National projects
1628projects
₱32.59Bin all
109ongoing
1slow
- Roads and bridges ₱17.68B
- Flood control ₱9.83B
- Buildings ₱2.97B
- Schools ₱1.41B
- Other ₱466.9M
- Water ₱234.2M
Showing 1291 to 1320 of 1,628
Construction (completion) of gymnasium paitan
Buildings · Esperanza · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱988KCompleted · 100%
Rehabilitation of multi-purpose building poblacion
Buildings · Kalamansig · 2018 · JV CONSTECH
₱979KCompleted · 100%
Construction of road slope protection structure awang- upi-lebak-kalamansig-palimbang-sarangani road, K1925+058-k1925+148, K1925+226-k1925+272; k1966+350-k1966+368, K1966+400-k1966+416; k1966+700-k1966+714, K1966+900-k1966+914, K1967+500-k1967+508, K196
Roads and bridges · Lebak · 2018 · ABU CONSTRUCTION
₱120.9MCompleted · 100%
Paving of unpaved roads sna- lebak-kalamansig rd k1893+686-k1894+726
Roads and bridges · Lebak · 2018 · JANMERC BUILDERS / LEGACY CONSTRUCTION CORPORATION
₱183.1MCompleted · 100%
Construction of drainage canal (including box culvert) along kidapawan-allah jct. road
Flood control · Tacurong City · 2018 · PEARL CONSTRUCTION AND SUPPLY
₱8.4MCompleted · 100%
Construction of drainage canal along dulawan-marbel road
Roads and bridges · Tacurong City · 2018 · LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of drainage canal along kidapawan-allah jct. road, K1677+072 - k1678+030
Roads and bridges · Tacurong City · 2018 · LEGACY CONSTRUCTION CORPORATION
₱13.9MCompleted · 100%
Improvement of tacurong east by-pass road from brgy. san antonio-d'ledesma san pablo connecting to brgy. kalandagan, Sta. 8+840 - sta. 13+154
Roads and bridges · Tacurong City · 2018 · JARGON CONSTRUCTION & SUPPLY
₱43.9MCompleted · 100%
Rehabilitation/major repair of permanent bridge, Marigaeg br. (b00625(mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road
Roads and bridges · Lebak · 2018 · CS CONST. AND SUPPLY INC. / JV CONSTECH
₱9.0MCompleted · 100%
Construction (completion) of multi-purpose building sta. clara
Buildings · Kalamansig · 2018 · JV CONSTECH
₱680KCompleted · 100%
Construction (completion) of gymnasium basak
Buildings · Lebak · 2018 · JV CONSTECH
₱679KCompleted · 100%
Construction (completion) of gymnasium nuling
Buildings · Lebak · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱684KCompleted · 100%
Construction (completion) of gymnasium kalamongog
Buildings · Lebak · 2018 · JV CONSTECH
₱678KCompleted · 100%
Construction (completion) of gymnasium tuka
Buildings · Bagumbayan · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱684KCompleted · 100%
Construction (completion) of gymnasium taguisa
Buildings · Lebak · 2018 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱683KCompleted · 100%
Construction (completion) of gymnasium limulan
Buildings · Kalamansig · 2018 · JV CONSTECH
₱679KCompleted · 100%
Construction (completion) of gymnasium kabulanan
Buildings · Bagumbayan · 2018 · CS CONST. AND SUPPLY INC.
₱670KCompleted · 100%
Construction of rain water collection system (rwcs)
Water · Tacurong City · 2018 · JV CONSTECH
₱3.2MCompleted · 100%
Rehabilitation/major repair of permanent bridges, Kraan br. 1 (b00402mn) along awang-upi-lebak-kalamansig-palimbang-sarangani road
Roads and bridges · Palimbang · 2018 · ABU CONSTRUCTION
₱48.1MCompleted · 100%
Const. of drainage structure along marbel - allah - valley - cotabato road, K1771+000 - k1772+089
Roads and bridges · Isulan · 2018 · BSP & COMPANY, INC.
₱49.4MCompleted · 100%
Widening of sadsalan bridge 2 (b01607mn) along dulawan-marbel road
Roads and bridges · Lambayong · 2018 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱91.2MCompleted · 100%
Construction of access road leading to declared tourism destinations- nrj leading to mangrove ecotourism park, Brgy. taguisa
Roads and bridges · Lebak · 2018 · FFJJ CONSTRUCTION
₱59.0MCompleted · 100%
Construction of concrete road koronadal-lutayan-columbio (lamalis-datalfilak) matanao road, Package a
Roads and bridges · Columbio · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱154.3MCompleted · 100%
Construction of access roads leading to declared tourism destinations nrj to sitio sewal leading to lagbasan cave passing thru burial cave, Brgy. kuden
Roads and bridges · Sen. Ninoy Aquino · 2018 · LEGACY CONSTRUCTION CORPORATION
₱59.5MCompleted · 100%
Construction of river control along river panas - bambad section, S.k., Brgy. bambad
Flood control · Isulan · 2018 · JARGON CONSTRUCTION & SUPPLY
₱18.6MCompleted · 100%
Construction of senior citizen building salangsang
Buildings · Lebak · 2018 · JV CONSTECH
₱988KCompleted · 100%
Construction of sea wall protection, K0+000 - k0+980 brgy. baranayan
Flood control · Palimbang · 2018 · LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of river bank protection/flood control, K0+000 - k0+480 brgy. badiangon
Flood control · Palimbang · 2018 · LEGACY CONSTRUCTION CORPORATION
₱46.5MCompleted · 100%
Construction of senior citizen building poblacion 2
Buildings · Lebak · 2018 · JV CONSTECH
₱987KCompleted · 100%
Widening-kidapawan-allah jct. rd. section 'a'-k1679+500.50 - k1680+070, Section 'b' k1680+127 - k1680+170, Section 'c' k1680+217.5 - k1681+000, Section 'd' k1681+700 - k1682+149, Sectio 'e' k1682+174 - k1682+938.50
Roads and bridges · Isulan · 2018 · JANMERC BUILDERS / LEGACY CONSTRUCTION CORPORATION
₱54.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M