National projects
1628projects
₱32.59Bin all
109ongoing
1slow
- Roads and bridges ₱17.68B
- Flood control ₱9.83B
- Buildings ₱2.97B
- Schools ₱1.41B
- Other ₱466.9M
- Water ₱234.2M
Showing 121 to 150 of 1,628
Construction of flood mitigation structure-construction of flood control structure, Dalol river (telafas section - upstream)
Flood control · Columbio · 2025 · ABU CONSTRUCTION
₱96.0MOn-Going · 100%
Construction of multi-purpose building, Dpwh sultan kudarat first district engineering office, Barangay kalawag ii
Buildings · Isulan · 2025 · C.A.V. BUILDERS AND SUPPLY CORPORATION
₱4.9MOn-Going · 100%
Construction of flood mitigation structure-construction of lambayong ris protection dike downstream of dam
Flood control · Isulan · 2025 · FPJ CONSTRUCTION AND SUPPLY
₱14.6MOn-Going · 100%
Construction of river bank protection at bagumbayan river, Barangay poblacion
Flood control · Bagumbayan · 2025 · EINS HANA CONSTRUCTION CORPORATION / RELY CONSTRUCTION & SUPPLY INC.
₱121.7MCompleted · 100%
Rehabilitation/major repair of bridge - upper limulan br. (b01782mn) along sna-lebak-kalamansig rd
Roads and bridges · Kalamansig · 2025 · JV CONSTECH
₱24.5MCompleted · 100%
Rehabilitation/major repair of bridge - bagumbayan br. (b00608mn) along isulan jct. - ninoy aquino rd (phase ii)
Roads and bridges · Bagumbayan · 2025 · ADDED CONSTRUCTION SERVICES
₱23.6MCompleted · 100%
Construction of riverbank protection/flood control at ala river, Barangay salabaca
Flood control · Esperanza · 2025 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱37.2MTerminated · 100%
Construction of multi-purpose building, Barangay kulaman
Buildings · Sen. Ninoy Aquino · 2025 · CS CONST. AND SUPPLY INC.
₱8.1MCompleted · 100%
Rehabilitation/major repair of brdge - sebayor br. 4 (b01872mn) along awang-upi-lebak-kalamansig-palimbang-sarangani rd
Other · Kalamansig · 2025 · ADDED CONSTRUCTION SERVICES
₱17.5MCompleted · 100%
Construction of river bank protection (upstream left side), Barangay barongis
Flood control · Palimbang · 2025 · CS CONST. AND SUPPLY INC. / GOLDEN BETA FABRICATION SOLUTIONS INC.
₱120.6MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay santo niño
Buildings · Bagumbayan · 2025 · ALBANOR CONSTRUCTION
₱2.9MCompleted · 100%
Construction of multi-purpose building, Barangay salangsang
Buildings · Lebak · 2025 · JV CONSTECH
₱4.8MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay pansud
Buildings · Lebak · 2025 · JV CONSTECH
₱2.4MCompleted · 100%
Construction of concrete road - nrj to sitio sewal leading to lagbasan cave passing thru burial cave, Brgy. kuden
Roads and bridges · Sen. Ninoy Aquino · 2025 · ADDED CONSTRUCTION SERVICES
₱9.5MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay christianuevo
Buildings · Lebak · 2025 · JV CONSTECH
₱3.8MCompleted · 100%
Construction of multi-purpose building (gymnasium), Barangay masiag
Buildings · Bagumbayan · 2025 · ALBANOR CONSTRUCTION
₱4.8MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay kolongkolong
Buildings · Palimbang · 2025 · PSN CONSTRUCTION & SUPPLY
₱2.9MCompleted · 100%
Construction of multi-purpose building, Barangay bugso
Buildings · Sen. Ninoy Aquino · 2025 · BULLDOG ENGINEERING
₱4.8MCompleted · 100%
Construction of multi-purpose building, Barangay poblacion
Buildings · Palimbang · 2025 · JV CONSTECH
₱4.8MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Baliango elementary school, Barangay baliango
Schools · Palimbang · 2025 · PSN CONSTRUCTION & SUPPLY
₱3.8MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay sangay
Buildings · Kalamansig · 2025 · PSN CONSTRUCTION & SUPPLY
₱2.9MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay christianuevo
Buildings · Lebak · 2025 · JV CONSTECH
₱2.4MCompleted · 100%
Reconstruction to concrete pavement - awang-upi-lebak-kalamansig-palimbang-sarangani rd - k1998+000 - k1999+197
Roads and bridges · Palimbang · 2025 · CS CONST. AND SUPPLY INC.
₱21.0MCompleted · 100%
Reconstruction to concrete pavement - awang-upi-lebak-kalamansig-palimbang-sarangani rd - k2006+000 - k2006+892
Roads and bridges · Palimbang · 2025 · CS CONST. AND SUPPLY INC.
₱15.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay tibpuan
Buildings · Lebak · 2025 · JV CONSTECH
₱1.8MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay santa clara
Buildings · Kalamansig · 2025 · PSN CONSTRUCTION & SUPPLY
₱1.9MCompleted · 100%
Reconstruction to concrete pavement - awang-upi-lebak-kalamansig-palimbang-sarangani rd - k2029+246 - k2030+000, K2044+087 - k2044+387
Roads and bridges · Palimbang · 2025 · CS CONST. AND SUPPLY INC.
₱18.4MCompleted · 100%
Construction of multi-purpose building, Barangay limulan
Buildings · Kalamansig · 2025 · PHILTIL CONSTRUCTION
₱4.8MCompleted · 100%
Construction of 1-storey 4-classroom school building, Dante integrated school, Barangay monteverde
Schools · Bagumbayan · 2024 · BULLDOG ENGINEERING
₱12.2MCompleted · 100%
Construction (completion) of multi-purpose building (gymnasium), Barangay salumping
Buildings · Esperanza · 2025 · FOUR S CONSTRUCTION SERVICES
₱3.8MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
JV CONSTECH167 projects · ₱778.0M
2
CS CONST. AND SUPPLY INC.160 projects · ₱2.74B
3
FPJ CONSTRUCTION AND SUPPLY91 projects · ₱709.0M
4
JARGON CONSTRUCTION & SUPPLY85 projects · ₱2.34B
5
COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME73 projects · ₱464.6M