National projects
1628projects
₱32.59Bin all
109ongoing
1slow
- Roads and bridges ₱17.68B
- Flood control ₱9.83B
- Buildings ₱2.97B
- Schools ₱1.41B
- Other ₱466.9M
- Water ₱234.2M
Showing 1441 to 1470 of 1,628
Construction of multi-purpose building @ brgy. el bebe
Buildings · Columbio · 2017 · ANGKAT CONSTRUCTION AND SUPPLIES
₱2.5MCompleted · 100%
Construction of multi-purpose building @ brgy. natividad
Buildings · Columbio · 2017 · JSY CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi-purpose building @ brgy. lilit
Buildings · Lambayong · 2017 · PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP.
₱2.5MCompleted · 100%
Construction of river control (ala river) lambayong, S.k., Brgy. matiompong, K0+000-k0+400
Flood control · Lambayong · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱47.5MCompleted · 100%
Construction of multi-purpose building @ brgy. tina
Buildings · Tacurong City · 2017 · MINROCK MULTI-BUILDERS
₱2.5MCompleted · 100%
Construction of multi-purpose building @ brgy. baras
Buildings · Tacurong City · 2017 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱2.5MCompleted · 100%
Construction of multi-purpose building @ brgy. d'ledesma
Buildings · Tacurong City · 2017 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱2.5MCompleted · 100%
Road opening of davao-columbio-matanao road (sinapulan-colon sabak section) k1678+540-k1679+690
Roads and bridges · Columbio · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱96.4MCompleted · 100%
Improvement/widening of national roads along awang-upi-lebak-kalamansig-palimbang road, Section 1 (k1939+500 - k1940+000) section ii (k1940+998 - k1941+348)
Roads and bridges · Lebak · 2017 · JARGON CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Construction of flood control (ala river basin), K0+000 - k0+380
Flood control · Esperanza · 2017 · ROBETH CONST. AND DEV'T. CORP. / THREE W BUILDERS, INC.
₱36.2MCompleted · 100%
Construction/improvement of access roads leading to airport, Seaports, And declared tourism destination, Access road leading to san roque port, K2032+000 - k2032+492(section 1) k2032+492 - k2032+525 (section 2)
Roads and bridges · Palimbang · 2017 · CS CONST. AND SUPPLY INC.
₱15.4MCompleted · 100%
Upgrading (unpaved to paved) of isulan jct. ninoy aquino road, K1833+775-k1835+277 (chainage 50336-chainage 51875); k1836+538-k1837+000 (chainage 53147-chainage 53678); k1837+739-k1838+263 (chainage 54417-chainage 55013); k1838+710-k1839+060 (chainag
Flood control · Sen. Ninoy Aquino · 2017 · NFH CONSTRUCTION & SUPPLY / SOPHIA GEU CONSTRUCTION AND SUPPLY CORPORATION
₱138.5MCompleted · 100%
Const./upgrading/rehabilitation of drainage along kidapawan-allah jct. road k1673+(-458)-k1673+164
Roads and bridges · Tacurong City · 2017 · THREE W BUILDERS, INC.
₱21.3MCompleted · 100%
Widening of marbel-allah-cotabato road, K1763+(-672)-k1763+010 (chainage 0 - chainage 682), K1764+634-k1767+318 (chainage 2297-chainage4975), K1771+300-k1772+815 (chainage 3907-chainage 5424), K1768+(-499)-k1770+851 (chainage 82-chainage 3455) isulan
Roads and bridges · Isulan · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) along sna-kalamansig road, Tinalon section, Sna, K1873+200 to k1874+689, (chainage 26200 to chainage 27690)
Roads and bridges · Sen. Ninoy Aquino · 2017 · ROBETH CONST. AND DEV'T. CORP.
₱86.6MCompleted · 100%
Construction of roads and drainage system at laura drive, Taguig city
Roads and bridges · Bagumbayan · 2017 · KAI CONSTRUCTION
₱1.9MCompleted · 100%
Upgrading (unpaved to paved) along sna-lebak-kalamansig road, Tinalon, K1864+471 to k1866+182, (chainage 17471 to chainage 19181)
Flood control · Sen. Ninoy Aquino · 2017 · JARGON CONSTRUCTION & SUPPLY
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) along sna-lebak-kalamansig road, Tinalon, K1866+182 to k1868+352, (chainage 19181 to chainage 21351)
Flood control · Sen. Ninoy Aquino · 2017 · LEGACY CONSTRUCTION CORPORATION
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) of awang upi-lebak-kalamansig-palimbang-sarangani road, K1978+(-072)- k1980+080 (chainage 807-chainage 2959)
Flood control · Palimbang · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱144.6MCompleted · 100%
Upgrading (unpaved to paved) along awang-upi-lebak-kalamansig-palimbang-sarangani road, K1983+999 to k1985+000, (chainage 6879 to chainage 7780), K1990+717-k1992+809 (chainage 13596-chainage15688)
Flood control · Palimbang · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱144.7MCompleted · 100%
Upgrading (unpaved to paved along awang-upi-lebak-kalamansig-palimbang-sarangani road, K1982+299 to k1983+999, (chainage 5179 to chainage 6879)
Flood control · Palimbang · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) of awang-upi-lebak-kalamansig-palimbang-sarangani road, K1980+080 - k1982+299, (chainage 2959 - chainage 5179)
Flood control · Palimbang · 2017 · GEMMA CONSTRUCTION SUPPLY, INC.
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) along sna-lebak-kalamansig road, Tinalon section, Sna, K1870+651 to k1872+794, ( chainage 23651 to chainage 25794), K1872+803-k1873+200 ( chainage 25803 - chainage 26200)
Flood control · Sen. Ninoy Aquino · 2017 · ABU CONSTRUCTION
₱144.7MCompleted · 100%
Upgrading (unpaved to paved) along sna-lebak-kalamansig road, Tinalon section, Sna, K1868+352 to k1870+651, (chainage 21351 to chainage 23651)
Flood control · Sen. Ninoy Aquino · 2017 · ABU CONSTRUCTION
₱144.6MCompleted · 100%
Construction of covered court (multi-purpose building), Brgy. poblacion
Buildings · Kalamansig · 2017 · ROBETH CONST. AND DEV'T. CORP.
₱4.7MCompleted · 100%
Widening of gansing bridge from 2 lanes to 4 lanes along dulawan-marbel road (b00291mn) k1757+398-1757+418.6, Gansing
Roads and bridges · Tacurong City · 2017 · ROBETH CONST. AND DEV'T. CORP.
₱19.1MCompleted · 100%
Repair of deck, Main structures, Slope or bank protection and approaches at kalawag bridge (b00289mn) along kid.-allah jct. rd.
Roads and bridges · Isulan · 2017 · FPJ CONSTRUCTION AND SUPPLY
₱5.6MCompleted · 100%
Construction of senior citizen building (mpb - 7m x 8m), Brgy. bugso
Buildings · Sen. Ninoy Aquino · 2017 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱989KCompleted · 100%
Const. of river control along ala river (panas- bambad section), Ko+000-ko+210
Flood control · Isulan · 2017 · AJYSC MARKETING
₱18.5MCompleted · 100%
Construction of barangay hall building (mpb - 7m x 8m) brgy. sewood
Buildings · Sen. Ninoy Aquino · 2017 · COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME
₱990KCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M