National projects
102projects
₱3.40Bin all
48ongoing
3slow
- Roads and bridges ₱1.94B
- Buildings ₱1.19B
- Other ₱95.1M
- Flood control ₱71.7M
- Schools ₱55.3M
- Water ₱38.6M
Showing 1 to 30 of 102
Rehabilitation of multi-purpose building
Buildings · Tandubas · 2025 · LVRO CONSTRUCTION & SUPPLY
₱29.7MOn-Going · 0%
Construction of multipurpose hangar with connecting taxiway, Tactical operations squadron (tos), Phase ii
Other · Mapun · 2025 · ALTOS CONSTRUCTION / ATLANTIC ERECTORS, INC.
₱95.1MOn-Going · 0%
Construction of multi-purpose building, Barangay bakaw-bakaw
Buildings · Languyan · 2025 · ELAIRA MARL MS CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building, Barangay tubig dakula
Buildings · Languyan · 2025 · ELAIRA MARL MS CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building, Barangay talisay
Buildings · Sibutu · 2025 · DOMNPHIL CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building, Barangay tanduan
Buildings · Mapun · 2025 · DOMNPHIL CONSTRUCTION
₱7.1MOn-Going · 0%
Construction of multi-purpose building, Tandu banak national high school, Barangay tandu banak
Schools · Sibutu · 2025 · DOMNPHIL CONSTRUCTION
₱9.9MOn-Going · 0%
Construction of multi-purpose building (barangay hall extension facility), Barangay datu baguinda putih
Buildings · Sitangkai · 2025 · DOMNPHIL CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building, Barangay tongsibalo
Buildings · Sibutu · 2025 · DOMNPHIL CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building, Barangay tongehat
Buildings · Sibutu · 2025 · DOMNPHIL CONSTRUCTION
₱4.9MOn-Going · 0%
Construction of multi-purpose building (barangay hall extension facility), Barangay sitangkai poblacion
Buildings · Sitangkai · 2025 · DOMNPHIL CONSTRUCTION
₱9.9MOn-Going · 0%
Construction of 1sty2cl, Lamion walking (main) es
Buildings · Bongao · 2024 · DOMNPHIL CONSTRUCTION
₱5.6MOn-Going · 25%
Construction of 1sty2cl, Datu halun laboratory school
Schools · Bongao · 2024 · DOMNPHIL CONSTRUCTION
₱5.6MOn-Going · 50%
Construction of 1-storey 2-classroom school building in tawi-tawi school of fisheries, Barangay poblacion, Bongao, Campo muslim primary school, Barangay marang-marang, Tabawan stand alone senior high school, Barangay laum t
Schools · Languyan · 2024 · DOMNPHIL CONSTRUCTION
₱39.8MOn-Going · 53%
Construction of one (1) storey military barracks building type 1, Naval air detachment, 2nd marine brigade, Sanga-sanga
Buildings · Bongao · 2024 · DOMNPHIL CONSTRUCTION
₱9.6MOn-Going · 82%
Replacement of permanent weak bridges - suang kagang br. (b00003tw) along bongao - pahut - sanga-sanga national road
Roads and bridges · Bongao · 2024 · ALTOS CONSTRUCTION / VIKING CONSTRUCTION & SUPPLIES
₱38.6MOn-Going · 1%Slow
Construction of road, Siratang-subah mamah
Roads and bridges · Languyan · 2024 · RR-JAM CONSTRUCTION
₱33.7MOn-Going · 96%
Construction of dahiran sali road
Roads and bridges · Languyan · 2024 · RR-JAM CONSTRUCTION
₱19.3MOn-Going · 100%
Construction of road, Subah mamah lower siluan section
Roads and bridges · Languyan · 2024 · MAJDA CONSTRUCTION AND DEVELOPMENT
₱48.2MOn-Going · 73%
Construction of multipurpose hangar with connecting taxiway, Tactical operations squadron (tos)
Buildings · Mapun · 2024 · ATLANTIC ERECTORS, INC.
₱33.8MOn-Going · 27%Slow
Construction of old luna logging road (phase i), Barangay marang - marang
Roads and bridges · Languyan · 2024 · YLL BUILDERS
₱48.2MOn-Going · 100%
Construction of solar water system, Barangay kohek
Water · Sapa-Sapa · 2023 · AL-HUSAYN CONSTRUCTION
₱9.6MOn-Going · 91%
Construction of solar water system, Tumindao
Water · Sitangkai · 2023 · AL-HUSAYN CONSTRUCTION
₱9.6MOn-Going · 91%
Construction of solar water system, Barangay darussalam
Water · Languyan · 2023 · AL-HUSAYN CONSTRUCTION
₱9.6MOn-Going · 91%
Construction of solar water system, Barangay dalo-dalo
Water · Sapa-Sapa · 2023 · AL-HUSAYN CONSTRUCTION
₱9.6MOn-Going · 91%
Construction of new provincial government capitol building, Karungdung
Buildings · Bongao · 2023 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱240.8MOn-Going · 80%
Construction of multi-purpose building, Brgy. kohek
Buildings · Sapa-Sapa · 2023 · KIM JOAN CONSTRUCTION
₱29.7MOn-Going · 82%
Construction of multi-purpose building (cultural center), Brgy. poblacion
Buildings · Sitangkai · 2023 · JUL-CYZA CONSTRUCTION
₱11.6MOn-Going · 90%
Construction of connecting taxiway, Tactical operations squadron
Buildings · Sibutu · 2023 · MHADYNNE CONSTRUCTION
₱8.7MOn-Going · 100%
Construction of multi-purpose building (covered court), Barangay likud dampong
Buildings · South Ubian · 2023 · ELAIRA MARL MS CONSTRUCTION
₱4.8MOn-Going · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
M. ABUBAKAR CONST. AND ENGINEERING, INC.14 projects · ₱738.1M
2
DOMNPHIL CONSTRUCTION11 projects · ₱107.3M
3
GSH CONSTRUCTION6 projects · ₱117.6M
4
ELAIRA MARL MS CONSTRUCTION6 projects · ₱38.8M
5
AL-HUSAYN CONSTRUCTION5 projects · ₱86.7M