Official seal of Sultan Kudarat

Sultan Kudarat: Government

Province in Soccsksargen, Mindanao · 12 towns and cities

National projects

Built by DPWH in Sultan Kudarat since 2016.

1628projects
₱32.59Bin all
109ongoing
1slow
  • Roads and bridges ₱17.68B
  • Flood control ₱9.83B
  • Buildings ₱2.97B
  • Schools ₱1.41B
  • Other ₱466.9M
  • Water ₱234.2M

Showing 91 to 120 of 1,628

Preventive maintenance - dulawan-marbel rd - k1768 + 571 - k1769 + 071 Other · Tacurong City · 2025 · JARGON CONSTRUCTION & SUPPLY
₱46.8MOn-Going · 100%
Construction of bridge, Maindang to mamali, Maindang bridge Roads and bridges · Lutayan · 2025 · JARGON CONSTRUCTION & SUPPLY
₱93.6MOn-Going · 100%
Construction of multi-purpose building, Brgy. rajah muda Buildings · Tacurong City · 2025 · JARGON CONSTRUCTION & SUPPLY
₱4.8MCompleted · 100%
Construction of riverwall protection projects in brgy. rajah nuda and brgy. paras Flood control · Tacurong City · 2025 · C E K CONSTRUCTION AND WATER SUPPLY
₱4.8MCompleted · 100%
₱58.0MOn-Going · 100%
Construction of multi purpose building (gymnasium), Barangay daguma Buildings · Bagumbayan · 2025 · FOUR S CONSTRUCTION SERVICES
₱6.7MCompleted · 100%
Completion of multi purpose building (ampitheater building), Barangay kalawag ii Buildings · Isulan · 2025 · ROBETH CONST. AND DEV'T. CORP.
₱49.4MOn-Going · 92%
₱145.1MOn-Going · 100%
₱103.5MCompleted · 100%
₱6.2MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay ala Buildings · Esperanza · 2025 · CASTILLANES CONSTRUCTION AND SUPPLY
₱1.8MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay guiamalia Buildings · Esperanza · 2025 · CASTILLANES CONSTRUCTION AND SUPPLY
₱2.4MCompleted · 100%
Rehabilitation of multi-purpose building (gymnasium), Barangay poblacion Buildings · Esperanza · 2025 · CASTILLANES CONSTRUCTION AND SUPPLY
₱4.8MCompleted · 100%
Widening - dulawan - marbel road - k1758 + 524 - k1760 + 404 Roads and bridges · Tacurong City · 2025 · 3ATM CONSTRUCTION SUPPLIES / FPJ CONSTRUCTION AND SUPPLY
₱53.4MOn-Going · 100%
Widening - dulawan - marbel rd - k1766 + 064 - k1766 + 640 Roads and bridges · Tacurong City · 2025 · VYS CONSTRUCTION
₱17.1MCompleted · 100%
Preventive maintenance of road:asphalt overlay - dulawan - marbel rd - k1764 + (-526) - k1764 + 344 Roads and bridges · Tacurong City · 2025 · VICENTE T. LAO CONSTRUCTION
₱98.4MCompleted · 100%
Construction of multi-purpose building (barangay hall) barangay rajah muda Buildings · Tacurong City · 2025 · C E K CONSTRUCTION AND WATER SUPPLY
₱4.9MCompleted · 100%
Construction of pedestrian overpass at kidapawan-allah junction rd - k1677 + 625 Other · Isulan · 2025 · PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP.
₱22.4MCompleted · 100%
Construction of drainage structure along road - kidapawan - allah junction road k1674 + 056 - k1674 + 719 Flood control · Tacurong City · 2025 · FPJ CONSTRUCTION AND SUPPLY
₱20.8MCompleted · 100%
Construction of flood mitigation structure, Ala river, Purok mabuhay, Brgy. bambad Flood control · Isulan · 2025 · CS CONST. AND SUPPLY INC.
₱144.7MCompleted · 100%
Preventive maintenance of road:asphalt overlay - dulawan - marbel rd - k1762 + 433 - k1763 + 418 Roads and bridges · Tacurong City · 2025 · VICENTE T. LAO CONSTRUCTION
₱110.0MCompleted · 100%
₱74.4MCompleted · 100%
Construction of flood mitigation structure-construction of lambayong ris protection dike upstream of dam Flood control · Isulan · 2025 · C.A. BETALAC CONSTRUCTION & GEN. MDSE., INC.
₱14.7MCompleted · 100%
Construction of drainage structure along road - kidapawan-allah junction rd - k1680 + 349 - k1680 + 1629 Flood control · Isulan · 2025 · SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION
₱42.2MCompleted · 100%
Construction (completion) of multi-purpose building (barangay hall), Barangay bannawag Buildings · President Quirino · 2025 · FPJ CONSTRUCTION AND SUPPLY
₱3.0MCompleted · 100%
Construction of flood mitigation structure, Buayan river, Downstream (r/s) Flood control · Lutayan · 2025 · CS CONST. AND SUPPLY INC.
₱96.4MOn-Going · 100%
Construction (completion) of multi-purpose building (mini gym bleachers), Barangay bannawag Buildings · President Quirino · 2025 · FPJ CONSTRUCTION AND SUPPLY
₱3.0MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Sultan Kudarat since 2016.

1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →