Basilisa: Government

Municipality in Dinagat Islands, Caraga, Mindanao · 27 barangays

National projects

Built by DPWH in Basilisa since 2016.

177projects
₱2.37Bin all
19ongoing
1slow
  • Roads and bridges ₱1.54B
  • Buildings ₱442.3M
  • Schools ₱203.3M
  • Flood control ₱141.2M
  • Other ₱31.9M
  • Water ₱9.5M

Showing 1 to 30 of 177

₱9.9MOn-Going · 1%
Construction of multi-purpose building (barangay hall), Barangay coring Buildings · 2026 · EJOB CONSTRUCTION AND SUPPLY, OPC
₱9.9MOn-Going · 1%
Construction of multi-purpose building, Barangay cortes Buildings · 2025 · ZI 9 BUILDERS AND SUPPLIES
₱4.9MCompleted · 100%
₱4.9MCompleted · 100%
₱57.2MOn-Going · 91%
Concreting of sering to roma fmr Flood control · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱14.9MOn-Going · 91%
₱29.4MOn-Going · 81%
₱14.8MCompleted · 100%
₱1.3MCompleted · 100%
₱1.2MCompleted · 100%
Construction of multi-purpose building (barangay hall), Barangay poblacion (rizal) Buildings · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay roxas Buildings · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MOn-Going · 75%
Construction of multi-purpose building, Barangay puerto princesa Buildings · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MOn-Going · 91%
₱9.8MOn-Going · 100%
₱4.9MCompleted · 100%
Rehabilitation of multi-purpose building (covered court), Barangay columbus Buildings · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MOn-Going · 63%
Construction of multi-purpose building, Barangay columbus Buildings · 2025 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MOn-Going · 92%
Concreting of road from purok 8 to purok 10, Barangay tag-abaca Roads and bridges · 2024 · HEAVY JOHN ENGINEERING CONSULTANCY
₱9.7MCompleted · 100%
Construction of multi-purpose building (gymnasium), Brgy. sering Buildings · 2024 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MCompleted · 100%
Rehabilitation of multi-purpose building at purok-9, Barangay rita glenda Buildings · 2024 · HEAVY JOHN ENGINEERING CONSULTANCY
₱4.9MCompleted · 100%
Construction of flood control structure at tag-iho bridge, Tag-abaca Flood control · 2024 · CARTESIAN BUILDERS CORPORATION
₱57.2MCompleted · 100%
₱4.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Basilisa since 2016.

1
HEAVY JOHN ENGINEERING CONSULTANCY19 projects · ₱95.5M
2
CARTESIAN BUILDERS CORPORATION12 projects · ₱409.6M
3
RADIAN CONSTRUCTION AND SUPPLY12 projects · ₱77.6M
4
GEVANS CONSTRUCTION AND SUPPLY10 projects · ₱30.8M
5
ALGAMON CONSTRUCTION CORPORATION7 projects · ₱67.9M