National projects
274projects
₱10.06Bin all
54ongoing
2slow
- Roads and bridges ₱5.40B
- Flood control ₱3.25B
- Buildings ₱791.6M
- Other ₱366.5M
- Schools ₱231.7M
- Water ₱13.3M
Showing 1 to 30 of 218
Mangalcal br. (b01963mn) along saturnino r. silva rd
Other · 2026 · RITZ BUILDERS CONSTRUCTION INC.
₱6.7MCompleted · 100%
Concreting of road in barangay ising
Roads and bridges · 2025 · OFC CONSTRUCTION
₱4.9MCompleted · 100%
Construction of multi-purpose building in barangay tibulao
Buildings · 2025 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
Construction of rainwater collector system (rwcs)
Water · 2025 · CJEP BUILDERS AND ENGINEERING SERVICES
₱2.6MCompleted · 100%
Construction of flood control mitigation structure at sadpudon creek phase 3
Flood control · 2025 · KANAWAY BUILDERS CORPORATION
₱144.8MCompleted · 100%
Construction of flood control mitigation structure at sadpudon creek phase 2
Flood control · 2025 · KANAWAY BUILDERS CORPORATION
₱144.8MCompleted · 100%
Construction of rainwater collector system (rcws) 1. casuga new maligaya elementary school, Brgy. ising, Davao del norte 2. anibongan elementary school, Brgy. anibongan, Davao del norte 3. tuganay elementary school, Brgy. tuganay
Schools · 2025 · ZJN DEVELOPMENT CONSTRUCTION & SUPPLY CORPORATION
₱2.6MCompleted · 100%
Construction of protection dike, Libuganon river irrigation system, Mabaus relief drainage
Flood control · 2025 · EACN CONSTRUCTION
₱14.5MCompleted · 100%
Construction (completion) of multi-purpose building (evacuation center), Barangay tubod
Buildings · 2025 · KANAWAY BUILDERS CORPORATION
₱4.0MCompleted · 100%
Construction (completion) of multi-purpose building (barangay hall), Barangay mabaus and barangay lapaz
Buildings · 2025 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱6.9MCompleted · 100%
Construction of multi-purpose building (barangay hall), Barangay new camiling
Buildings · 2025 · MIGHTY BUILDERS & SUPPLY CORPORATION
₱7.8MCompleted · 100%
Guadalupe - lower tuganay road connecting carmen overland transport terminal in support of banana and coconut industries
Roads and bridges · 2025 · GERLIE CONSTRUCTION AND SUPPLY OPC
₱4.7MCompleted · 100%
Locutan br. 1 (b00190mn) along tagum-panabo circum rd
Roads and bridges · 2025 · EACN CONSTRUCTION
₱5.7MCompleted · 100%
Alejal br. (b00023mn) along saturnino r. silva rd.
Roads and bridges · 2025 · EACN CONSTRUCTION
₱995KCompleted · 100%
Basak br. (b00021mn) along saturnino r. silva rd.
Roads and bridges · 2025 · EACN CONSTRUCTION
₱995KCompleted · 100%
Construction of road, Barangay alejal to alemag
Roads and bridges · 2025 · ROIM BUILDERS & CONSTRUCTION SUPPLY
₱48.2MCompleted · 100%
Saturnino r. silva rd - k1474+087 - k1474+657
Other · 2024 · AARJG BUILDERS CORPORATION / ROSBILL CONSTRUCTION AND SUPPLY
₱40.5MCompleted · 100%
Rehabilitation of multi-purpose building, Barangay ising (poblacion)
Buildings · 2024 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱9.8MCompleted · 100%
Construction of rainwater collector system (rwcs) 1. mabaus elementary school, Brgy. mabaus, Davao del norte 2. taba elementary school, Brgy. taba, Davao del norte 3. pinta sabarat elementary school, Brgy. la paz
Schools · 2024 · LLM UNIFIED BUILDERS & TRADING CORP.
₱2.9MCompleted · 100%
Construction of concrete revetment along tuganay river (upstream and downstream of tuganay bridge)
Flood control · 2024 · MAER SUMMIT KONSTRUKT CO.
₱91.5MCompleted · 100%
Construction of multi - purpose building (admin building), Minda
Buildings · 2024 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
Construction of multi - purpose building (congressional building) - phase 2, Barangay ising
Buildings · 2024 · FLOBAR CONSTRUCTION
₱14.8MCompleted · 100%
Construction of multi-purpose building, Brgy. mangalcal
Buildings · 2024 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱7.4MCompleted · 100%
Construction of flood mitigation structure (earthdike) along mangalcal creek both sides
Flood control · 2024 · ANDROMEDA CONSTRUCTION SERVICES AND SUPPLY
₱144.8MCompleted · 100%
Construction of road, Saturnino r. silva road, Davao del norte phase 1
Roads and bridges · 2024 · ROIM BUILDERS & CONSTRUCTION SUPPLY
₱96.2MCompleted · 100%
Construction of multi-purpose building (barangay hall), Barangay mabaus
Buildings · 2024 · AARJG BUILDERS CORPORATION
₱4.9MCompleted · 100%
Construction of flood mitigation structure (river bank protection) along tagum-libuganon river basin, Carmen section protecting guadalupe to mabaus road
Flood control · 2024 · TYER ONE CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Saturnino r. silva rd - k1476+392 - k1478+400
Roads and bridges · 2024 · R.A. PAHATI CONST. & SUPPLY, INC.
₱96.5MCompleted · 100%
Construction of multi-purpose building, Municipal historical site, Barangay ising
Buildings · 2024 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱9.8MCompleted · 100%
Tagum-panabo circum rd - k1511+227 - k1513+000
Roads and bridges · 2024 · NUEDA BUILDERS CONSTRUCTION & SUPPLY INC.
₱96.5MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
LLM UNIFIED BUILDERS & TRADING CORP.22 projects · ₱103.2M
2
MAG CORPORATION17 projects · ₱100.3M
3
TWO DEGREES CONSTRUCTION AND SUPPLY15 projects · ₱123.9M
4
METRO GEAR CONSTRUCTION CORP.13 projects · ₱658.6M
5
GP & H CONSTRUCTION INCORPORATED11 projects · ₱560.3M