Sultan Mastura: Government
Municipality in Maguindanao del Norte, Bangsamoro, Mindanao · 13 barangays
National projects
17projects
₱620.7Min all
5ongoing
1slow
- Roads and bridges ₱525.7M
- Flood control ₱69.2M
- Schools ₱10.4M
- Water ₱9.9M
- Buildings ₱5.5M
Construction of parallel bridge beside tapayan bridge along simuay landasan-parang rd (s01761mn) k1869+061 - k 1869+211 (bridges) ; k186+223 - k 1869+373 (approaches), Maguindanao
Roads and bridges · 2023 · RNS CONSTRUCTION ENGINEERING
₱19.2MOn-Going · 20%Slow
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
MUST ENTERPRISES5 projects · ₱262.6M
2
HARD NINE CONSTRUCTION2 projects · ₱5.4M
3
ED1SON DEVELOPMENT & CONSTRUCTION INC.1 project · ₱192.9M
4
ARCINUE COMM'L CORPORATION1 project · ₱63.9M
5
AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.1 project · ₱48.1M