Official seal of Maguindanao del Norte

Maguindanao del Norte: Government

Province in Bangsamoro, Mindanao · 13 towns and cities

National projects

Built by DPWH in Maguindanao del Norte since 2016.

1201projects
₱27.01Bin all
73ongoing
5slow
  • Roads and bridges ₱15.04B
  • Flood control ₱8.18B
  • Schools ₱2.28B
  • Buildings ₱1.21B
  • Water ₱199.9M
  • Other ₱102.6M

Showing 691 to 720 of 1,201

Widening-kidapawan-allah jct. road, K1670+487-k1671+879, K1673+(-465)-k1674+796., Tacuronf city Roads and bridges · Sultan Kudarat · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱87.1MCompleted · 100%
₱6.2MCompleted · 100%
Const. of river control along ala river (taga section), Tinumiguez, Lamabaong Flood control · Sultan Kudarat · 2018 · C.B. GARAY PHILWIDE BUILDERS
₱46.5MCompleted · 100%
Slope protection works along isulan jct. - sen. ninoy aquino road, K1828+817 - k1828+865 bagumbayan Roads and bridges · Sultan Kudarat · 2018 · PEARL CONSTRUCTION AND SUPPLY
₱4.8MCompleted · 100%
Concreting of brgy. capayuran road, Capayuran, Pigcawayan Roads and bridges · Cotabato City · 2018 · LLABAN CONSTRUCTION & SUPPLY
₱3.7MCompleted · 100%
Paving of unpaved roads-sna-lebak-kalamansig road, K1905+734-k1908+394 Roads and bridges · Sultan Kudarat · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱89.8MCompleted · 100%
Paving of unpaved roads sna-lebak-kalamansig road k1903+404-k1904+690, K1904+721-k1905+185 Roads and bridges · Sultan Kudarat · 2018 · ABU CONSTRUCTION
₱100.5MCompleted · 100%
Widening of permanent bridges-marbel br. (b00261mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas Roads and bridges · Cotabato City · 2018 · ARN BUILDERS, INC. / ROBETH CONST. AND DEV'T. CORP.
₱73.5MCompleted · 100%
₱46.5MCompleted · 100%
Widening along isulan jct. - ninoy aquno road, K1793+000 - k1794+578 bagumbayan Roads and bridges · Sultan Kudarat · 2018 · JANMERC BUILDERS / LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of barangay hall buklod, Senator ninoy aquino Buildings · Sultan Kudarat · 2018 · CS CONST. AND SUPPLY INC.
₱988KCompleted · 100%
Paving of unpaved roads along sna-lebak-kalamansig road, K1905+185 - k1905+686; k1905+695 - k1905+734 kalamansig Roads and bridges · Sultan Kudarat · 2018 · ROBETH CONST. AND DEV'T. CORP.
₱18.0MCompleted · 100%
Const. of multi -purpose building, Poblacion public market, Poblacion banisilan Buildings · Cotabato City · 2018 · SAREX BUILDERS AND SUPPLY
₱1.9MCompleted · 100%
Widening of permanent bridges - magpet br. (b00263mn) along paco-roxas-arakan valley-jct davao-bukidnon rd, Pres. roxas Roads and bridges · Cotabato City · 2018 · CS CONST. AND SUPPLY INC. / ROBETH CONST. AND DEV'T. CORP.
₱38.5MCompleted · 100%
₱21.1MCompleted · 100%
₱18.4MCompleted · 100%
Widening of permanent bridges-binay br. (b00266mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas Roads and bridges · Cotabato City · 2018 · CS CONST. AND SUPPLY INC. / ROBETH CONST. AND DEV'T. CORP.
₱30.8MCompleted · 100%
₱31.1MCompleted · 100%
₱31.9MCompleted · 100%
Construction of barangay hall at brgy. estrella, Pres. quirino Buildings · Sultan Kudarat · 2018 · DALANON CONSTRUCTION CORPORATION
₱2.6MCompleted · 100%
Construction of barangay hall at brgy. malingon, Pres. quirino Buildings · Sultan Kudarat · 2018 · CS CONST. AND SUPPLY INC.
₱2.6MCompleted · 100%
Construction of barangay hall at brgy. bayawa, Pres. quirino Buildings · Sultan Kudarat · 2018 · CS CONST. AND SUPPLY INC.
₱2.6MCompleted · 100%
Const. of multi-purpose building, Pedtad kabacan Buildings · Cotabato City · 2018 · BATUA ENGINEERING SERVICES AND CONSTRUCTION SUPPLY
₱1.9MCompleted · 100%
Const. of multi-purpose building, Carmen nhs, Poblacion carmen Buildings · Cotabato City · 2018 · PLUMBS ENGINEERING AND CONSTRUCTION
₱1.8MCompleted · 100%
Construction of 3 evacuation centers: 1. kiamba, Sarangani 2. cotabato city 3. isulan Buildings · Sultan Kudarat · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱101.6MCompleted · 100%
Completion of school building batch 3 at stand alone shs (tamontaka mother) Schools · Cotabato City · 2017 · BRE CONSTRUCTION
₱28.3MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Maguindanao del Norte since 2016.

1
BRE CONSTRUCTION79 projects · ₱1.41B
2
CS CONST. AND SUPPLY INC.65 projects · ₱933.5M
3
JARGON CONSTRUCTION & SUPPLY50 projects · ₱1.79B
4
ROBETH CONST. AND DEV'T. CORP.43 projects · ₱323.3M
5
STONELINE CONSTRUCTION40 projects · ₱426.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →