National projects
478projects
₱13.94Bin all
45ongoing
3slow
- Flood control ₱8.57B
- Buildings ₱2.34B
- Schools ₱1.15B
- Roads and bridges ₱1.05B
- Other ₱816.3M
- Water ₱19.3M
Showing 151 to 180 of 478
Construction of four (4) storey, Eight (8) classroom school building, Navotas national high school
Schools · 2023 · TM ABAD CONSTRUCTION CORP.
₱982KOn-Going · 10%Slow
Construction of four (4) storey, Eight (8) classroom school building, San roque elementary school
Schools · 2023 · TM ABAD CONSTRUCTION CORP.
₱22.0MCompleted · 100%
Construction of four (4) storey, Eight (8) classroom school building, Daanghari elementary school
Schools · 2023 · TM ABAD CONSTRUCTION CORP.
₱2.0MCompleted · 100%
Construction of four (4) storey, Twelve (12) classroom school building, Tangos i elementary school
Schools · 2023 · JUSTBILT BUILDERS
₱13.0MCompleted · 100%
Construction of four (4) storey, Twelve (12) classroom school building, North bay boulevard elementary school
Schools · 2023 · EIRISH BUILDERS & SUPPLY INC.
₱12.7MCompleted · 100%
Construction of multi-purpose building, Brgy. san roque
Buildings · 2023 · TWO DIMENSION CONSTRUCTION
₱6.9MCompleted · 100%
Construction of navotas polytechnic college (npc) building (phase 4)
Buildings · 2023 · MRB11 CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of multi-purpose bldg. (convention, Sports and disaster center) phase 9, Brgy. bagumbayan south
Buildings · 2023 · MRB11 CONSTRUCTION CORPORATION
₱94.5MCompleted · 100%
Construction of multi-purpose building, (tangos elementary school) in navotas city
Schools · 2023 · JUSTBILT BUILDERS
₱19.8MCompleted · 100%
Construction of multi-purpose building, (daanghari elementary school) in navotas city
Schools · 2023 · TM ABAD CONSTRUCTION CORP.
₱19.8MCompleted · 100%
Construction of kahunari pumping station, Brgy. san jose
Flood control · 2023 · AYANA CONSTRUCTION AND TRADING
₱23.5MCompleted · 100%
Construction of sagisag pumping station, Brgy. tanza 1
Flood control · 2023 · 5-1 CONSTRUCTION CORPORATION
₱24.7MCompleted · 100%
Construction of yangco pumping station, Brgy. navotas east
Flood control · 2023 · EMICA BUILDERS AND SUPPLY
₱24.7MCompleted · 100%
Construction of box culvert (from gov. pascual to judge roldan) san roque
Flood control · 2023 · EARTHWORK BUILDERS, INC.
₱17.8MCompleted · 100%
Construction of takino pumping station, Bangkulasi
Flood control · 2023 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱19.8MCompleted · 100%
Construction of riverwalls along tangos river, Navotas city (phase 1)
Flood control · 2023 · TOPNOTCH CATALYST BUILDERS INC.
₱49.5MCompleted · 100%
Construction of box culvert oliveros to, J. pascual buenaventura, Tangos north
Flood control · 2023 · 721 BUILDERS CORPORATION
₱21.8MCompleted · 100%
Construction of tanza pumping station no. 3, Tanza 2
Flood control · 2023 · 816 EMBER CONSTRUCTION CORPORATION
₱19.8MCompleted · 100%
Rehabilitation of riverwall along tangos river (phase 9)
Flood control · 2023 · TOPNOTCH CATALYST BUILDERS INC.
₱19.8MCompleted · 100%
Construction of martiniko pumping station, (boundary of navotas and malabon), Nbbs dagat-dagatan
Flood control · 2023 · EMICA BUILDERS AND SUPPLY
₱19.8MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 2)
Flood control · 2023 · AZUL BUILDERS
₱62.7MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 3)
Flood control · 2023 · DMLC BUILDERS
₱62.7MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 4)
Flood control · 2023 · A.L. SALAZAR CONSTRUCTION, INC. / ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP.
₱62.7MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 5)
Flood control · 2023 · MEGAY CONSTRUCTION INC.
₱62.7MCompleted · 100%
Construction of flood mitigation structure along tanza river and malabon-navotas river, Malabon city (phase 1)
Flood control · 2023 · AZUL BUILDERS
₱62.7MCompleted · 100%
Construction of kanduli pumping station, Brgy. nbbs kaunlaran
Flood control · 2023 · 721 BUILDERS CORPORATION
₱23.3MCompleted · 100%
Construction of milflores pumping station, Brgy. tanza 2
Flood control · 2023 · 5-1 CONSTRUCTION CORPORATION
₱23.3MCompleted · 100%
Construction of site 8 (mamale 2) pumping station, Brgy. nbbs dagat-dagatan
Flood control · 2023 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱23.3MCompleted · 100%
Construction of b. caseñas pumping station, Brgy. tangos north
Flood control · 2023 · BLACK HARDHAT INC.
₱22.6MCompleted · 100%
Construction of maliputo pumping station, Brgy. nbbs dagat-dagatan
Flood control · 2023 · EARTHWORK BUILDERS, INC.
₱23.3MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TWO DIMENSION CONSTRUCTION27 projects · ₱389.8M
2
MRB11 CONSTRUCTION CORPORATION26 projects · ₱1.24B
3
TM ABAD CONSTRUCTION CORP.24 projects · ₱251.0M
4
EARTHWORK BUILDERS, INC.19 projects · ₱254.8M
5
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS17 projects · ₱552.5M