Official seal of Sultan Kudarat

Sultan Kudarat: Government

Province in Soccsksargen, Mindanao · 12 towns and cities

National projects

Built by DPWH in Sultan Kudarat since 2016.

1628projects
₱32.59Bin all
109ongoing
1slow
  • Roads and bridges ₱17.68B
  • Flood control ₱9.83B
  • Buildings ₱2.97B
  • Schools ₱1.41B
  • Other ₱466.9M
  • Water ₱234.2M

Showing 1201 to 1230 of 1,479

₱59.0MCompleted · 100%
Construction of concrete road koronadal-lutayan-columbio (lamalis-datalfilak) matanao road, Package a Roads and bridges · Columbio · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱154.3MCompleted · 100%
₱59.5MCompleted · 100%
Construction of river control along river panas - bambad section, S.k., Brgy. bambad Flood control · Isulan · 2018 · JARGON CONSTRUCTION & SUPPLY
₱18.6MCompleted · 100%
Construction of senior citizen building salangsang Buildings · Lebak · 2018 · JV CONSTECH
₱988KCompleted · 100%
Construction of sea wall protection, K0+000 - k0+980 brgy. baranayan Flood control · Palimbang · 2018 · LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of river bank protection/flood control, K0+000 - k0+480 brgy. badiangon Flood control · Palimbang · 2018 · LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of senior citizen building poblacion 2 Buildings · Lebak · 2018 · JV CONSTECH
₱987KCompleted · 100%
Replacement of permanent weak bridge katungal brideg (b00286mn) along kidapawan-allah jct. road ejc montilla Roads and bridges · Tacurong City · 2018 · ARN BUILDERS, INC. / JANMERC BUILDERS
₱46.5MCompleted · 100%
Const. of river control along tinumiguez Flood control · Lambayong · 2018 · CS CONST. AND SUPPLY INC.
₱46.5MCompleted · 100%
Preventive maintenance of road - concrete reblocking kidapawan-allah jct. road, K1678+690 - k1679+257., Sulatan kudarat. Roads and bridges · Isulan · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱8.9MCompleted · 100%
Const. of flood control at buayan river Flood control · Lutayan · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱46.5MCompleted · 100%
Widening-isulan jct. ninoy aquino road, K1778+482 - k1780+983 Roads and bridges · Isulan · 2018 · DALANON CONSTRUCTION CORPORATION
₱50.0MCompleted · 100%
Const. of multi-purpose building at brgy. poblacion Buildings · Lambayong · 2018 · ROBETH CONST. AND DEV'T. CORP.
₱2.8MCompleted · 100%
₱14.5MCompleted · 100%
Const. of flood control at baras Flood control · Tacurong City · 2018 · CS CONST. AND SUPPLY INC.
₱27.9MCompleted · 100%
Const. of river control along kabulakan lambayong Flood control · Lambayong · 2018 · C.B. GARAY PHILWIDE BUILDERS / EINS HANA CONSTRUCTION CORPORATION
₱43.6MCompleted · 100%
Construction of sea wall protection, K0+000 - k0+300 brgy. sta. clara Flood control · Kalamansig · 2018 · CS CONST. AND SUPPLY INC. / JV CONSTECH
₱14.4MCompleted · 100%
Construction of multi-purpose building deped division office at kenram. Buildings · Isulan · 2018 · PEARL CONSTRUCTION AND SUPPLY
₱975KCompleted · 100%
Construction of day care centers sewod Buildings · Sen. Ninoy Aquino · 2018 · CS CONST. AND SUPPLY INC.
₱988KCompleted · 100%
Construction of roads (construction of concrete road), K0+000 - k0+606 poblacion Roads and bridges · Bagumbayan · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱9.6MCompleted · 100%
Construction of senior citizen building gapok Buildings · Sen. Ninoy Aquino · 2018 · CS CONST. AND SUPPLY INC.
₱988KCompleted · 100%
Construction of day care centers maguiales Buildings · Palimbang · 2018 · CS CONST. AND SUPPLY INC.
₱988KCompleted · 100%
Construction of river bank protection/flood control brgy. daladap Flood control · Esperanza · 2018 · C.B. GARAY PHILWIDE BUILDERS / CASTILLANES CONSTRUCTION AND SUPPLY
₱46.4MCompleted · 100%
Construction of barangay hall tacupis Buildings · Sen. Ninoy Aquino · 2018 · CS CONST. AND SUPPLY INC.
₱988KCompleted · 100%
Construction of barangay hall pag-asa Buildings · Kalamansig · 2018 · JV CONSTECH
₱986KCompleted · 100%
Construction of barangay hall christiannuevo Buildings · Lebak · 2018 · JV CONSTECH
₱986KCompleted · 100%
Construction of barangay hall salumping Buildings · Esperanza · 2018 · ALBANOR CONSTRUCTION
₱988KCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Sultan Kudarat since 2016.

1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →