Official seal of Maguindanao del Sur

Maguindanao del Sur: Government

Province in Bangsamoro, Mindanao · 24 towns and cities

National projects

Built by DPWH in Maguindanao del Sur since 2016.

329projects
₱6.02Bin all
39ongoing
0slow
  • Roads and bridges ₱3.02B
  • Flood control ₱1.93B
  • Buildings ₱887.9M
  • Schools ₱90.2M
  • Other ₱65.5M
  • Water ₱22.8M

Showing 31 to 39 of 39

Widening marbel-allah valley-cotabato rd - k1814+000 - k1815+000, K1817+940-k1821+682, Maguindanao Roads and bridges · Talayan · 2024 · 4AM CONSTRUCTION / ED1SON DEVELOPMENT & CONSTRUCTION INC.
₱115.8MOn-Going · 100%
Widening - marbel-allah valley-cotabato rd - k1781 + 598 - k1784 + 220, Maguindanao Roads and bridges · Ampatuan · 2024 · H-ROYAL CONSTRUCTION
₱70.3MOn-Going · 100%
Widening - marbel-allah valley-cotabato rd - k1786+232 - k1786+507, Maguindanao Roads and bridges · Datu Abdullah Sangki · 2024 · H-ROYAL CONSTRUCTION
₱9.8MOn-Going · 100%
₱4.9MOn-Going · 100%
Construction of multi-purpose building, Brgy. meta, Maguindanao Buildings · Datu Unsay · 2023 · CANTILEVER CONSTRUCTION
₱14.8MOn-Going · 100%
Construction of multi-purpose building (gymnasium), Barangay poblacion, Maguindanao Buildings · Shariff Aguak · 2023 · RAAFS CONSTRUCTION AND SUPPLY
₱4.8MOn-Going · 100%
₱6.5MOn-Going · 100%
Construction of multi-purpose building (covered court), Brgy. masigay, Maguindanao Buildings · Datu Piang · 2023 · CMJ STAR CONSTRUCTION
₱4.8MOn-Going · 100%
Construction of slope protection maslabeng connecting talitay road, Sta. 0+120 sta. 0+584, Maguindanao. Flood control · Buluan · 2022 · A.M AYUNAN CONSTRUCTION / STAD BUILDERS
₱34.5MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in Maguindanao del Sur since 2016.

1
FFJJ CONSTRUCTION28 projects · ₱1.10B
2
BRE CONSTRUCTION22 projects · ₱232.6M
3
TRIPLE S CONSTRUCTION21 projects · ₱109.2M
4
STONELINE CONSTRUCTION20 projects · ₱310.3M
5
H-ROYAL CONSTRUCTION19 projects · ₱339.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →