Misamis Oriental: Government

Province in Northern Mindanao, Mindanao · 25 towns and cities

National projects

Built by DPWH in Misamis Oriental since 2016.

2969projects
₱87.92Bin all
304ongoing
4slow
  • Roads and bridges ₱52.05B
  • Flood control ₱22.76B
  • Buildings ₱7.58B
  • Schools ₱3.43B
  • Water ₱1.34B
  • Other ₱769.9M

Showing 241 to 270 of 304

Construction of flood control structure along alubijid river, Barangay benigwayan section (package 1) Flood control · Alubijid · 2025 · RED CONSTRUCTION TECHNIK / ROAD EDGE TRADING & DEVELOPMENT SERVICES
₱48.5MOn-Going · 94%
Construction of flood control structure along alubijid river, Barangay benigwayan section (package 2) Flood control · Alubijid · 2025 · RED CONSTRUCTION TECHNIK / ROAD EDGE TRADING & DEVELOPMENT SERVICES
₱48.5MOn-Going · 99%
Construction of protection dike, Altubo-guinotang cis Flood control · Alubijid · 2025 · MIKKIL CONSTRUCTION
₱14.6MOn-Going · 83%
Construction of multi-purpose building, Barangay bobontugan Buildings · Jasaan · 2025 · CAGALAWAN ENTERPRISES INC.
₱4.9MOn-Going · 88%
Construction of road, Barangay betahon Roads and bridges · Lugait · 2025 · CAGALAWAN ENTERPRISES INC.
₱4.9MOn-Going · 100%
Construction of multi-purpose building, Barangay poblacion Buildings · Tagoloan · 2025 · RAM DAAN CONSTRUCTION
₱4.9MOn-Going · 100%
Construction of road, Barangay cabalantian Roads and bridges · Manticao · 2025 · CAGALAWAN ENTERPRISES INC.
₱4.9MOn-Going · 0%
Construction of pedestrian overpass at butuan city - cagayan de oro city- iligan city rd. k1463+000 Roads and bridges · Alubijid · 2025 · CAGALAWAN ENTERPRISES INC.
₱19.6MOn-Going · 73%
Construction of solar power water supply system, Barangay patag Water · Opol · 2025 · BZAR CONSTRUCTION
₱4.9MOn-Going · 98%
Construction of multi-purpose building, Barangay lourdes Buildings · Alubijid · 2025 · CDH BUILDERS, INC.
₱4.9MOn-Going · 96%
Preventive maintenance of road: asphalt overlay sayre highway k1426+(-300) to k1426+574 Roads and bridges · Tagoloan · 2025 · SUPREA PHILS. DEVELOPMENT CORP.
₱19.5MOn-Going · 100%
₱2.0MOn-Going · 100%
₱21.8MOn-Going · 100%
Construction of multi-purpose building, Barangay luyongbonbon Buildings · Opol · 2024 · MLS JC CONSTRUCTION SERVICES
₱143.4MOn-Going · 66%
Construction of government building (phase ii) barangay malanang Buildings · Opol · 2024 · MLS JC CONSTRUCTION SERVICES
₱96.3MOn-Going · 72%
Construction of multi-purpose building, Barangay poblacion Buildings · Opol · 2024 · MLS JC CONSTRUCTION SERVICES
₱98.7MOn-Going · 100%
₱22.6MOn-Going · 0%
₱25.0MOn-Going · 0%
Const. of flood control structure at manticao river (downstream of manticao bridge) manticao Flood control · Manticao · 2023 · EQUI-PARCO CONSTRUCTION COMPANY
₱146.3MOn-Going · 100%
Const. of flood control structure at tagoloan river, Package 7 Flood control · Tagoloan · 2023 · EQUI-PARCO CONSTRUCTION COMPANY
₱118.8MOn-Going · 100%
Northeastern misamis general hospital villanueva Buildings · Villanueva · 2024 · JORVIVS CONSTRUCTION CORPORATION / MIKKIL CONSTRUCTION
₱148.5MOn-Going · 75%
₱39.7MOn-Going · 72%
Const. of white copra rbdo (whole nut building), Pangasihan Buildings · Gingoog City · 2024 · FFJJ CONSTRUCTION
₱37.9MOn-Going · 0%Slow
Construction of drainage system, Package 2 Flood control · Gingoog City · 2024 · VEN RAY CONSTRUCTION CORPORATION
₱124.2MOn-Going · 100%
₱190.6MOn-Going · 100%
₱190.6MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Misamis Oriental since 2016.

1
CAGALAWAN ENTERPRISES372 projects · ₱2.64B
2
EQUI-PARCO CONSTRUCTION COMPANY149 projects · ₱12.84B
3
ALEBON GENUINE MERCHANDISING INCORPORATED141 projects · ₱992.9M
4
WDM CONSTRUCTION AND SUPPLIES102 projects · ₱1.74B
5
JEJOR'S CONSTRUCTION CORPORATION84 projects · ₱6.15B