National projects
478projects
₱13.94Bin all
45ongoing
3slow
- Flood control ₱8.57B
- Buildings ₱2.34B
- Schools ₱1.15B
- Roads and bridges ₱1.05B
- Other ₱816.3M
- Water ₱19.3M
Showing 61 to 90 of 392
Construction of b. caseñas pumping station (phase 2), Brgy. tangos north
Flood control · 2024 · STRUKTURA TEKNIKA SERVICES CO.
₱29.4MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-b, Barangay nbbs kaunlaran
Buildings · 2024 · DOUBLE Z CONSTRUCTION AND SUPPLY
₱14.1MCompleted · 100%
Construction of drainage system along north bay blvd.
Flood control · 2024 · JONOR DC CONSTRUCTION
₱29.4MCompleted · 100%
Rehabilitation (phase 2) of navotas multi-purpose building, Barangay sipac-almacen
Buildings · 2024 · STRUKTURA TEKNIKA SERVICES CO.
₱19.8MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-c, Barangay nbbs kaunlaran
Buildings · 2024 · DOUBLE Z CONSTRUCTION AND SUPPLY
₱11.3MCompleted · 100%
Construction (completion) of multi-purpose building, Phase ii area i, Barangay nbbs dagat-dagatan
Buildings · 2024 · MRB11 CONSTRUCTION CORPORATION
₱11.6MCompleted · 100%
Construction (completion) of multi-purpose building, Phase 1-a, Barangay nbbs kaunlaran
Buildings · 2024 · DOUBLE Z CONSTRUCTION AND SUPPLY
₱13.3MCompleted · 100%
Construction of flood mitigation system at r10, Barangay north bay boulevard south - proper, Metro manila
Flood control · 2024 · JONOR DC CONSTRUCTION
₱9.9MCompleted · 100%
Construction of box culvert along f. pascual st., Brgy. daanghari
Flood control · 2024 · 721 BUILDERS CORPORATION
₱19.6MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved roads - secondary roads c-3 road (left) (s02121lz)
Roads and bridges · 2024 · M.S. RAMOS CONSTRUCTION INC.
₱49.0MCompleted · 100%
Construction of babanse i pumping station (phase 2), Barangay north bay boulevard south - kaunlaran
Flood control · 2024 · EARTHWORK BUILDERS, INC.
₱9.9MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved roads - secondary roads c-3 road (right) (s02120lz)
Roads and bridges · 2024 · M.S. RAMOS CONSTRUCTION INC.
₱49.0MCompleted · 100%
Construction of doña aurora pumping station, Barangay tanza 2
Other · 2024 · EARTHWORK BUILDERS, INC.
₱29.4MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads-tertiary roads-m. naval st-k0011 + (-888)-k0011 + (-206)
Flood control · 2024 · E.M. CUERPO, INC.
₱49.0MCompleted · 100%
Construction of badeo 5 pumping station, Barangay san roque
Flood control · 2024 · C.T. LEONCIO CONSTRUCTION & TRADING
₱49.0MCompleted · 100%
Construction of f. cruz pumping station, Barangay tangos north
Flood control · 2024 · STRUKTURA TEKNIKA SERVICES CO.
₱49.0MCompleted · 100%
Construction of box culvert along judge roldan st. (phase 2), Barangay san roque
Flood control · 2024 · EARTHWORK BUILDERS, INC.
₱6.9MCompleted · 100%
Construction of pumping station, Navotas city hall, Barangay sipac almacen
Flood control · 2024 · STRUKTURA TEKNIKA SERVICES CO.
₱29.4MCompleted · 100%
Construction of box culvert along sampaguita st., (from doña luz to azucena st.)
Flood control · 2024 · EARTHWORK BUILDERS, INC.
₱19.6MCompleted · 100%
Construction of riverwall along tangos river (phase 2) navotas city
Flood control · 2024 · TOPNOTCH CATALYST BUILDERS INC.
₱49.0MCompleted · 100%
Construction of tambak uno pumping station, Barangay tanza 2
Flood control · 2024 · 721 BUILDERS CORPORATION
₱29.4MCompleted · 100%
Construction of ablola pumping station, Barangay tangos north
Flood control · 2024 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱49.0MCompleted · 100%
Construction (completion) of box culvert canal along c-4 road from lizan to 100 interior bagumbayan south
Flood control · 2024 · TRI-DAN-J CONSTRUCTION AND TRADING
₱11.8MCompleted · 100%
Construction of pumping station, Daanghari creek, Barangay daanghari
Flood control · 2024 · P7 BUILDERS INC.
₱29.4MCompleted · 100%
Rehabilitation of drainage system, Navotas elementary school
Schools · 2024 · EARTHWORK BUILDERS, INC.
₱4.9MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved roads-tertiary roads-north bay blvd-k0008 + 251-k0008 + 621
Roads and bridges · 2024 · EARTHWORK BUILDERS, INC.
₱12.4MCompleted · 100%
Rehabilitation/major repair of permanent bridges-bangkulasi bridge (b05083lz) along north bay blvd.
Roads and bridges · 2024 · MCORR CONSTRUCTION
₱4.9MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads - tertiary roads, Gov a pascual st. - k0012 + 262 - k0012+805
Roads and bridges · 2024 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱37.2MCompleted · 100%
Construction of box culvert along m. naval st., From f. pascual st. to paltok creek
Flood control · 2024 · IM CONSTRUCTION CORPORATION
₱49.0MCompleted · 100%
Construction of riverwall along tanza dike (phase 3) barangay tanza
Flood control · 2024 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱49.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M