Official seal of Taguig City

Taguig City: Government

City in Metro Manila, Luzon · 38 barangays

National projects

Built by DPWH in Taguig City since 2016.

984projects
₱50.74Bin all
148ongoing
24slow
  • Buildings ₱26.04B
  • Flood control ₱14.06B
  • Roads and bridges ₱8.12B
  • Other ₱1.60B
  • Schools ₱917.2M

Showing 331 to 360 of 984

₱9.5MCompleted · 100%
Improvement of road, Philippine marine corps headquarters, Fort bonifacio Roads and bridges · 2023 · TUCHAR CONSTRUCTION CORP.
₱4.7MCompleted · 100%
Construction of multi-purpose government center, Brgy. lower bicutan Buildings · 2023 · C.B. GARAY PHILWIDE BUILDERS
₱102.0MOn-Going · 1%Slow
Construction of multi-purpose building, Brgy. calzada tipas Buildings · 2023 · C.B. GARAY PHILWIDE BUILDERS
₱95.3MOn-Going · 71%
₱4.9MCompleted · 100%
Construction of drainage outfall including laterals at barangay ususan Roads and bridges · 2023 · TWENTYSIX CONSTRUCTION INC.
₱27.9MCompleted · 100%
Construction of drainage system and slope protection along ususan river Roads and bridges · 2023 · TWENTYSIX CONSTRUCTION INC.
₱27.9MOn-Going · 100%
₱27.4MCompleted · 100%
₱21.6MCompleted · 100%
₱102.3MCompleted · 100%
Construction of multi-purpose building government center at lower bicutan Buildings · 2022 · C.B. GARAY PHILWIDE BUILDERS
₱45.6MOn-Going · 1%Slow
Upgrading of tapayan pumping station Flood control · 2022 · A.M. ORETA & CO., INC. / E. F. CHUA CONSTRUCTION, INC.
₱389.3MCompleted · 100%
Upgrading of taguig pumping station Other · 2022 · EQUI-PARCO CONSTRUCTION COMPANY / NORTHERN BUILDERS
₱144.7MCompleted · 100%
Construction of special action force headquarters building, Camp bagong diwa, Bicutan Buildings · 2022 · QUATRIX CONSTRUCTION AND SUPPLY INC.
₱19.3MCompleted · 100%
Construction of 5-storey southern police district, Spd quartering facility Buildings · 2022 · C.S. GARCIA CONSTRUCTION CORPORATION
₱87.5MCompleted · 100%
₱9.5MCompleted · 100%
₱47.5MCompleted · 100%
₱19.4MCompleted · 100%
Construction of slope protection along taguig river, Facing downstream (east bank), Package 5 Flood control · 2022 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱96.5MCompleted · 100%
Rehabilitation of elisco road at brgy. ibayo-tipas Roads and bridges · 2022 · ZYRE TRADING AND CONSTRUCTION
₱9.3MCompleted · 100%
Construction of laguna lake highway extension (phase 4) Roads and bridges · 2022 · NORTHERN BUILDERS
₱144.7MCompleted · 100%
Construction of laguna lake highway extension (phase 3) Roads and bridges · 2022 · NORTHERN BUILDERS
₱144.7MCompleted · 100%
₱86.8MCompleted · 100%
Construction of laguna lake highway extension (phase 5) Roads and bridges · 2022 · NORTHERN BUILDERS
₱144.7MCompleted · 100%
Construction of slope protection along taguig river, Facing downstream (west bank), Package 6 Flood control · 2022 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱96.5MCompleted · 100%
Construction of slope protection along taguig river, Facing downstream (west bank), Package 5 Flood control · 2022 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱94.2MCompleted · 100%
Construction of enlisted personnel barracks (building 1), Fort bonifacio Buildings · 2022 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱84.2MCompleted · 100%
Improvement of road, Philippine marine corps headquarters, Fort bonifacio Roads and bridges · 2022 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱22.2MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Taguig City since 2016.

1
HONY TRADING & CONSTRUCTION61 projects · ₱1.49B
2
DAHL CONSTRUCTION CORP.52 projects · ₱2.68B
3
FRANZCOR TRADING & CONSTRUCTION52 projects · ₱946.8M
4
B. VALENCERINA TRADING & CONSTRUCTION36 projects · ₱317.9M
5
TUCHAR CONSTRUCTION CORP.29 projects · ₱764.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →