SF
San Fernando: Government
Municipality in Romblon, Mimaropa, Luzon · 12 barangays
National projects
54projects
₱1.86Bin all
8ongoing
0slow
- Flood control ₱1.22B
- Roads and bridges ₱268.3M
- Buildings ₱200.5M
- Other ₱93.3M
- Water ₱43.7M
- Schools ₱41.8M
Showing 1 to 30 of 54
Completion of multi-purpose building at campalingo elementary school
Schools · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱2.0MCompleted · 100%
Construction of multi-purpose building at barangay taclobo
Buildings · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱4.9MOn-Going · 84%
Construction of flood control structure, Sitio cabitangahan barangay taclobo
Flood control · 2025 · SUNWEST, INC.
₱145.5MOn-Going · 100%
Construction of flood control structure, Barangay cantingas
Flood control · 2025 · SUNWEST, INC.
₱145.5MOn-Going · 93%
Construction of campalingo flood control structure along sibuyan circumferential road, Phase 2, Brgy. campalingo
Flood control · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱27.1MOn-Going · 100%
Construction of pili flood control structure phase 2, Barangay pili
Flood control · 2025 · SCATR CONSTRUCTION
₱141.0MOn-Going · 90%
Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of pili riverside protection structure, Downstream, Poblacion
Flood control · 2025 · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
₱144.7MOn-Going · 94%
Const. of riverside protection structure, Downstream, Brgy. punong
Flood control · 2025 · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
₱229.8MOn-Going · 88%
Construction of multipurpose building including its solar powered system and desalination
Buildings · 2023 · SCHEIRMAN CONSTRUCTION CONSOLIDATED INC.
₱97.2MOn-Going · 0%
Improvement of cantingas ris drainage system
Flood control · 2024 · R.G. FLORENTINO CONST. & TRADING INC.
₱19.6MCompleted · 100%
Construction of road, Barangay taclobo, San fernando-phase ii, Taclobo
Roads and bridges · 2024 · R.G. FLORENTINO CONST. & TRADING INC.
₱9.9MCompleted · 100%
Construction of 1sty2cl, Armin rios-marin national high school
Schools · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱4.1MCompleted · 100%
Construction of multi-purpose building at campalingo elementary school
Schools · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱4.9MCompleted · 100%
Construction of campalingo flood control structure along sibuyan circumferential road (upstream & downstream), Sta. 00+080 - sta. 00+150, Sta. 00+158 - sta. 00+240 at ds (r/s), Sta. 00+320 - sta. 00+365, Sta. 00+375 - sta. 00+420 at us (r/s), Sta. 00+320
Flood control · 2023 · ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR
₱50.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay agtiwa
Buildings · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱1.9MCompleted · 100%
Const. of espana flood control structure (phase 2), Brgy. espana, Sta. 0+000-sta. 0+213 (bs)
Flood control · 2022 · LEGACY CONSTRUCTION CORPORATION
₱74.2MCompleted · 100%
Construction of access road, Barangay taclobo, Sta. 00+000.00 - sta 00+350.50
Roads and bridges · 2022 · R.G. FLORENTINO CONST. & TRADING INC.
₱9.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay panangcalan
Buildings · 2022 · MT. GUITING-GUITING CONSTRUCTION
₱1.9MCompleted · 100%
Construction of mabulo flood control structure (upstream), Sta. 0+600.00 - sta. 0+762.80 (l/s)
Flood control · 2022 · MT. GUITING-GUITING CONSTRUCTION
₱24.5MCompleted · 100%
Construction of panangcalan flood control structure (downstream), Sta. 0+080.00 - sta. 0+160.00 (l/s), Sta. 0+080.00 - sta. 0+164.00 (r/s)
Flood control · 2022 · MGMP CORPORATION
₱24.3MCompleted · 100%
Construction of level iii water supply project
Water · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱43.7MCompleted · 100%
Construction of multi-purpose building (multi-purpose hall) at barangay agtiwa
Buildings · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱5.3MCompleted · 100%
Construction of multi - purpose building (multi - purpose hall) at barangay otod
Buildings · 2021 · R.G. FLORENTINO CONST. & TRADING INC.
₱4.9MCompleted · 100%
Construction of multi - purpose building (multi - purpose hall) at don carlos m. mejias memorial national high school
Schools · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱2.9MCompleted · 100%
Replacement of permanent weak bridges - pili bridge (b00035sy) along sibuyan circumferential road
Roads and bridges · 2020 · THREE W BUILDERS, INC.
₱31.9MCompleted · 100%
Construction of shore protection/causeway, Poblacion
Other · 2020 · SUNWEST, INC.
₱93.3MCompleted · 100%
Const. of coastal road needing boulevard for tourism along espana, Sta. 0+000-sta. 0+210
Roads and bridges · 2020 · SUNWEST, INC.
₱95.6MCompleted · 100%
Construction of multi - purpose building, Brgy. azagra
Buildings · 2020 · LEGACY CONSTRUCTION CORPORATION
₱4.9MCompleted · 100%
Construction of olango flood control, Sta. 000 + 475.00 - sta. 000 + 735.00
Flood control · 2020 · LEGACY CONSTRUCTION CORPORATION
₱28.2MCompleted · 100%
Construction of evacuation center in barangay panangcalan
Buildings · 2019 · TWIN DRAGON CONSTRUCTION
₱34.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
Who builds here
1
MT. GUITING-GUITING CONSTRUCTION11 projects · ₱123.2M
2
LEGACY CONSTRUCTION CORPORATION10 projects · ₱291.8M
3
MGMP CORPORATION8 projects · ₱49.4M
4
ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.6 projects · ₱25.0M
5
SUNWEST, INC.5 projects · ₱579.1M