National projects
1201projects
₱27.01Bin all
73ongoing
5slow
- Roads and bridges ₱15.04B
- Flood control ₱8.18B
- Schools ₱2.28B
- Buildings ₱1.21B
- Water ₱199.9M
- Other ₱102.6M
Showing 301 to 330 of 1,052
Construction of multi-purpose building at brgy. san jose, Pres. quirino
Buildings · Sultan Kudarat · 2020 · NIRVANA CONSTRUCTION & SUPPLIES
₱3.0MCompleted · 100%
Improvement of multi-purpose building, Sen. ninoy aquino municipal site, Brgy. poblacion kulaman sen. ninoy aquino
Buildings · Sultan Kudarat · 2020 · CS CONST. AND SUPPLY INC.
₱3.0MCompleted · 100%
Concreting of local road from crossing barte to detachment tubon, Pigcawayan
Roads and bridges · Cotabato City · 2020 · ACJ CONSTRUCTION RESOURCES
₱1.9MCompleted · 100%
Concreting of local road from anick elementary school to national highway, Anick, Pigcawayan
Schools · Cotabato City · 2020 · ACJ CONSTRUCTION RESOURCES
₱1.9MCompleted · 100%
Construction of sultan kudarat (nuling) sports complex, Brgy. dalumangcob, Maguindanao
Other · Sultan Kudarat · 2020 · HMI ENTERPRISES / RCDG CONSTRUCTION CORPORATION
₱24.7MCompleted · 100%
Concreting of access road from junction of kalanganan mother to west circumferential
Roads and bridges · Cotabato City · 2020 · MASH BUILDER'S AND CONSTRUCTION
₱4.9MCompleted · 100%
Construction/concreting of narra-katidtuan road, Brgy. narra, Maguindanao
Roads and bridges · Sultan Kudarat · 2020 · CANTILEVER CONSTRUCTION
₱9.9MCompleted · 100%
Construction of pigcalangan-todok palao road, Brgy. pigcalangan, Maguindanao
Roads and bridges · Sultan Kudarat · 2020 · CONFIACON CONSTRUCTION AND ENGINEERING / MUST ENTERPRISES
₱48.2MCompleted · 100%
Concreting of brgy. bugasan sur fmr, Brgy. bugasan sur, Maguindanao
Roads and bridges · Matanog · 2020 · STONELINE CONSTRUCTION
₱12.4MCompleted · 100%
Concreting of brgy. oring fmr, Brgy. oring, Maguindanao
Roads and bridges · Buldon · 2020 · STONELINE CONSTRUCTION
₱12.4MCompleted · 100%
Construction of 2 storey 4 cl school building at don e. sero elementary school
Schools · Cotabato City · 2020 · MG LEDESMA ENTERPRISES
₱13.6MCompleted · 100%
Construction of two (2) - storey, Six (6) - classrooms school building at esperanza national high school esperanza
Schools · Sultan Kudarat · 2020 · DALANON CONSTRUCTION CORPORATION
₱15.0MCompleted · 100%
Construction of two (2) - storey, Six (6) classrooms school building at keytodac central school lebak
Schools · Sultan Kudarat · 2020 · ALBANOR CONSTRUCTION
₱15.0MCompleted · 100%
Construction of two (2) - storey, Six (6) class rooms school building at ampad-guiabar memorial elementary school lebak
Schools · Sultan Kudarat · 2020 · ROBETH CONST. AND DEV'T. CORP.
₱14.9MCompleted · 100%
Construction of modified one (1) storey three (3) classroom school building with handwashing area both sides and toilet @ each classroom, Malingon e/s, Pres. quirino
Schools · Sultan Kudarat · 2020 · ALPXR CONST. & BLDRS. CORP
₱6.0MCompleted · 100%
Construction/improvement of access roads leading to trades and industries and economic zones, Buayan-lepaga-gaunan road in support to cavendish banana project, Mlang
Roads and bridges · Cotabato City · 2020 · BETTER WORK CONSTRUCTION
₱16.9MCompleted · 100%
Construction/improvement of various infrastructure in support of national security-construction of police station i
Buildings · Cotabato City · 2020 · TRIPLE S CONSTRUCTION
₱10.7MCompleted · 100%
Widening along awang-upi-lebak-kalamansig-palimbang-sarangani road k1918+000 - k1920+996 lebak
Roads and bridges · Sultan Kudarat · 2020 · JV CONSTECH / SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION
₱69.7MCompleted · 100%
Construction of multi-purpose building brgy. tamontaka
Buildings · Cotabato City · 2020 · MG LEDESMA ENTERPRISES
₱2.5MCompleted · 100%
Construction of river bank protection/flood control at limulan river (downstream), Kalamansig, Sultan kudarat kalamansig
Flood control · Sultan Kudarat · 2020 · WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC.
₱28.2MCompleted · 100%
Construction of multi-purpose building at brgy. banawag, Pres. quirino
Buildings · Sultan Kudarat · 2020 · RAQI BUILDER CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of concrete road - road from nhj-brgy. kadi-brgy. bugso-sitio balite- sitio sapale and crossing bugso-landfill in support to agribusiness establishment, Sta. 0001+200-sta. 0003+080, Senator ninoy aquino
Roads and bridges · Sultan Kudarat · 2020 · LEGACY CONSTRUCTION CORPORATION
₱101.2MCompleted · 100%
Construction of flood control (ala river), Esperanza, Sultan kudarat esperanza
Flood control · Sultan Kudarat · 2020 · CURVE-LINE CONSTRUCTION / MUST ENTERPRISES
₱47.5MCompleted · 100%
Construction of flood control simuay bridge, Along cotabato-lanao national road, Maguindanao
Flood control · Sultan Mastura · 2020 · MUST ENTERPRISES
₱69.2MCompleted · 100%
Widening of marigaeg bridge (b00625mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road lebak
Roads and bridges · Sultan Kudarat · 2020 · JV CONSTECH
₱12.9MCompleted · 100%
Rehabilitation/major repair of kanipaan bridge (b00339mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road palimbang
Roads and bridges · Sultan Kudarat · 2020 · CS CONST. AND SUPPLY INC.
₱12.3MCompleted · 100%
Rehabilitation/major repair of wal bridge 1 (b00336mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road palimbang
Roads and bridges · Sultan Kudarat · 2020 · CS CONST. AND SUPPLY INC.
₱7.1MCompleted · 100%
Widening of tipudos bridge (b00626mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road kalamansig
Roads and bridges · Sultan Kudarat · 2020 · JV CONSTECH
₱24.4MCompleted · 100%
Rehabilitation/major repair of wal bridge 2 (b00337mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road palimbang
Roads and bridges · Sultan Kudarat · 2020 · CS CONST. AND SUPPLY INC.
₱7.1MCompleted · 100%
Preventive maintenance of road: concrete reblocking along isulan jct.- ninoy aquino road - k1835+277 - k1835+894 sen. ninoy aquino
Roads and bridges · Sultan Kudarat · 2020 · DALANON CONSTRUCTION CORPORATION
₱5.4MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
BRE CONSTRUCTION79 projects · ₱1.41B
2
CS CONST. AND SUPPLY INC.65 projects · ₱933.5M
3
JARGON CONSTRUCTION & SUPPLY50 projects · ₱1.79B
4
ROBETH CONST. AND DEV'T. CORP.43 projects · ₱323.3M
5
STONELINE CONSTRUCTION40 projects · ₱426.5M