National projects
478projects
₱13.94Bin all
45ongoing
3slow
- Flood control ₱8.57B
- Buildings ₱2.34B
- Schools ₱1.15B
- Roads and bridges ₱1.05B
- Other ₱816.3M
- Water ₱19.3M
Showing 121 to 150 of 478
Construction of box culvert along judge roldan st. (phase 2), Barangay san roque
Flood control · 2024 · EARTHWORK BUILDERS, INC.
₱6.9MCompleted · 100%
Construction of pumping station, Navotas city hall, Barangay sipac almacen
Flood control · 2024 · STRUKTURA TEKNIKA SERVICES CO.
₱29.4MCompleted · 100%
Construction of box culvert along sampaguita st., (from doña luz to azucena st.)
Flood control · 2024 · EARTHWORK BUILDERS, INC.
₱19.6MCompleted · 100%
Construction of riverwall along tangos river (phase 2) navotas city
Flood control · 2024 · TOPNOTCH CATALYST BUILDERS INC.
₱49.0MCompleted · 100%
Construction of tambak uno pumping station, Barangay tanza 2
Flood control · 2024 · 721 BUILDERS CORPORATION
₱29.4MCompleted · 100%
Construction of ablola pumping station, Barangay tangos north
Flood control · 2024 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱49.0MCompleted · 100%
Construction (completion) of box culvert canal along c-4 road from lizan to 100 interior bagumbayan south
Flood control · 2024 · TRI-DAN-J CONSTRUCTION AND TRADING
₱11.8MCompleted · 100%
Construction of pumping station, Daanghari creek, Barangay daanghari
Flood control · 2024 · P7 BUILDERS INC.
₱29.4MCompleted · 100%
Rehabilitation of drainage system, Navotas elementary school
Schools · 2024 · EARTHWORK BUILDERS, INC.
₱4.9MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved roads-tertiary roads-north bay blvd-k0008 + 251-k0008 + 621
Roads and bridges · 2024 · EARTHWORK BUILDERS, INC.
₱12.4MCompleted · 100%
Rehabilitation/major repair of permanent bridges-bangkulasi bridge (b05083lz) along north bay blvd.
Roads and bridges · 2024 · MCORR CONSTRUCTION
₱4.9MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads - tertiary roads, Gov a pascual st. - k0012 + 262 - k0012+805
Roads and bridges · 2024 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱37.2MCompleted · 100%
Construction of box culvert along m. naval st., From f. pascual st. to paltok creek
Flood control · 2024 · IM CONSTRUCTION CORPORATION
₱49.0MCompleted · 100%
Construction of riverwall along tanza dike (phase 3) barangay tanza
Flood control · 2024 · JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
₱49.0MCompleted · 100%
Construction of box culvert along m. naval st., From badeo 2 to f. pascual st.
Flood control · 2024 · IM CONSTRUCTION CORPORATION
₱49.0MCompleted · 100%
Construction of drainage system along northbay boulevard
Flood control · 2024 · 721 BUILDERS CORPORATION
₱4.9MCompleted · 100%
Rehabilitation of road, Simeon de jesus st., Barangay san rafael village
Roads and bridges · 2024 · TWO DIMENSION CONSTRUCTION
₱11.7MCompleted · 100%
Construction of drainage system along c-4 road
Flood control · 2024 · C.B. TAMPENGCO CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Construction of drainage system in barangay tanza
Flood control · 2024 · 721 BUILDERS CORPORATION
₱15.7MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads - secondary roads, C-3 road - (s02121lz) chainage 278-chainage 710, Chainage 73.60 - chainage 278
Roads and bridges · 2024 · B. BERNARDO CONST., INC.
₱39.2MCompleted · 100%
Construction of navotas coastal dike (completion), Navotas city (re-advertisement)
Flood control · 2023 · HALREY CONSTRUCTION INC.
₱37.8MOn-Going · 72%
Construction of floodgates number 5 and number 6 along navotas coastal dike
Flood control · 2023 · HALREY CONSTRUCTION INC.
₱231.6MOn-Going · 82%
Construction of floodgates number 3 and number 4 along navotas coastal dike
Flood control · 2023 · KAEL CONSTRUCTION AND SUPPLY / PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP.
₱328.1MOn-Going · 81%
Construction of two (2) pumping station along navotas coastal dike (phase 6)
Flood control · 2023 · MSB VITUG CONSTRUCTION INC.
₱250.9MOn-Going · 100%
Construction of open canal along navotas coastal dike
Flood control · 2023 · MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP.
₱115.8MCompleted · 100%
Construction of four (4) storey, Twenty (20) classroom school building, Wawa elementary school, Navotas city (phase 1)
Schools · 2023 · P7 BUILDERS INC.
₱30.0MCompleted · 100%
Construction of four (4) storey, Twelve (12) classroom school building, Tanza elementary school
Schools · 2023 · B. BERNARDO CONST., INC.
₱33.0MCompleted · 100%
Construction of four (4) storey, Eight (8) classroom school building, Kaunlaran high school
Schools · 2023 · TWO DIMENSION CONSTRUCTION
₱4.0MCompleted · 100%
Construction of four (4) storey, Twelve (12) classroom school building, Dagat-dagatan elementary school
Schools · 2023 · C.B. TAMPENGCO CONSTRUCTION & SUPPLY
₱3.0MCompleted · 100%
Construction of four (4) storey, Eight (8) classroom school building, San rafael village elementary school
Schools · 2023 · MRB11 CONSTRUCTION CORPORATION
₱22.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M