Official seal of Maguindanao del Norte

Maguindanao del Norte: Government

Province in Bangsamoro, Mindanao · 13 towns and cities

National projects

Built by DPWH in Maguindanao del Norte since 2016.

1201projects
₱27.01Bin all
73ongoing
5slow
  • Roads and bridges ₱15.04B
  • Flood control ₱8.18B
  • Schools ₱2.28B
  • Buildings ₱1.21B
  • Water ₱199.9M
  • Other ₱102.6M

Showing 31 to 60 of 73

Construction of road, Sta 0+000 - sta 1+200, Barangay solon Roads and bridges · Sultan Mastura · 2024 · MUST ENTERPRISES
₱18.7MOn-Going · 96%
Concreting of road in barangay lepaga, Mlang Roads and bridges · Cotabato City · 2025 · JARGON CONSTRUCTION & SUPPLY
₱9.4MOn-Going · 80%
₱34.8MOn-Going · 30%
₱34.8MOn-Going · 33%
Construction of water system level ii at camp palaw payong, Makabisu Water · Sultan Mastura · 2024 · HDRM CONSTRUCTION
₱9.9MOn-Going · 72%
Paving of unpaved roads - sna - lebak -kalamnsig rd - k1888 + 846 - k1891 + 286, Senator ninoy aquino Roads and bridges · Sultan Kudarat · 2025 · JARGON CONSTRUCTION & SUPPLY
₱197.9MOn-Going · 97%
Construction (completion) of multi-purpose building, Barangay rosary heights xi Buildings · Cotabato City · 2024 · NKU CONSTRUCTION & SUPPLY
₱4.8MOn-Going · 100%
₱18.4MOn-Going · 67%
Preventive maintenance - maharlika highway (cotabato-lanao rd) - k1863 + 000 -k1866 + 040 Roads and bridges · Sultan Kudarat · 2025 · GEMMA CONSTRUCTION SUPPLY, INC.
₱123.2MOn-Going · 100%
Construction of 1-storey dialysis center Buildings · Cotabato City · 2024 · KLD ENGINEERING CONSTRUCTION
₱9.9MOn-Going · 100%
Construction of road, Acacia street and molave street, Sta. 0+000 to sta. 0+300, Brgy. rosary heights xi Roads and bridges · Cotabato City · 2024 · KLD ENGINEERING CONSTRUCTION
₱4.9MOn-Going · 100%
Construction of new super health centers/rhu - kalamansig super health center Buildings · Sultan Kudarat · 2024 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱11.0MOn-Going · 87%
Construction of palma perez-la suerte road from barangay palma perez to barangay la suerte, Mlang Roads and bridges · Cotabato City · 2024 · JOHN RAY DEVELOPER AND SUPPLIES
₱14.4MOn-Going · 0%
Improvement of cotabato-lanao road, Sultan kudarat section (phase 1), K1855+211 -k1855+(-539) Roads and bridges · Sultan Kudarat · 2024 · RNS CONSTRUCTION ENGINEERING
₱39.6MOn-Going · 92%
Construction of multi-purpose building (dormitory) - cotabato state university Buildings · Cotabato City · 2024 · PATE-KHAY CONSTRUCTION
₱29.8MOn-Going · 93%
Construction of multi-purpose building, Poblacion market Buildings · Barira · 2023 · KLD ENGINEERING CONSTRUCTION
₱4.8MOn-Going · 100%
Construction of multi-purpose building, Mindanao state university - maguindanao, Barangay dalican Buildings · Datu Odin Sinsuat · 2024 · ENGSU CONSTRUCTION SUPPLIES
₱14.8MOn-Going · 100%
Construction of multi-purpose building, Brgy. darapanan Buildings · Sultan Kudarat · 2023 · KLD ENGINEERING CONSTRUCTION
₱4.8MOn-Going · 0%
Construction of road, Cotabato-lanao road, K1863+708 - k1865+008 Roads and bridges · Sultan Kudarat · 2024 · ISFB CONSTRUCTION
₱28.7MOn-Going · 31%Slow
Construction of multi-purpose building, Brgy. rh 7 Buildings · Cotabato City · 2024 · NKU CONSTRUCTION & SUPPLY
₱4.8MOn-Going · 47%Slow
Widening - cotabato-lanao rd - k1858+100 - k1858+263, K1858+263 - k1858+353, K1858+353 - k1860+558 Flood control · Sultan Kudarat · 2024 · JDRC CONSTRUCTION & SUPPLIES, CORP.
₱143.3MOn-Going · 68%
₱66.5MOn-Going · 100%
₱66.5MOn-Going · 100%
Construction of riverbank protection (esteros river, Downstream phase iii), Sta. 0+000 - sta. 0+332 Flood control · Cotabato City · 2024 · CORICS CONSTRUCTION / DCD BUILDERS & ENTERPISES
₱46.8MOn-Going · 100%
Construction of riverbank protection (esteros river, Upstream phase iv), Sta. 0+000 -sta. 0+332 Flood control · Cotabato City · 2024 · DCD BUILDERS & ENTERPISES
₱45.3MOn-Going · 90%
Construction of riverbank protection (esteros river, Downstream phase ii), Sta. 0+332 - sta. 0+665 Flood control · Cotabato City · 2024 · CORICS CONSTRUCTION / DCD BUILDERS & ENTERPISES
₱46.9MOn-Going · 100%
Construction of multi-purpose building, Barangay lamen Buildings · Barira · 2024 · NKU CONSTRUCTION & SUPPLY
₱4.9MOn-Going · 100%
₱95.4MOn-Going · 93%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Maguindanao del Norte since 2016.

1
BRE CONSTRUCTION79 projects · ₱1.41B
2
CS CONST. AND SUPPLY INC.65 projects · ₱933.5M
3
JARGON CONSTRUCTION & SUPPLY50 projects · ₱1.79B
4
ROBETH CONST. AND DEV'T. CORP.43 projects · ₱323.3M
5
STONELINE CONSTRUCTION40 projects · ₱426.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →