Official seal of Maguindanao del Norte

Maguindanao del Norte: Government

Province in Bangsamoro, Mindanao · 13 towns and cities

National projects

Built by DPWH in Maguindanao del Norte since 2016.

1201projects
₱27.01Bin all
73ongoing
5slow
  • Roads and bridges ₱15.04B
  • Flood control ₱8.18B
  • Schools ₱2.28B
  • Buildings ₱1.21B
  • Water ₱199.9M
  • Other ₱102.6M

Showing 331 to 360 of 1,052

Widening of lower mono bridge (b01269mn) along isulan jct.- ninoy aquino road bagumbayan Roads and bridges · Sultan Kudarat · 2020 · ROBETH CONST. AND DEV'T. CORP.
₱24.6MCompleted · 100%
Widening of davao - cotabato road with exception (km 1716+050-km1724+803.20), Maguindanao Roads and bridges · Sultan Kudarat · 2020 · CONFIACON CONSTRUCTION AND ENGINEERING / MUST ENTERPRISES
₱48.9MCompleted · 100%
Construction of multi purpose building, Brgy. poblacion, Maguindanao Buildings · Datu Odin Sinsuat · 2020 · HARD NINE CONSTRUCTION
₱9.9MCompleted · 100%
Widening of cotabato - lanao road with exception (km 1854+902-km1905+988.40), Maguindanao Roads and bridges · Sultan Kudarat · 2020 · CONFIACON CONSTRUCTION AND ENGINEERING / MUST ENTERPRISES
₱48.9MCompleted · 100%
Construction of multi purpose building, Brgy. nuyo, Maguindanao Buildings · Buldon · 2020 · BARRIST BUILDERS AND CONSTRUCTION SUPPLY
₱2.5MCompleted · 100%
₱48.9MCompleted · 100%
Construction of multi purpose building, Brgy. poblacion, Maguindanao Buildings · Sultan Mastura · 2020 · HARD NINE CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi purpose building, Brgy. niketan, Maguindanao Buildings · Datu Odin Sinsuat · 2020 · HARD NINE CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi purpose building, Brgy. poblacion - dalican, Maguindanao Buildings · Datu Odin Sinsuat · 2020 · HARD NINE CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi purpose building, Brgy. bulalo, Maguindanao Buildings · Sultan Kudarat · 2020 · CANTILEVER CONSTRUCTION
₱2.4MCompleted · 100%
₱48.9MCompleted · 100%
₱48.9MCompleted · 100%
₱49.0MCompleted · 100%
Construction of multi purpose building, Brgy. poblacion, Maguindanao Buildings · Matanog · 2020 · MINROCK MULTI-BUILDERS
₱2.5MCompleted · 100%
Construction of multi purpose building, Brgy. tamontaka i Buildings · Cotabato City · 2020 · BAMEC DEVELOPERS
₱3.0MCompleted · 100%
₱1.7MCompleted · 100%
Construction of multi purpose building, Brgy. lower taviran, Maguindanao Buildings · Kabuntalan · 2020 · BARRIST BUILDERS AND CONSTRUCTION SUPPLY
₱2.5MCompleted · 100%
₱49.0MCompleted · 100%
Construction of multi purpose building, Brgy. balong (e/s), Maguindanao Buildings · Northern Kabuntalan · 2020 · KDP CONSTRUCTION
₱2.5MCompleted · 100%
Access road leading to old city hall-cotabato city information center Roads and bridges · Cotabato City · 2020 · KLD ENGINEERING CONSTRUCTION
₱9.7MCompleted · 100%
₱48.9MCompleted · 100%
Widening of lamsan-simuay junction road (km 1862+9760-km1863+736), Maguindanao Roads and bridges · Sultan Kudarat · 2020 · MUST ENTERPRISES
₱25.1MCompleted · 100%
₱14.1MCompleted · 100%
Construction of multi-purpose building at brgy. south sepaka, Bagumbayan, Sultan kudarat bagumbayan Buildings · Sultan Kudarat · 2020 · FPJ CONSTRUCTION AND SUPPLY
₱1.5MCompleted · 100%
₱28.1MCompleted · 100%
₱41.2MCompleted · 100%
Widening of bagumbayan bridge (b00608mn) along isulan jct. - ninoy aquino road bagumbayan Roads and bridges · Sultan Kudarat · 2020 · FPJ CONSTRUCTION AND SUPPLY
₱20.4MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Maguindanao del Norte since 2016.

1
BRE CONSTRUCTION79 projects · ₱1.41B
2
CS CONST. AND SUPPLY INC.65 projects · ₱933.5M
3
JARGON CONSTRUCTION & SUPPLY50 projects · ₱1.79B
4
ROBETH CONST. AND DEV'T. CORP.43 projects · ₱323.3M
5
STONELINE CONSTRUCTION40 projects · ₱426.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →