Bolinao: Government

Municipality in Pangasinan, Ilocos, Luzon · 30 barangays

National projects

Built by DPWH in Bolinao since 2016.

371projects
₱3.59Bin all
11ongoing
3slow
  • Roads and bridges ₱2.57B
  • Schools ₱417.7M
  • Buildings ₱377.6M
  • Flood control ₱158.6M
  • Other ₱60.5M
  • Water ₱12.6M
Construction of road, Barangay tupa(8+508 - 8+798) Roads and bridges · 2026 · SZCON BUILDERS INC.
₱4.6MOn-Going · 0%
Installation of solar led street lights along alaminos-bolinao road k0357+660-k0361+140 Roads and bridges · 2025 · IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION
₱70.9MOn-Going · 100%
Installation of solar led street lights along alaminos-bolinao road, K0354+180-k0357+660 Roads and bridges · 2025 · IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION
₱70.9MOn-Going · 49%
Installation of road safety facilities (roadway lighting) along alaminos-bolinao rd - k0353 + 618 - k0361 + 121 Roads and bridges · 2025 · IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / TIJ CONSTRUCTION INC.
₱69.8MOn-Going · 51%
Construction of bridge along barangay cabuyao, Sitio lubigan to barangay tupa sitio pansur Roads and bridges · 2025 · ALCEL CONSTRUCTION / SAMANTHA ENTERPRISES
₱93.1MOn-Going · 81%
Construction of bridge connecting bolinao to santiago island, Pangasinan (package 2) Roads and bridges · 2025 · M.G. LUALHATI CONSTRUCTION CORP.
₱110.8MOn-Going · 3%
Construction of bridge connecting bolinao to santiago island, Pangasinan (package 1) Roads and bridges · 2025 · M.G. LUALHATI CONSTRUCTION CORP.
₱93.6MOn-Going · 1%
Construction of road, Barangay germinal Roads and bridges · 2025 · JONIK TRADING & CONSTRUCTION
₱9.6MOn-Going · 100%
Construction of bridge connecting bolinao to santiago island (package a) Roads and bridges · 2024 · M.G. LUALHATI CONSTRUCTION CORP.
₱28.3MOn-Going · 2%Slow
Construction of bridge connecting santiago island to bolinao, Pangasinan (package a) Roads and bridges · 2024 · M.G. LUALHATI CONSTRUCTION CORP.
₱97.0MOn-Going · 0%Slow
₱33.0MOn-Going · 0%Slow

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Bolinao since 2016.

1
JONIK TRADING & CONSTRUCTION160 projects · ₱1.16B
2
RAMDC CONSTRUCTION AND TRADING81 projects · ₱630.8M
3
ALCEL CONSTRUCTION33 projects · ₱222.4M
4
SZCON BUILDERS INC.12 projects · ₱75.1M
5
ST. ALMERS CONSTRUCTION AND ENTERPRISE10 projects · ₱51.7M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.