Official seal of Navotas City

Navotas City: Government

City in Metro Manila, Luzon · 18 barangays

National projects

Built by DPWH in Navotas City since 2016.

478projects
₱13.94Bin all
45ongoing
3slow
  • Flood control ₱8.57B
  • Buildings ₱2.34B
  • Schools ₱1.15B
  • Roads and bridges ₱1.05B
  • Other ₱816.3M
  • Water ₱19.3M

Showing 121 to 150 of 392

₱19.8MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 4) Flood control · 2023 · A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP.
₱62.7MCompleted · 100%
₱62.7MCompleted · 100%
Construction of kanduli pumping station, Brgy. nbbs kaunlaran Flood control · 2023 · 721 BUILDERS CORPORATION
₱23.3MCompleted · 100%
Construction of milflores pumping station, Brgy. tanza 2 Flood control · 2023 · 5-1 CONSTRUCTION CORPORATION
₱23.3MCompleted · 100%
Construction of site 8 (mamale 2) pumping station, Brgy. nbbs dagat-dagatan Flood control · 2023 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱23.3MCompleted · 100%
Construction of b. caseñas pumping station, Brgy. tangos north Flood control · 2023 · BLACK HARDHAT INC.
₱22.6MCompleted · 100%
Construction of maliputo pumping station, Brgy. nbbs dagat-dagatan Flood control · 2023 · EARTHWORK BUILDERS, INC.
₱23.3MCompleted · 100%
Construction of b. cruz pumping station, Brgy. tangos north Flood control · 2023 · TWO DIMENSION CONSTRUCTION
₱23.3MCompleted · 100%
Construction of babanse 1 pumping station, Brgy. nbbs kaunlaran Flood control · 2023 · EARTHWORK BUILDERS, INC.
₱23.3MCompleted · 100%
Construction of mamale 1 pumping station, Nbbs dagat-dagatan Flood control · 2023 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱23.3MCompleted · 100%
₱14.7MCompleted · 100%
Construction (completion) of multi-purpose building, Tumana, Brgy. nbbs dagat-dagatan Buildings · 2023 · LARSEN-DUTCHER CONSTRACTOR CORPORATION
₱14.7MCompleted · 100%
₱9.6MCompleted · 100%
₱8.6MCompleted · 100%
₱9.6MCompleted · 100%
Construction of multi-purpose building, (phase 2) tanza pabahay, Brgy. tanza 2 Buildings · 2023 · STRUKTURA TEKNIKA SERVICES CO.
₱49.0MCompleted · 100%
₱4.9MCompleted · 100%
₱14.7MCompleted · 100%
Rehabilitation/major repair of permanent bridges, Marala br. (b01747lz) along north bay blvd Roads and bridges · 2023 · Q-R BUILDING SOLUTIONS CORPORATION
₱9.8MCompleted · 100%
Construction of flood mitigation structure, Barangay dampalit, Malabon city (phase 3) Flood control · 2023 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱49.0MCompleted · 100%
Construction of flood mitigation structure, Barangay dampalit, Malabon city (phase 5) Flood control · 2023 · E.L. TORRES CONSTRUCTION AND TRADING INC.
₱49.0MCompleted · 100%
Construction of flood mitigation structure, Barangay dampalit, Malabon city (phase 4) Flood control · 2023 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
₱49.0MCompleted · 100%
₱144.7MCompleted · 100%
Construction of two (2) floodgates along navotas coastal dike, Navotas city(construction of floodgate no. 1 and electrical works for floodgates no. 1 and 2) Flood control · 2022 · NEWBIG FOUR J CONSTRUCTION INC. / PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.
₱241.2MCompleted · 100%
Upgrading of bangkulasi pumping station Flood control · 2022 · MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. / PRAETORIA BUILDERS INCORPORATED
₱48.2MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Navotas City since 2016.

1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →