Official seal of General Santos City

General Santos City: Government

City in Soccsksargen, Mindanao · 26 barangays

Town hall contracts

Construction contracts the town hall of General Santos City awarded and posted on PhilGEPS.

572projects
₱3.77Bin all
  • Buildings ₱1.27B
  • Roads and bridges ₱928.9M
  • Flood control ₱851.6M
  • Other ₱341.2M
  • Schools ₱290.7M
  • Water ₱86.9M
All

Showing 331 to 360 of 572

Concreting at aparente st., Barangay city heights Roads and bridges · 2019 · MGBJ RISING CONSTRUCTION AND LAND DEVELOPER
₱7.1M
Construction of covered court at lagao 2nd barrio elementary school, Barangay san isidro, General santos cit5 Schools · 2019 · LAWRENCE ERIC CONSTRUCTION & ENGINEERING SERVICES
₱3.1M
Concreting at barangay fatima (fil-am road to ofring), Brgy. fatima Roads and bridges · 2019 · MJ TIONGSON CONSTRUCTION
₱5.3M
Construction of floodway along yumang st., (from leon llido st. to sarangani phase 1), Brgy. san isidro Flood control · 2019 · MJ TIONGSON CONSTRUCTION
₱6.2M
19cw-gsc-002 lot1 Other · 2019 · MGBJ RISING CONSTRUCTION AND LAND DEVELOPER
₱9.1M
19cw-gsc-003 lot1 Other · 2019 · MJ TIONGSON CONSTRUCTION
₱2.9M
18cw-gsc-004 lot 1 Other · 2019 · FREDEN CONSTRUCTION
₱2.2M
19cw-gsc-008 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱2.9M
19cw-gsc-007 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱3.9M
19cw-gsc-001 lot 1 Other · 2019 · MGBJ RISING CONSTRUCTION AND LAND DEVELOPER
₱4.0M
19cw-gsc-010 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱4.9M
19cw-gsc-009 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱4.9M
19cw-gsc-006 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱5.1M
19cw-gsc-005 lot1 Other · 2019 · KUPLER INDUSTRIES INCORPORATED
₱10.4M
Construction of water system at katangawan central elementary school, Brgy. katangawan Schools · 2019 · IYADA BUILDERS AND ENTERPRISES
₱1.5M
Construction of 1 storey, 2 classroom school building at banwalan indigenous people (ip) school, Barangay san jose Schools · 2019 · MFN BUILDERS
₱1.9M
Construction of founding mayors landmark Other · 2019 · IYADA BUILDERS AND ENTERPRISES
₱2.8M
18cw-gsc-062 electrification and streetlightings, Hadano to dxcp, National highway Roads and bridges · 2019 · KUPLER INDUSTRIES INCORPORATED
₱5.6M
18cw-gsc-061 buildings-operation of city terminal Buildings · 2019 · FASTRUCT DESIGN AND CONSTRUCTION
₱6.3M
Rehabilitation of water system at purok tribal village, Brgy. siguel Water · 2019 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱330K
Construction of overhead tank and distribution of pipeline, Banisil national high school, Brgy. tambler Schools · 2019 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱869K
Construction of deepwell with overhead tank at purok reformville, Brgy. calumpang general santos city Other · 2019 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱1.5M
Construction of covered court at purok kamasi, Barangay ligaya Buildings · 2019 · A.L. ACHARON CONSTRUCTION AND SUPPLY
₱4.5M
Rehabilitation / improvement of water system at hall of justice, Brgy. lagao Water · 2018 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱873K
Rehabilitation of phase a roofing), Public market, Brgy. dadiangas south Buildings · 2018 · MFN BUILDERS
₱1.9M
Construction of water system at prk. changco ii, Brgy. bawing Water · 2018 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱2.0M
Construction of underground drainage with curb and gutter at mirabueno st., Prk. magsaysay a, Brgy. labangal Flood control · 2018 · IYADA BUILDERS AND ENTERPRISES
₱2.5M
Construction of drainage system along tiongson street, Brgy. lagao Flood control · 2018 · MJ TIONGSON CONSTRUCTION
₱2.0M
Construction of drainage system at tambler, Brgy. tambler Flood control · 2018 · FASTRUCT DESIGN AND CONSTRUCTION
₱1.6M
Concreting of magsaysay avenue to mabini st. going to fil-am highway, Brgy. calumpang Roads and bridges · 2018 · ISULAN ECT CONSTRUCTION & GENERAL MERCHANDISE INC.
₱2.8M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →