National projects
984projects
₱50.74Bin all
148ongoing
25slow
- Buildings ₱26.04B
- Flood control ₱14.06B
- Roads and bridges ₱8.12B
- Other ₱1.60B
- Schools ₱917.2M
Showing 901 to 930 of 984
Construction of box culvert along bicutan creek
Flood control · 2016 · HONY TRADING & CONSTRUCTION
₱17.4MCompleted · 100%
Construction/completion of multi-purpose building and site development, Bagumbayan, 1st ld
Buildings · 2016 · C.S. GARCIA CONSTRUCTION CORPORATION
₱9.3MCompleted · 100%
Construction/rehabilitation of multi-purpose bldg. at barangay north signal, 2nd ld
Buildings · 2016 · B. VALENCERINA TRADING & CONSTRUCTION
₱1.9MCompleted · 100%
Construction/rehabilitation of multi-purpose bldg. at brgy. south signal, 2nd ld
Buildings · 2016 · PERSAN CONSTRUCTION, INC.
₱1.9MCompleted · 100%
Construction of slope protection and desilting of diego silang creek, Brgy. western bicutan
Flood control · 2016 · RED MATRIX BUILDERS AND TRADING / TUCHAR CONSTRUCTION CORP.
₱17.4MCompleted · 100%
Construction of roads at mastrili street, Brgy. bambang
Flood control · 2016 · FRANZCOR TRADING & CONSTRUCTION
₱2.7MCompleted · 100%
Rehabilitation of drainage system along pasong tamo extension
Flood control · 2016 · MRB11 CONSTRUCTION CORPORATION
₱17.4MCompleted · 100%
Repair of potholes and asphalt overlay of reapir the road network inside the compound of dost complex, Gen. santos avenue, Bicutan
Roads and bridges · 2016 · B. BERNARDO CONST., INC.
₱13.5MCompleted · 100%
Rehabilitation of slope protection and desilting of western bicutan creek
Flood control · 2016 · L.M.G. CONSTRUCTION INCORPORATED
₱17.4MCompleted · 100%
Rehabilitation of drainage system along gen. santos avenue
Flood control · 2016 · MRB11 CONSTRUCTION CORPORATION
₱17.4MCompleted · 100%
Rehabilitation of libis creek drainage outfall
Flood control · 2016 · MRB11 CONSTRUCTION CORPORATION
₱17.4MCompleted · 100%
Rehabilitation/improvement of drainage system along bayani road (mrt road) brgy. central signal
Flood control · 2016 · MRB11 CONSTRUCTION CORPORATION
₱17.4MCompleted · 100%
Construction of box culvert pinagsama creek outfall
Flood control · 2016 · B. BERNARDO CONST., INC.
₱17.4MCompleted · 100%
Construction of box culvert along rogan creek outfall, Brgy. maharlika
Flood control · 2016 · HONY TRADING & CONSTRUCTION
₱17.4MCompleted · 100%
Construction of box culvert and rehabilitation of rogan creek, Brgy. maharlika
Flood control · 2016 · VERZONTAL INFRASTRUCTURE CORPORATION
₱17.4MCompleted · 100%
Construction of box culvert along pendatum creek outfall
Flood control · 2016 · B. BERNARDO CONST., INC.
₱17.4MCompleted · 100%
Rehabilitation/reconstruction/upgrading of damaged paved national road along libingan ng mga bayani road, Chainage 0 -chainage 147 to k0013+073 to k0013+237
Roads and bridges · 2016 · HONY TRADING & CONSTRUCTION
₱5.4MCompleted · 100%
Construction of slope protection including drainage laterals along mascardo creek afpovai, Brgy. western bicutan
Flood control · 2016 · L.M.G. CONSTRUCTION INCORPORATED
₱13.0MCompleted · 100%
Construction of box culvert hagonoy creek outfall, Barangay north signal
Flood control · 2016 · L.M.G. CONSTRUCTION INCORPORATED
₱17.4MCompleted · 100%
Rehabilitation of slope protection along philippine navy creek (phase ii), Brgy. western bicutan
Flood control · 2016 · TUCHAR CONSTRUCTION CORP.
₱17.4MCompleted · 100%
Construction of box culvert and rehabilitation of drainage system along c-5 service road, (southbound), Brgy. pinagsama
Flood control · 2016 · L.M.G. CONSTRUCTION INCORPORATED
₱17.4MCompleted · 100%
Construction of slope protection along labasan pumping station open channel, Brgy. ibayo tipas
Flood control · 2016 · DAHL CONSTRUCTION CORP.
₱17.4MCompleted · 100%
Construction of box culvert conga creek outfall, Brgy. katuparan
Flood control · 2016 · HONY TRADING & CONSTRUCTION
₱17.4MCompleted · 100%
Construction of box culvert along c-5/mrt road outfall, Brgy. central signal
Flood control · 2016 · HONY TRADING & CONSTRUCTION
₱17.4MCompleted · 100%
Construction of roads and drainage system, Ka pepe st., Ka peter and ka terio sts., Brgy. palingon
Roads and bridges · 2016 · FRANZCOR TRADING & CONSTRUCTION
₱4.3MCompleted · 100%
Construction of slope protection along calzada river
Flood control · 2016 · GREENWALL CONSTRUCTION
₱8.7MCompleted · 100%
Rehabilitation and construction of slope protection along hagonoy creek
Flood control · 2016 · L.M.G. CONSTRUCTION INCORPORATED
₱17.4MCompleted · 100%
Construction of slope protection along c-6 open channel brgy. lower bicutan
Flood control · 2016 · NORTHERN BUILDERS
₱17.4MCompleted · 100%
Construction of slope protection along taguig pumping station open channel
Flood control · 2016 · DAHL CONSTRUCTION CORP.
₱17.4MCompleted · 100%
Completion of slope protection and desilting of sapang malaki creek, Brgy. ususan
Flood control · 2016 · NORTHERN BUILDERS
₱17.4MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
HONY TRADING & CONSTRUCTION61 projects · ₱1.49B
2
DAHL CONSTRUCTION CORP.52 projects · ₱2.68B
3
FRANZCOR TRADING & CONSTRUCTION52 projects · ₱946.8M
4
B. VALENCERINA TRADING & CONSTRUCTION36 projects · ₱317.9M
5
TUCHAR CONSTRUCTION CORP.29 projects · ₱764.1M