City in Metro Manila, Luzon · 38 barangays

National projects

Built by DPWH in Taguig City since 2016.

984projects
₱50.74Bin all
148ongoing
24slow
  • Buildings ₱26.04B
  • Flood control ₱14.06B
  • Roads and bridges ₱8.12B
  • Other ₱1.60B
  • Schools ₱917.2M

Showing 1 to 30 of 984

₱46.9MOn-Going · 1%
Construction of a multi-purpose building (d) with sitedevelopment, Brgy. lower bicutan Buildings · 2025 · SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.
₱48.4MOn-Going · 1%
Construction of a multi-purpose building (c) with sitedevelopment, Brgy. lower bicutan Buildings · 2025 · SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.
₱48.4MOn-Going · 1%
₱9.5MOn-Going · 0%
₱14.2MOn-Going · 0%
₱48.5MOn-Going · 0%
Construction of multi-purpose building, Nrcpo, Camp bagong diwa Buildings · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱29.1MOn-Going · 0%
Construction of multi-purpose building, Hqs, Air, Legaspi compound, Fort andres bonifacio, Phase iii Buildings · 2025 · ARCEGA ACUZAR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱18.9MOn-Going · 76%
Construction of multi-purpose facilities at lakeshore, Barangay lower bicutan, Taguig city (phase 2) Buildings · 2025 · GR FEVIDAL CONSTRUCTION DEVELOPERS CORPORATION
₱48.5MOn-Going · 1%
Construction of multi-purpose facilities at lakeshore, Barangay lower bicutan, Taguig city (phase 4) Buildings · 2025 · GR FEVIDAL CONSTRUCTION DEVELOPERS CORPORATION
₱48.5MOn-Going · 1%
Construction of multi-purpose facilities at lakeshore, Barangay lower bicutan, Taguig city (phase 3) Buildings · 2025 · GR FEVIDAL CONSTRUCTION DEVELOPERS CORPORATION
₱48.5MOn-Going · 1%
Construction of multi-purpose facilities at lakeshore, Barangay lower bicutan, Taguig city (phase 5) Buildings · 2025 · GR FEVIDAL CONSTRUCTION DEVELOPERS CORPORATION
₱72.7MOn-Going · 1%
Construction of multi-purpose facilities at lakeshore, Barangay lower bicutan, Taguig city (phase 1) Buildings · 2025 · GR FEVIDAL CONSTRUCTION DEVELOPERS CORPORATION
₱48.5MOn-Going · 1%
₱48.5MOn-Going · 0%
₱24.2MOn-Going · 0%
Improvement of laguna lakeshore area, Barangay lower bicutan, Taguig city (phase i) Other · 2025 · CORE CHECK CONSTRUCTION INC. / TOPNOTCH CATALYST BUILDERS INC.
₱94.0MOn-Going · 88%
Improvement of laguna lakeshore area, Barangay lower bicutan, Taguig city (phase ii) Other · 2025 · CORE CHECK CONSTRUCTION INC. / TOPNOTCH CATALYST BUILDERS INC.
₱94.1MOn-Going · 86%
₱28.3MOn-Going · 0%
₱14.6MOn-Going · 49%
Construction of dost north compound perimeter road within the dost bicutan compound Roads and bridges · 2025 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱0Terminated · 0%
₱140.4MOn-Going · 33%
Construction of multi-purpose building, Barangay lower bicutan, Taguig city (phase 3) Buildings · 2025 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. / ZYRE TRADING AND CONSTRUCTION
₱8.2MTerminated · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Taguig City since 2016.

1
HONY TRADING & CONSTRUCTION61 projects · ₱1.49B
2
DAHL CONSTRUCTION CORP.52 projects · ₱2.68B
3
FRANZCOR TRADING & CONSTRUCTION52 projects · ₱946.8M
4
B. VALENCERINA TRADING & CONSTRUCTION36 projects · ₱317.9M
5
TUCHAR CONSTRUCTION CORP.29 projects · ₱764.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →