National projects
478projects
₱13.94Bin all
45ongoing
3slow
- Flood control ₱8.57B
- Buildings ₱2.34B
- Schools ₱1.15B
- Roads and bridges ₱1.05B
- Other ₱816.3M
- Water ₱19.3M
Showing 31 to 60 of 478
Construction of box culvert along alpha st., Brgy. bangkulasi
Flood control · 2025 · 5-1 CONSTRUCTION CORPORATION
₱19.0MOn-Going · 7%
Construction of c-4 flood gate (phase 1)
Flood control · 2025 · IM CONSTRUCTION CORPORATION
₱47.5MCompleted · 100%
Rehabilitation of multi-purpose building, Wawa basketball court, Barangay tangos south
Buildings · 2025 · TM ABAD CONSTRUCTION CORP.
₱19.4MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved roads - tertiary roads - north bay blvd - k0009 + 618 - k0009 + 733
Roads and bridges · 2025 · JMDEL CONSTRUCTION
₱8.2MCompleted · 100%
Construction of school building, Tanza national high school
Schools · 2025 · STREAMLINE BUILDERS CORPORATION
₱29.1MOn-Going · 59%
Construction (completion) of multi-purpose building, Tanza pabahay
Buildings · 2025 · STRUKTURA TEKNIKA SERVICES CO.
₱2.9MCompleted · 100%
Construction of flood mitigation structure in barangay tanza (phase 1)
Flood control · 2025 · KATHA BUILDERS & SUPPLIES INC.
₱49.0MCompleted · 100%
Rehabilitation of multi-purpose building, S. roldan basketball court, Barangay tangos south
Buildings · 2025 · 721 BUILDERS CORPORATION
₱19.8MOn-Going · 70%
Rehabilitation of flood mitigation structure along marala river (phase 1)
Flood control · 2025 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱47.5MCompleted · 100%
Rehabilitation of multi-purpose building, Bacog basketball court, Barangay daanghari
Buildings · 2025 · MCORR CONSTRUCTION
₱19.4MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-c, Barangay nbbs kaunlaran
Buildings · 2025 · TM ABAD CONSTRUCTION CORP.
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-a, Barangay nbbs kaunlaran
Buildings · 2025 · TM ABAD CONSTRUCTION CORP.
₱2.9MCompleted · 100%
Construction (completion) of navotas convention center building
Buildings · 2025 · MRB11 CONSTRUCTION CORPORATION
₱4.8MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-b, Barangay nbbs kaunlaran
Buildings · 2025 · TM ABAD CONSTRUCTION CORP.
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building (school building) at navotas national high school
Schools · 2025 · PLL BUILDERS INC.
₱10.7MOn-Going · 86%
Construction of box culvert at e. rodriguez (phase 2)
Flood control · 2025 · R2CG BUILDERS INC.
₱9.5MOn-Going · 0%
Rainwater collector system
Water · 2025 · P7 BUILDERS INC.
₱2.6MCompleted · 100%
Construction (completion) of navotas polytechnic college (npc) building
Buildings · 2025 · MRB11 CONSTRUCTION CORPORATION
₱7.8MCompleted · 100%
Rehabilitation/major repair of permanent bridges - r-10 br. 2 (b01746lz) along r-10
Roads and bridges · 2025 · MCORR CONSTRUCTION
₱9.6MCompleted · 100%
Construction (completion) of multi-purpose building, Kapitbahayan, Barangay nbbs kaunlaran
Buildings · 2025 · TWO DIMENSION CONSTRUCTION
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building, Phase ii area i, Barangay nbbs dagat-dagatan
Buildings · 2025 · P7 BUILDERS INC.
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building, Tanza pabahay, Barangay san rafael village
Buildings · 2025 · 721 BUILDERS CORPORATION
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building, Tumana, Brgy. nbbs dagat-dagatan
Buildings · 2025 · CARRY-ON CONSTRUCTION
₱2.9MCompleted · 100%
Construction (completion) of bridge, Brgy. north bay blvd., South
Roads and bridges · 2025 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱0Terminated · 0%
Rehabilitation (completion) of navotas multi-purpose building, Barangay sipac-almacen
Buildings · 2025 · STRUKTURA TEKNIKA SERVICES CO.
₱3.9MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 6)
Flood control · 2025 · ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP.
₱58.0MCompleted · 100%
Construction of multi-purpose building (phase 1), Barangay tanza
Buildings · 2025 · B. BERNARDO CONST., INC.
₱48.5MOn-Going · 76%
Construction of box culvert along bagong silang st., Barangay san jose
Flood control · 2025 · JONOR DC CONSTRUCTION
₱14.3MCompleted · 100%
Construction of drainage system along estrella st.
Flood control · 2025 · JONOR DC CONSTRUCTION
₱14.3MOn-Going · 32%
Construction of riverwalls along tangos river, Phase 6
Flood control · 2025 · KATHA BUILDERS & SUPPLIES INC. / STRUKTURA TEKNIKA SERVICES CO.
₱49.0MOn-Going · 48%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M