Official seal of La Union

La Union: Government

Province in Ilocos, Luzon · 20 towns and cities

National projects

Built by DPWH in La Union since 2016.

2396projects
₱60.26Bin all
128ongoing
16slow
  • Roads and bridges ₱31.00B
  • Flood control ₱21.24B
  • Buildings ₱5.76B
  • Schools ₱1.37B
  • Water ₱476.1M
  • Other ₱412.3M

Showing 841 to 870 of 2,112

Retrofitting/strengthening of permanent bridges, Picao bridge (b00822lz) along agoo-baguio city road Roads and bridges · Tubao · 2022 · ALPHATEC CHEMICAL CORPORATION
₱20.7MCompleted · 100%
₱23.2MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Bauang bridge 2 (b002645lz) along manila north road Roads and bridges · Bauang · 2022 · ALPHATEC CHEMICAL CORPORATION
₱62.7MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Matanobong bridge (b00819lz) along agoo-baguio city road Roads and bridges · Agoo · 2022 · SYNDTITE CONSTRUCTION CORPORATION
₱23.6MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Cares bridge (b00826lz) along agoo-baguio city road Roads and bridges · Pugo · 2022 · ALPHATEC CHEMICAL CORPORATION
₱50.2MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Lloren bridge (b00823lz) along agoo-baguio city road Roads and bridges · Tubao · 2022 · ALPHATEC CHEMICAL CORPORATION
₱9.2MCompleted · 100%
₱11.6MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Carlatan bridge (b02649lz) along manila north road Roads and bridges · San Juan · 2022 · ALPHATEC CHEMICAL CORPORATION
₱24.1MCompleted · 100%
Const. of evacuation center at pudoc elem. school (phase i), Brgy. pudoc Schools · Bauang · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.8MCompleted · 100%
Const. of multi purpose building, Brgy. parian oeste, Lu Buildings · Bauang · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.8MCompleted · 100%
Const. of multi purpose bldg. brgy. casilagan, Lu Buildings · Bauang · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.9MCompleted · 100%
₱8.7MCompleted · 100%
₱42.7MCompleted · 100%
Const of flood control & drainage structure at brgys. cupang and casilagan, Lu Flood control · Santo Tomas · 2022 · E.E. MADAYAG CONSTRUCTION
₱44.1MCompleted · 100%
Construction of multi purpose bldg, Brgy. pudoc Buildings · Bauang · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.8MCompleted · 100%
Const. of evacuation center (phase i) at sto tomas central school, Brgy. poblacion, Lu Schools · Santo Tomas · 2022 · E.E. MADAYAG CONSTRUCTION
₱4.8MCompleted · 100%
Const. of multi-purpose bldg at saytan integrated school, Brgy. saytan, Lu Schools · Pugo · 2022 · E.E. MADAYAG CONSTRUCTION
₱4.8MCompleted · 100%
Construction of evacuation center, Brgy. san luis Buildings · Pugo · 2022 · E.E. MADAYAG CONSTRUCTION
₱4.8MCompleted · 100%
₱9.6MCompleted · 100%
Rehabilitation of damaged shore protection works, Brgys san manuel norte & san manuel sur, Lu Flood control · Agoo · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱9.6MCompleted · 100%
Construction of flood control structure along bauang river basin, Brgy. baraoas norte, Nag., Lu Flood control · Naguilian · 2022 · E.E. MADAYAG CONSTRUCTION
₱9.5MCompleted · 100%
₱44.1MCompleted · 100%
Const. of multi purpose bldg (abc legislative hall) brgy. central west bauang Buildings · Bauang · 2022 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.8MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in La Union since 2016.

1
E.E. MADAYAG CONSTRUCTION384 projects · ₱3.04B
2
VILLAR GENERAL CONSTRUCTION AND SUPPLIES239 projects · ₱3.29B
3
J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND SUPPLIES156 projects · ₱1.16B
4
ARM-ASIA CONSTRUCTION & ENGINEERING82 projects · ₱698.9M
5
ALPHATEC CHEMICAL CORPORATION76 projects · ₱1.91B

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →