National projects
478projects
₱13.94Bin all
45ongoing
3slow
- Flood control ₱8.57B
- Buildings ₱2.34B
- Schools ₱1.15B
- Roads and bridges ₱1.05B
- Other ₱816.3M
- Water ₱19.3M
Showing 31 to 45 of 45
Construction of box culvert along tecson st. and galicia st., Barangay bangkulasi
Flood control · 2025 · JONOR DC CONSTRUCTION
₱14.3MOn-Going · 29%
Construction of box culvert along f. pascual st., Barangay san jose
Flood control · 2025 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱36.2MOn-Going · 4%
Construction of box culvert along daanghari st., Barangay daanghari
Flood control · 2025 · 721 BUILDERS CORPORATION
₱23.8MOn-Going · 25%
Rehabilitation of north navotas pumping station and navotas navigation gate (phase 3), Navotas city (re-advertisement)
Other · 2024 · ANORE CONSTRUCTION / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱289.3MOn-Going · 63%
Construction (completion) of floodgates no. 5 and no. 6 along navotas coastal dike
Flood control · 2024 · HALREY CONSTRUCTION INC.
₱93.6MOn-Going · 53%Slow
Construction of bridge, Brgy. north bay blvd. south
Roads and bridges · 2024 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱49.0MOn-Going · 99%
Construction of multi-purpose bldg. (convention, Sports and disaster center), Brgy. bagumbayan south
Buildings · 2024 · MRB11 CONSTRUCTION CORPORATION
₱34.6MOn-Going · 98%
Installation/application of signage and pavement markings along c-3 road - k0007 + 070 - k0007 + 789, Barangay northbay
Roads and bridges · 2024 · P7 BUILDERS INC.
₱779KOn-Going · 0%Slow
Construction of multi-purpose building (convention and disaster center), Barangay bagumbayan south, Phase 11
Buildings · 2024 · MRB11 CONSTRUCTION CORPORATION
₱49.5MOn-Going · 98%
Construction of navotas coastal dike (completion), Navotas city (re-advertisement)
Flood control · 2023 · HALREY CONSTRUCTION INC.
₱37.8MOn-Going · 72%
Construction of floodgates number 5 and number 6 along navotas coastal dike
Flood control · 2023 · HALREY CONSTRUCTION INC.
₱231.6MOn-Going · 82%
Construction of floodgates number 3 and number 4 along navotas coastal dike
Flood control · 2023 · KAEL CONSTRUCTION AND SUPPLY / PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.
₱328.1MOn-Going · 81%
Construction of two (2) pumping station along navotas coastal dike (phase 6)
Flood control · 2023 · MSB VITUG CONSTRUCTION INC.
₱250.9MOn-Going · 100%
Construction of four (4) storey, Eight (8) classroom school building, Navotas national high school
Schools · 2023 · TM ABAD CONSTRUCTION CORP.
₱982KOn-Going · 10%Slow
Provision of two (2) pumping stations along navotas coastal dike with box culvert (phase 2)
Flood control · 2019 · MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. / PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.
₱139.6MOn-Going · 91%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M