National projects
2396projects
₱60.26Bin all
128ongoing
16slow
- Roads and bridges ₱31.00B
- Flood control ₱21.24B
- Buildings ₱5.76B
- Schools ₱1.37B
- Water ₱476.1M
- Other ₱412.3M
Showing 181 to 210 of 2,396
Retrofitting/ strengthening of permanent bridges, Pias br. (b02422lz) along sn fernando-bagulin rd
Roads and bridges · San Juan · 2025 · ALPHATEC CHEMICAL CORPORATION
₱6.3MCompleted · 100%
Retrofitting/ strengthening of permanent bridges, Tabora br.(b02635lz) along manila north rd
Roads and bridges · Agoo · 2025 · ALPHATEC CHEMICAL CORPORATION
₱11.8MCompleted · 100%
Retrofitting / strengthening of permanent bridges, Sta. rita br. (b02653lz) along manila north road
Roads and bridges · Bacnotan · 2025 · ALPHATEC CHEMICAL CORPORATION
₱6.7MCompleted · 100%
Retrofitting / strengthening of permanent bridges, Masupe br. (b04861lz) along manila north road
Roads and bridges · Balaoan · 2025 · ALPHATEC CHEMICAL CORPORATION
₱2.9MCompleted · 100%
Retrofitting/ strengthening of permanent bridges, Old poblacion br.(b04859lz) along alilem-sugpon-sudipen rd
Roads and bridges · Sudipen · 2025 · ALPHATEC CHEMICAL CORPORATION
₱14.6MCompleted · 100%
Construction of flood control structure along aringay river basin, Package 1, Barangay anduyan
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱57.6MCompleted · 100%
Retrofitting/ strengthening of permanent bridges, Alimungao west br.(b04856lz) along alilem-sugpon-sudipen rd
Roads and bridges · Sudipen · 2025 · ALPHATEC CHEMICAL CORPORATION
₱10.1MCompleted · 100%
Construction of flood control structure along aringay river basin, Package 5, Barangay anduyan
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱57.6MOn-Going · 100%
Construction of flood control structure along aringay river basin, Package 2, Barangay anduyan
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱57.6MOn-Going · 100%
Construction of flood control structure along aringay river basin, Package 4, Barangay anduyan
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱57.6MOn-Going · 100%
Retrofitting/ strengthening of permanent bridges, Alimungao east br.(b04857lz) along alilem-sugpon-sudipen rd
Roads and bridges · Sudipen · 2025 · ALPHATEC CHEMICAL CORPORATION
₱10.1MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems - construction of flood control structure along santol-san gabriel-kapangan road, Maluyo river, Barangay mangaan, Santol la union
Flood control · Santol · 2025 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱146.3MOn-Going · 35%
Retrofitting/ strengthening of permanent bridges, Negro br. (b02420lz) along sn fernando-bagulin rd
Roads and bridges · San Juan · 2025 · ALPHATEC CHEMICAL CORPORATION
₱3.1MCompleted · 100%
Retrofitting/ strengthening of permanent bridges, Ilocano br.(b04858lz) along alilem-sugpon-sudipen rd
Roads and bridges · Sudipen · 2025 · ALPHATEC CHEMICAL CORPORATION
₱7.6MCompleted · 100%
Construction of hall of justice, Phase iii, Brgy. san agustin east
Buildings · Agoo · 2025 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
₱56.8MOn-Going · 88%
Retrofitting/ strengthening of permanent bridges, Camansi br. (b02421lz) along sn fernando-bagulin rd
Roads and bridges · San Juan · 2025 · ALPHATEC CHEMICAL CORPORATION
₱1.1MCompleted · 100%
Construction of flood control structure, Barangay halog east
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱33.6MCompleted · 100%
Construction of missing links/ new roads, Santol (la union) - kibungan (benguet) road (santol section)
Roads and bridges · Santol · 2025 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
₱93.3MOn-Going · 0%
Rehabilitation of baroro river control, Barangay santo rosario, La union - (re-advertisement)
Flood control · San Juan · 2024 · APP CONSTRUCTION AND SUPPLIES
₱18.7MCompleted · 100%
Construction of waterways, Barangay sapilang, La union (re-advertisement)
Other · Bacnotan · 2024 · APP CONSTRUCTION AND SUPPLIES
₱18.7MCompleted · 100%
Construction of missing links/ new roads, Santol-san gabriel (la union) - kapangan (benguet) road, La union (package 6)
Roads and bridges · Santol · 2025 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱93.4MOn-Going · 1%
Construction of missing links/ new roads, Santol (la union) - kibungan (benguet) road (santol section), Package 1
Roads and bridges · Santol · 2025 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱107.4MOn-Going · 1%
Construction of missing links/new roads - santol (la union) - kibungan (benguet) road (sugpon section)
Roads and bridges · Santol · 2025 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱56.1MOn-Going · 25%
Construction of water supply system, Brgy. basca
Water · Aringay · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱4.9MCompleted · 100%
Const of flood control structures along aringay river basin, Package 12
Flood control · Tubao · 2025 · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES
₱96.5MCompleted · 100%
Const.rehab. of flood mit. faci. w/in major river basins & prin. rivers - const. of flood cont. struc. along aringay river basin, La union (package 10)
Flood control · Tubao · 2025 · JWU CONSTRUCTION AND SUPPLY
₱96.5MCompleted · 100%
Const. of multi-purpose bldg. (covered court), Brgy. santa maria
Buildings · Agoo · 2025 · KRYPTONITE 6S BUILDERS INC.
₱4.8MCompleted · 100%
Const/rehab of flood miti faci w/in major river basins & principal rivers-const of flood cntrl struc. along aringay river basin, Package 13
Flood control · Tubao · 2025 · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES
₱96.5MCompleted · 100%
Const. of multi purpose bldg (covered court) brgy. lomboy
Buildings · Santo Tomas · 2025 · E.E. MADAYAG CONSTRUCTION
₱4.8MCompleted · 100%
Const/rehab. of flood mitigation facilities w/.in major river basins & principal rivers - const. of flood control structures along aringay river basin, Package 14, Lu
Flood control · Tubao · 2025 · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES
₱65.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
E.E. MADAYAG CONSTRUCTION384 projects · ₱3.04B
2
VILLAR GENERAL CONSTRUCTION AND SUPPLIES239 projects · ₱3.29B
3
J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND SUPPLIES156 projects · ₱1.16B
4
ARM-ASIA CONSTRUCTION & ENGINEERING82 projects · ₱698.9M
5
ALPHATEC CHEMICAL CORPORATION76 projects · ₱1.91B