19.2MCompleted · 100%
Construction (completion) of multi purpose building, Barangay dipilat Buildings · 2022 · EDU GROUP OF BUILDERS CORPORATION
₱2.0MCompleted · 100%
Construction (completion) of multi purpose building, Barangay san jose/lipay Buildings · 2022 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱2.0MCompleted · 100%
Construction of flood mitigation structure along vintar-bacarra river (bislak river), Barangay bago Flood control · 2022 · JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION
₱19.6MCompleted · 100%
₱24.5MCompleted · 100%
₱14.7MCompleted · 100%
Construction of road, Brgy. alsem Roads and bridges · 2022 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱19.6MCompleted · 100%
₱81.1MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Vintar since 2016.

1
MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY67 projects · ₱1.87B
2
BJMJB CONSTRUCTION & SUPPLY58 projects · ₱1.03B
3
JCA CONSTRUCTION AND CONSTRUCTION SUPPLY34 projects · ₱482.9M
4
KATHA BUILDERS & SUPPLIES INC.27 projects · ₱894.2M
5
ZEDIK BUILDERS25 projects · ₱136.3M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →