Official seal of Sultan Kudarat

Sultan Kudarat: Government

Province in Soccsksargen, Mindanao · 12 towns and cities

National projects

Built by DPWH in Sultan Kudarat since 2016.

1628projects
₱32.59Bin all
109ongoing
1slow
  • Roads and bridges ₱17.68B
  • Flood control ₱9.83B
  • Buildings ₱2.97B
  • Schools ₱1.41B
  • Other ₱466.9M
  • Water ₱234.2M

Showing 361 to 390 of 1,479

₱2.0MCompleted · 100%
Construction (completion) of multipurpose building, Brgy. obial Buildings · Kalamansig · 2023 · ROBETH CONST. AND DEV'T. CORP.
₱2.4MCompleted · 100%
Construction of road at barangay gansing to tambak Roads and bridges · Lambayong · 2023 · SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION
₱4.9MCompleted · 100%
Construction of multipurpose building, Brgy. ilian Buildings · Esperanza · 2023 · CURVE-LINE CONSTRUCTION
₱4.9MCompleted · 100%
₱49.6MCompleted · 100%
Construction of multi-purpose building, Brgy. libua Buildings · Palimbang · 2023 · BULANAN CONSTRUCTION
₱4.9MCompleted · 100%
Construction (completion) of multipurpose building, Milbuk central school Schools · Palimbang · 2023 · BULANAN CONSTRUCTION
₱2.0MCompleted · 100%
Construction of multipurpose building, Brgy. salumping Buildings · Esperanza · 2023 · CURVE-LINE CONSTRUCTION
₱4.9MCompleted · 100%
Rehabilitation of multi-purpose building, Barangay dukay Buildings · Esperanza · 2023 · ALBANOR CONSTRUCTION
₱2.0MCompleted · 100%
₱2.5MCompleted · 100%
Construction of flood control structure along buayan river (sampao section) Flood control · Lutayan · 2023 · ABU CONSTRUCTION
₱97.7MCompleted · 100%
Construction of multi-purpose building, Cor. panes/dapitan st., Kalawag 1 Buildings · Isulan · 2023 · WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC.
₱9.9MCompleted · 100%
Construction of road, Barangay telafas Roads and bridges · Columbio · 2023 · FPJ CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
₱2.3MCompleted · 100%
Construction of river bank protection at barangay santa clara Flood control · Kalamansig · 2023 · AMP 723 CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of local road from new tarlac to villamor proper Roads and bridges · Esperanza · 2023 · ALBANOR CONSTRUCTION
₱4.1MCompleted · 100%
Construction of flood control, Brgy. tran Flood control · Lebak · 2023 · JV CONSTECH
₱5.0MCompleted · 100%
Construction of river bank protection/flood control barangay ala Flood control · Esperanza · 2023 · WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC.
₱49.0MCompleted · 100%
Construction of hanging bridge phase 1 at brgy. kalamongog Roads and bridges · Lebak · 2023 · JV CONSTECH
₱5.4MCompleted · 100%
Construction of flood control, Brgy. kangkong Flood control · Esperanza · 2023 · CURVE-LINE CONSTRUCTION
₱4.6MCompleted · 100%
Construction of flood control, Brgy. tibpuan Flood control · Lebak · 2023 · JV CONSTECH
₱4.4MCompleted · 100%
Construction of flood control, Brgy. poblacion Flood control · Kalamansig · 2023 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱5.0MCompleted · 100%
Construction of flood control structure, Ala river road dike, Package a - phase 3, Sta. 0+000-sta. 0+606 Flood control · Lambayong · 2023 · THREE W BUILDERS, INC. / WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC.
₱115.7MCompleted · 100%
Construction of river bank protection/flood control (downstream side) barangay biwang Flood control · Bagumbayan · 2023 · PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP.
₱44.7MCompleted · 100%
₱144.7MCompleted · 100%
Construction of river bank protection/flood control at limulan river (upstream) Flood control · Kalamansig · 2023 · ALBANOR CONSTRUCTION / MUST ENTERPRISES
₱71.1MCompleted · 100%
Construction (completion) of equipment base shop, Sultan kudarat 2nd deo Buildings · Lebak · 2023 · EQUICON ENGINEERING SERVICES
₱25.2MCompleted · 100%
Construction of multi-purpose building, Barangay poblacion Buildings · Bagumbayan · 2023 · EJC BUILDERS & GENERAL MERCHANDISE
₱4.9MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay butril Buildings · Palimbang · 2023 · BULANAN CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi-purpose building, Barangay pamantingan Buildings · Esperanza · 2023 · ALBANOR CONSTRUCTION
₱4.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Sultan Kudarat since 2016.

1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →